- 05000348/LER-1979-050-03, /03L-0:on 791107,trip Bistables for Pressurizer Pressure Transmitter PT455 Not Tripped Before Pressurizer Level Transmitter 459 Root Valves Closed.Caused by Personnel Error.Matter to Be Discussed W/Operations Personnel + (14:24:32, 3 January 2025)
- ML19262A937 + (14:24:34, 3 January 2025)
- 05000302/LER-1979-105-03, /03L-0:on 791101,during Sampling of Rcs,Chemical Addition Isolation Valve CAV-2 Would Not Close.Cause Unknown.Valve Body of CAV-2 Lubricated,Satisfactorily Tested & Returned to Svc on 791102 + (14:24:35, 3 January 2025)
- 05000302/LER-1979-105, Forwards LER 79-105/03L-0 + (14:24:37, 3 January 2025)
- 05000333/LER-1979-100-03, /03L-0:on 791108,during Normal Operation to Complete Corrective Maint,Hpci Sys Unintentionally Made Inoperable.Caused by Need to Replace Leaking Gasket Associated W/Sys Hydraulic Control Valve Seat Drain + (14:24:39, 3 January 2025)
- 05000333/LER-1979-100, Forwards LER 79-100/03L-0 + (14:24:41, 3 January 2025)
- 05000312/LER-1979-003-04, /04T-0:on 791120,plant Effluent Sample Exceeded Tech Spec Limit of 0.2 Mg/L Chlorine.Caused by Excessive Flow in Plant Sewage Sys + (14:24:43, 3 January 2025)
- 05000312/LER-1979-003, Forwards LER 79-003/04T-0 + (14:24:45, 3 January 2025)
- 05000321/LER-1979-091-03, /03L-0:on 791106,insurance Investigation Revealed Required Penetration Seal Not Installed in 2-inch Penetration in Control/Svc Bldg Firewall.Caused by Misinterpreted Drawings.Seal Installed + (14:24:47, 3 January 2025)
- 05000321/LER-1979-091, Forwards LER 79-091/03L-0 + (14:24:49, 3 January 2025)
- ML19262A924 + (14:24:50, 3 January 2025)
- ML19262A923 + (14:24:51, 3 January 2025)
- 05000219/LER-1979-042-03, /03L-0:on 791106,valve ERV Nr 108A Opened During Operation for No Reason.After Calibr,Valve Malfunctioned within 1-h.Caused by Component Failure.Pressure Switch Replaced + (14:24:52, 3 January 2025)
- ML19262A921 + (14:24:54, 3 January 2025)
- 05000219/LER-1979-042, Forwards LER 79-042/03L-0 + (14:24:55, 3 January 2025)
- ML19262A918 + (14:24:56, 3 January 2025)
- 05000293/LER-1979-043-03, /03L-0:on 791108,drywell Unidentified Leakage Rate Exceeded Tech Specs.Caused by Leakage Passing Inboard Isolation Valve MO-2301-4 on HPCI Sys.Valve Backseated & Leakage Reduced to Less than That Requiring Shutdown + (14:24:58, 3 January 2025)
- 05000293/LER-1979-043, Forwards LER 79-043/03L-0 + (14:25:03, 3 January 2025)
- ML19262A914 + (14:25:05, 3 January 2025)
- ML19262A913 + (14:25:06, 3 January 2025)
- ML19262A912 + (14:25:10, 3 January 2025)
- ML19262A911 + (14:25:14, 3 January 2025)
- ML19262A909 + (14:25:16, 3 January 2025)
- ML19262A908 + (14:25:17, 3 January 2025)
- ML19262A906 + (14:25:19, 3 January 2025)
- 05000029/LER-1979-030-03, /03L-0:on 791109,during Safety Injection Accumulator Time Delay Verification Procedure OP-4630,TDC4 Setpoint Discovered to Be Beyond Tech Spec Limit.Cause Under Investigation.Temporarily Replaced Time Delay Relay + (14:25:23, 3 January 2025)
- 05000029/LER-1979-030, Forwards LER 79-030/03L-0 + (14:25:30, 3 January 2025)
- 05000029/LER-1979-029-03, /03L-0:on 791106,during Testing of post-accident Hydrogen Venting sys,HV-SOV-1 & 2 Failed to Seat Properly. Caused by Oil & Dirt Buildup on Valve Internals.Valves Cleaned,Inspected & Returned to Svc + (14:25:35, 3 January 2025)
- 05000029/LER-1979-029, Forwards LER 79-029/03L-0 + (14:25:41, 3 January 2025)
- IR 05000546/1979019 + (14:25:47, 3 January 2025)
- ML19262A895 + (14:25:49, 3 January 2025)
- 05000333/LER-1979-101-03, /03L-0:on 791108,during Operations Surveillance Test F-ST-76L,six Penetrations Discovered Not Sealed During Plant Const.Cause Not Stated.Penetrations Sealed w/3-h Rated Matl & Performed Fire Watch + (14:26:33, 3 January 2025)
- ML19262A892 + (14:26:38, 3 January 2025)
- 05000333/LER-1979-101, Forwards LER 79-101/03L-0 + (14:27:13, 3 January 2025)
- ML19262A889 + (14:27:17, 3 January 2025)
- ML19262A888 + (14:27:19, 3 January 2025)
- ML19262A887 + (14:27:20, 3 January 2025)
- ML19262A886 + (14:27:21, 3 January 2025)
- ML19262A884 + (14:27:23, 3 January 2025)
- ML19262A883 + (14:27:25, 3 January 2025)
- ML19262A882 + (14:27:26, 3 January 2025)
- ML19262A881 + (14:27:28, 3 January 2025)
- ML19262A880 + (14:27:30, 3 January 2025)
- ML19262A878 + (14:27:31, 3 January 2025)
- IR 05000370/1979018 + (14:27:33, 3 January 2025)
- ML19262A876 + (14:27:35, 3 January 2025)
- ML19262A875 + (14:27:37, 3 January 2025)
- ML19262A874 + (14:27:38, 3 January 2025)
- ML19262A873 + (14:27:39, 3 January 2025)
- ML19262A872 + (14:27:41, 3 January 2025)