Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20215G948 + (03:19:27, 4 December 2024)
- ML20215G943 + (03:19:28, 4 December 2024)
- ML20215G939 + (03:19:29, 4 December 2024)
- ML20215G942 + (03:19:29, 4 December 2024)
- ML20215G935 + (03:19:30, 4 December 2024)
- ML20215G929 + (03:19:31, 4 December 2024)
- ML20215G932 + (03:19:31, 4 December 2024)
- ML20215G924 + (03:19:32, 4 December 2024)
- ML20215G921 + (03:19:33, 4 December 2024)
- ML20215G922 + (03:19:33, 4 December 2024)
- ML20215G919 + (03:19:34, 4 December 2024)
- ML20215G918 + (03:19:34, 4 December 2024)
- ML20215G914 + (03:19:35, 4 December 2024)
- ML20215G910 + (03:19:37, 4 December 2024)
- 05000254/LER-1987-009-07, :on 870526,w/plant at 100% Core Thermal Power, Cable Spreading Room Sprinkler Exceeded 14-day Reporting Criteria Due to Being Out of Svc for Sys Enhancements. Similar Event Occurred on 870603.Mod Continues + (03:19:40, 4 December 2024)
- ML20215G906 + (03:19:40, 4 December 2024)
- AECM-86-0317, Monthly Operating Rept for Sept 1986 + (03:19:41, 4 December 2024)
- A06651, Responds to & Request for Addl Info Re Timeliness of Submittals.Util Characterized as Being Late in Submitting Info Per NRC Requests for Addl Info.Util Will Devote Rigorous Efforts to Improve Timeliness of Submittals + (03:19:41, 4 December 2024)
- IR 05000266/1987005 + (03:19:43, 4 December 2024)
- 05000265/LER-1987-001, :on 870103,1/2 Diesel Generator Failed to auto- Start During Core Spray Logic Testing.Caused by Design Error in Electrical Wiring Drawing.Ground Isolated & Fuse Replaced.Wiring Corrected + (03:19:45, 4 December 2024)
- ML20215G892 + (03:19:46, 4 December 2024)
- ML20215G891 + (03:19:47, 4 December 2024)
- ST-HL-AE-2263, Forwards Annotated Revs to FSAR Sections 6.2.1.4 & 10.4.7, Tables 6.2.4-2 & 15.1-1 & Figure 6.2.4-1 (Sheets 6-9) Re Closure Time for Main Feedwater Isolation Valves.Changes Result from Startup Testing.Values Will Be Incorporated + (03:19:48, 4 December 2024)
- ML20215G887 + (03:19:48, 4 December 2024)
- SNRC-1344, Advises That Change of Power Supply for Alternate Rod Insertion Sys Trip Logic to Uninterruptible Source Installed,Per 870526 Committment + (03:19:49, 4 December 2024)
- ML20215G876 + (03:19:52, 4 December 2024)
- ML20215G875 + (03:19:53, 4 December 2024)
- PNO-V-87-045, licensee Discovered Seperation Between Base Plate Grout & Concrete on Support SS-81 on Main Steam Line B.On 870616,dynamic Analysis Reperformed for Main Steam Supports.Supports Reinstalled W/Proper Design Loads + (03:19:53, 4 December 2024)
- ST-HL-AE-2069, Forwards marked-up Rev to FSAR Section 2.5.6 Re Embankment Settlement,Changing Settlement Estimate from 1 to 2 Inches to 2 to 4 Inches.Proposed SER Revs Also Encl + (03:19:54, 4 December 2024)
- 05000528/LER-1986-054, :on 860914,Limiting Condition for Operation 3.0.3 Entered Due to Inoperable Msiv.Caused by Inconsistent Tech Specs.Tech Spec Rev to Allow Testing W/O Inoperability Condition Will Be Pursued + (03:19:56, 4 December 2024)
- ML20215G868 + (03:19:56, 4 December 2024)
- ML20215G865 + (03:19:57, 4 December 2024)
- ML20215G864 + (03:19:57, 4 December 2024)
- ML20215G862 + (03:19:58, 4 December 2024)
- ML20215G857 + (03:19:59, 4 December 2024)
- ML20215G858 + (03:19:59, 4 December 2024)
- 0CAN108602, Forwards Addl Info in Response to IE Bulletin 85-003 Re motor-operated Valve Common Mode Failures.Method to Determine Differential Pressure Across Valves & to Estimate Switch Settings Addressed + (03:20:00, 4 December 2024)
- ML20215G850 + (03:20:01, 4 December 2024)
- IR 05000461/1986064 + (03:20:03, 4 December 2024)
- ML20215G848 + (03:20:04, 4 December 2024)
- ML20215G846 + (03:20:04, 4 December 2024)
- ML20215G845 + (03:20:05, 4 December 2024)
- ML20215G843 + (03:20:06, 4 December 2024)
- ML20215G835 + (03:20:07, 4 December 2024)
- ML20215G833 + (03:20:07, 4 December 2024)
- 05000155/LER-1987-007-01, :on 870518,reactor Protection Sys Actuation Occurred During Normal Reactor Shutdown.Caused by Susceptibility of Picoameters to Electrical Noise at Low Neutron Flux Levels + (03:20:10, 4 December 2024)
- ML20215G829 + (03:20:10, 4 December 2024)
- ML20215G827 + (03:20:11, 4 December 2024)
- ML20215G821 + (03:20:12, 4 December 2024)
- ML20215G820 + (03:20:12, 4 December 2024)
- 3F1086-11, Suppl 2 to Tech Spec Change Request 139,amending License DPR-72 to Reduce Frequency of Diesel Generator Cold Fast Start Tests to Semiannual.Amend Fee Submitted W/Original Request on 851028.W/Certificate of Svc + (03:20:13, 4 December 2024)
- ML20215G816 + (03:20:13, 4 December 2024)