Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20236L524 + (06:13:27, 3 December 2024)
- ML20236L520 + (06:13:28, 3 December 2024)
- ML20236L522 + (06:13:28, 3 December 2024)
- ML20236L519 + (06:13:29, 3 December 2024)
- IR 05000324/1987021 + (06:13:38, 3 December 2024)
- ML20236L515 + (06:13:39, 3 December 2024)
- ML20236L516 + (06:13:39, 3 December 2024)
- ML20236L512 + (06:13:40, 3 December 2024)
- ML20236L514 + (06:13:40, 3 December 2024)
- NUREG-0302, Ack Receipt of Re 10CFR21.Part 21 Only Requires That Internal Procedures for Evaluating & Reporting Identify Responsible Officer.Rev 1 to NUREG-0302 Encl to Clarify Issue.W/O Encl + (06:13:41, 3 December 2024)
- ML20236L510 + (06:13:43, 3 December 2024)
- ST-HL-AE-2318, Proposed Change to Final Draft Tech Spec 3/4.3.4,modifying Surveillance Requirement 4.3.4.2.d to Not Require Disassembly & Insp of Turbine Reheat Intercept Valve Prior to First 40-month Interval + (06:13:47, 3 December 2024)
- ML20236L507 + (06:13:47, 3 December 2024)
- ML20236L506 + (06:13:48, 3 December 2024)
- ML20236L505 + (06:13:48, 3 December 2024)
- ML20236L504 + (06:13:49, 3 December 2024)
- ML20236L503 + (06:13:50, 3 December 2024)
- ML20236L501 + (06:13:51, 3 December 2024)
- ML20236L498 + (06:13:52, 3 December 2024)
- ML20236L495 + (06:13:52, 3 December 2024)
- TXX-6928, Interim Deficiency Rept CP-85-36 Re Installation of non- Safety Related Conduit on non-safety Related Dead Weight Supports.Initially Reported on 850906.Scheduled Completion for Unit 1 by 871231.Next Rept Will Be Submitted by 880301 + (06:13:53, 3 December 2024)
- ML20236L492 + (06:13:54, 3 December 2024)
- ML20236L493 + (06:13:54, 3 December 2024)
- ML20236L489 + (06:13:55, 3 December 2024)
- ML20236L487 + (06:13:56, 3 December 2024)
- ML20236L488 + (06:13:56, 3 December 2024)
- 05000334/LER-1998-024, :on 980604,discovered Internal Flooding Discrepancy in Intake Structure Pump Cubicles.Caused by Inadequate Consideration of Effects Re Postulated Internal Flooding.Closed Flood Doors of Pump Cubicles + (06:13:58, 3 December 2024)
- ML20236L484 + (06:13:58, 3 December 2024)
- ML20236L483 + (06:13:59, 3 December 2024)
- ML20236L482 + (06:13:59, 3 December 2024)
- ML20236L481 + (06:14:00, 3 December 2024)
- ML20236L477 + (06:14:01, 3 December 2024)
- ML20236L478 + (06:14:01, 3 December 2024)
- ML20236L476 + (06:14:02, 3 December 2024)
- ML20236L474 + (06:14:02, 3 December 2024)
- ML20236L473 + (06:14:03, 3 December 2024)
- ML20236L471 + (06:14:05, 3 December 2024)
- ML20236L468 + (06:14:06, 3 December 2024)
- ML20236L470 + (06:14:06, 3 December 2024)
- ML20236L467 + (06:14:07, 3 December 2024)
- ML20236L464 + (06:14:08, 3 December 2024)
- ML20236L466 + (06:14:08, 3 December 2024)
- B12722, Forwards Millstone Unit 3 Natural Circulation Sys Comparison, Per NUREG-1031 (SER) Requirements.Plant Meets Testing Comparison Requirement of Branch Technical Position Rsb 5-1, Design Requirements for RHR Sys & Ser.Fee Paid + (06:14:09, 3 December 2024)
- 05000341/LER-1987-049, :on 870925,three Deficiencies Identified in Fire Protection Program.Cause Not Stated.Fire Brigade Training Program Revised,Valve Locked Into Position, Procedure Revised & Training Classes Held + (06:14:11, 3 December 2024)
- IR 05000373/1998001 + (06:14:18, 3 December 2024)
- ML20236L457 + (06:14:18, 3 December 2024)
- ML20236L456 + (06:14:19, 3 December 2024)
- ML20236L454 + (06:14:20, 3 December 2024)
- 05000443/LER-1987-017, :on 871007,Surveillance Procedure OX1456.24 Did Not Satisfy Tech Spec Surveillance Requirements.Caused by Procedure Inadequacy.Affected Procedures Revised to Include Continuity Check + (06:14:22, 3 December 2024)
- ML20236L452 + (06:14:22, 3 December 2024)
- ML20236L451 + (06:14:23, 3 December 2024)
- IR 05000295/1998007 + (06:14:24, 3 December 2024)