Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20214P999 + (06:05:10, 4 December 2024)
- ML20214P998 + (06:05:11, 4 December 2024)
- ML20214P995 + (06:05:12, 4 December 2024)
- ML20214P996 + (06:05:12, 4 December 2024)
- 05000529/LER-1986-026-01, :on 860825,reactor Trip Occurred,Initiated by Main Turbine Generator Trip.Caused by Loss of Generator Excitation Due to Transducer Calibr at Unnecessarily Low Value.Transducer Recalibr + (06:05:14, 4 December 2024)
- ML20214P992 + (06:05:16, 4 December 2024)
- ML20214P991 + (06:05:17, 4 December 2024)
- ML20214P989 + (06:05:18, 4 December 2024)
- ML20214P988 + (06:05:18, 4 December 2024)
- ML20214P987 + (06:05:19, 4 December 2024)
- ML20214P986 + (06:05:20, 4 December 2024)
- ML20214P984 + (06:05:21, 4 December 2024)
- ML20214P985 + (06:05:21, 4 December 2024)
- 05000327/LER-1980-041-03, /03X-3:on 800430,sample Isolation Valves 1FCV-90-108,-109,-110,-114,-115 & -116 Closed.Caused by Isolation of Nonessential Control Air to Sample Valves. Control Air Restored & Valves Reopened + (06:05:23, 4 December 2024)
- ML20214P979 + (06:05:23, 4 December 2024)
- ML20214P978 + (06:05:25, 4 December 2024)
- ML20214P977 + (06:05:25, 4 December 2024)
- 05000354/LER-1986-052, :on 860820,discovered That One Temp Element Used in Channel B Suppression Pool Temp Monitoring Sys Averaging Circuit Not Verified Operable.Caused by Design Drawing Deficiency + (06:05:27, 4 December 2024)
- ML20214P973 + (06:05:27, 4 December 2024)
- IR 05000353/1987004 + (06:05:30, 4 December 2024)
- ML20214P971 + (06:05:31, 4 December 2024)
- ML20214P970 + (06:05:32, 4 December 2024)
- ML20214P968 + (06:05:32, 4 December 2024)
- ML20214P966 + (06:05:33, 4 December 2024)
- ML20214P967 + (06:05:33, 4 December 2024)
- ML20214P965 + (06:05:34, 4 December 2024)
- 05000302/LER-1977-104-01, /01t-1:on 770902,four RCS Flow Instruments Discovered Out of Calibr.Caused by Calibr Drift of Differential Pressure Transmitters.Transmitters Replaced. Instruments Will Be Calibr Every 18 Months + (06:05:36, 4 December 2024)
- ML20214P963 + (06:05:36, 4 December 2024)
- ML20214P962 + (06:05:37, 4 December 2024)
- ML20214P960 + (06:05:37, 4 December 2024)
- ML20214P959 + (06:05:38, 4 December 2024)
- ML20214P958 + (06:05:39, 4 December 2024)
- ML20214P956 + (06:05:41, 4 December 2024)
- 05000416/LER-1986-028, :on 860825,reactor Automatically Scrammed in Response to Inadvertent Fast Closure of Turbine Control Valves.Caused by Actuation of Main Generator Load Reject Circuitry Due to Personnel Error + (06:05:41, 4 December 2024)
- ML20214P955 + (06:05:42, 4 December 2024)
- ML20214P954 + (06:05:43, 4 December 2024)
- IR 05000293/1987017 + (06:05:59, 4 December 2024)
- ML20214P952 + (06:06:00, 4 December 2024)
- ML20214P948 + (06:06:01, 4 December 2024)
- ML20214P949 + (06:06:01, 4 December 2024)
- ML20214P947 + (06:06:02, 4 December 2024)
- ML20214P946 + (06:06:02, 4 December 2024)
- ML20214P943 + (06:06:03, 4 December 2024)
- ML20214P941 + (06:06:04, 4 December 2024)
- ML20214P942 + (06:06:04, 4 December 2024)
- ML20214P939 + (06:06:05, 4 December 2024)
- ML20214P940 + (06:06:05, 4 December 2024)
- ML20214P938 + (06:06:10, 4 December 2024)
- ML20214P937 + (06:06:10, 4 December 2024)
- ML20214P935 + (06:06:12, 4 December 2024)
- ML20214P934 + (06:06:12, 4 December 2024)
- ML20214P932 + (06:06:13, 4 December 2024)