Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- DD-81-20, Order Extending Time Until 820913 for Commission to Act to Review Directors Decision DD-81-20 + (03:15:30, 27 May 2025)
- 05000366/LER-1982-051-03, /03L-0:on 820609,diesels 2A & 1A Not Tested at Appropriate Test Frequency Due to Misinterpretation of Tech Specs.Caused by Diesel Having Own Test Frequency Based on Failure Rate.Correct Test Frequency Established + (03:15:40, 27 May 2025)
- 05000272/LER-1982-040-03, /03L-0:on 820616,filter Failure Alarm Received on containment-plant Vent Radioactivity Monitor.Caused by Exhausted Filter Paper Supply Roll Due to Clearing Filter in Fast Mode.New Roll Installed.Personnel Counseled + (03:15:43, 27 May 2025)
- IR 05000313/1981022 + (03:16:21, 27 May 2025)
- 05000366/LER-1982-064-03, /03L-0:on 820611,standby Gas Treatment Fan B Failed to Start Manually to Purge & Vent Drywell.Caused by Setpoint Drift.Heater Contractor Replaced,Reactor Head Cooling Setpoints Recalibr & Sys Tested + (03:16:25, 27 May 2025)
- 05000361/LER-1982-019-03, /03L-0:on 820604,during Surveillance Testing,Inlet Heater to a Train HEPA Filter/Charcoal Absorber Assembly Cycled on & Off W/No Variation in Air Flow.Caused by Improper Flow Control Switch Selection.Jumpers Installed + (03:16:26, 27 May 2025)
- 05000346/LER-1982-029-03, /03L-0:on 820608,essential Inverter YV2 Failed, de-energizing 120-volt Ac Essential Bus Y2 & Source Range Detector NI-l.Caused by Component Failure within Regulated Rectifier YRF2.Inverter Y2 Energized + (03:16:31, 27 May 2025)
- 05000361/LER-1982-034-01, /01T-0:on 820621,discrepancies Discovered Involving Reactor Coolant Pump & Control Element Assembly. Caused by Incorrect Signal Wiring Connections to Core Protection Calculator from Control Element Assembly Inputs + (03:16:34, 27 May 2025)
- 05000249/LER-1982-027-01, /01T-0:on 820629,isolation Valve for HPCI Pressure Switch 3-2389D Developed Leak Which Depressurized Sensing Line.Caused by Loose Packing on Isolation Valve to Pressure Switch.Packing Nut Tightened + (03:16:36, 27 May 2025)
- 05000366/LER-1982-059-03, /03L-0:on 820627,RHR Svc Water Pump Failed to Achieve Rated Discharge Pressure & Declared Inoperable. Caused by Leak Through Air Release Valve.Valve Flushed. Flanges Tightened.Sys Returned to Svc + (03:16:38, 27 May 2025)
- 05000346/LER-1982-027-03, /03L-0:on 820608,combined Leakage for All Containment Penetration Valves Exceeded Tech Spec Limits. Caused by Component Failure W/Two Valves Failing Due to Misapplication of Seating Matl.Valves Repaired + (03:16:40, 27 May 2025)
- IR 05000313/1982004 + (03:16:45, 27 May 2025)
- 05000346/LER-1982-028, Forwards LER 82-028/03L-0 + (03:16:47, 27 May 2025)
- 05000361/LER-1982-023-03, /03L-0:on 820608,fire Suppression Water Spray & Sprinkler Sys Initiated by Manual Actuation of Deluge Valve. Cause Not Determined.Alternate Manual Actuators Being Considered + (03:16:50, 27 May 2025)
- 05000315/LER-1982-047-03, /03L-0:on 820622,discovered That Containment Equipment Hatch Double Resilient Seals on Ring Body Flange Had Not Been Type B Leak Tested Since June 1979.Caused by Testing Not Being Included in Existing Procedures + (03:16:52, 27 May 2025)
- 05000293/LER-1982-017-03, /03L-0:on 820603,indicator Scheme on Vacuum Breaker Did Not Function Properly & Required Test to Prove Drywell to Torus Vacuum Breaker Closure Not Performed. Probably Caused by Faulty Limit Switch + (03:16:55, 27 May 2025)
- 05000261/LER-1982-005-01, /01T-0:on 820628,during Refueling Shutdown,Main Steam Check Valve Discovered in Degraded Condition.Caused by Set Screws Loosened on Valve Disc Tail Pieces.All Three Valves Modified to Correct post-mod Deficiency + (03:17:01, 27 May 2025)
- 05000373/LER-1982-042-03, /03L-0:on 820611,level 3 Scram & Isolation Occurred Due to Improper Valve Lineup.Caused by Operator Failure to Recognize Potential Drain Path in Lineup for LST-82-250.Meetings W/Staff to Be Held + (03:17:02, 27 May 2025)
- 05000261/LER-1982-005, Forwards LER 82-005/01T-0 + (03:17:03, 27 May 2025)
- IR 05000482/1982004 + (03:17:08, 27 May 2025)
- IR 05000298/1981019 + (03:17:12, 27 May 2025)
- 05000316/LER-1982-051-03, /03L-0:on 820622,double Resilient Seals on Ring Body Flange & Lock Cover Flange Discovered Not Type B Leak Rate Tested.Caused by Seals Not Being Included in Existing Surveillance Procedure + (03:17:19, 27 May 2025)
- 05000336/LER-1982-021-03, /03L-0:on 820604,during Routine Operations,Steam Jet Air Ejector Fire Damper 2-EB-109 Failed Shut.Caused by Failure of Metal Band Required to Hold Damper Open Due to Corrosion.Damper Band,Link & Damper Blades Replaced + (03:17:22, 27 May 2025)
- 05000331/LER-1982-043-03, /03L-0:on 820624,pressure Differential Switches Which Control Reactor Bldg to Suppression Chamber Vacuum Breakers Cv 4304 & Cv 4305 Tripped Out of Spec.Caused by Instrument Drift.Switches Recalibr.Surveillance Continuing + (03:17:28, 27 May 2025)
- 05000373/LER-1982-039-03, /03L-0:on 820609,during Placement of RHR 1A Loop Into Shutdown Cooling Mode,Leakage Discovered at Pump 1A Suction Line.Caused Possibly by Thermal Growth.Leaking Spool Tightened & Leak Repaired + (03:17:29, 27 May 2025)
- 05000247/LER-1982-023-03, /03L-0:on 820606,boron Injection Tank Level Channel 944E Drifted High.Caused by Failure of Bellows Assembly of Associated Level Transmitter.Transmitter Replaced.Failed Channel Replaced W/Spare Channel 944J + (03:17:31, 27 May 2025)
- 05000316/LER-1982-052-03, /03L-0:on 820611,work Bench Found Obstructing Path for Rollup Fire Door Between Two 600-volt Switchgear Areas. Personnel Responsible Not Located.Work Bench Removed.Video Film Being Prepared to Increase Awareness of Requireme + (03:17:36, 27 May 2025)
- 05000331/LER-1982-040-03, /03L-0:on 820610,during Cold Shutdown Surveillance Testing,Jacket Coolant Sys on Standby Generator Found Leaking.Caused by Brass Pipe Nipple Broken by Weight of Pressure Indicator & Piping.Nipple Replaced + (03:17:37, 27 May 2025)
- NUREG-0712, Forwards Suppl 6 to SER,NUREG-0712.W/o Encl + (03:17:47, 27 May 2025)
- TAC:43663 + (03:18:46, 27 May 2025)
- A02357, Ro:On 820629,primary to Secondary Leakage Rate Increased. Caused by Erosion & Thermal Cycling.Prompt Corrective Action Initiated for Leakage in Excess of 0.5 Gpm Per Steam Generator + (03:18:53, 27 May 2025)
- 05000364/LER-1982-025-03, /03L-0:on 820609,containment Atmosphere Activity Monitor R-11 (Particulate Monitor) Declared Inoperable When Vacuum Pump Tripped Due to Erroneous High Flow Signal.Caused by Faulty High Flow Relay.Relay Replaced + (03:19:24, 27 May 2025)
- 05000327/LER-1982-071-03, /03L-0:on 820607,control Room Emergency Ventilation Train a Failed Min Sys Flow Rate.Caused by Airflow Vibration Partially Closing Manual Suction Dampers Supplying Emergency Air Cleanup Fans.Dampers Adjusted + (03:19:28, 27 May 2025)
- 05000321/LER-1982-057-03, /03L-0:on 820615,reactor Coolant Activity Exceeded Tech Spec Limit.Caused by Condenser Tube Leaks During Time When Radwaste Could Not Process Water Needed to Backwash Condensate Demineralizers.Leaks Plugged + (03:19:31, 27 May 2025)
- IR 05000508/1981014 + (03:19:36, 27 May 2025)
- 05000366/LER-1982-065-03, /03L-0:on 820618,standby Liquid Control Storage Tank Sodium Pentaborate Concentration Fell Below Tech Spec Limit.Caused by Depletion of Sodium Pentaborate.Sodium Pentaborate Added + (03:19:38, 27 May 2025)
- 05000321/LER-1982-056-03, /03L-0:on 820614,thermal Calculation P-1 Revealed That Core Max Fraction of Limiting Power Density Exceeded Tech Spec Limits.Caused by Personnel Error.Personnel Reinstructed + (03:19:39, 27 May 2025)
- 05000321/LER-1982-059-03, /03L-0:on 820617,personnel Discovered That Fire Protection Isolation Valves Position & Lubrication Checks Were Not Performed for May 1982.Caused by Personnel Error. Personnel Counseled in Importance of Meeting Time Frames + (03:19:45, 27 May 2025)
- 05000416/LER-1982-001-01, /01T-0:on 820618,loss of Dc Power to Div II Diesel Generator Control Circuit Detected.Caused by Failure of Main Fuses to Dc Control Panel Due to Fault in Circuitry of Semiconductor Annunciator module,SAM-2.Module Bypassed + (03:19:50, 27 May 2025)
- 05000366/LER-1982-034-03, /03L-0:on 820622,control Room Received Low Pressure Alarm on Hydraulic Control Unit 26-19.Caused by Setpoint Drift.Pressure Switch Recalibr & Returned to Svc + (03:20:07, 27 May 2025)
- 05000327/LER-1982-074-03, /03L-0:on 820605,train B Automatic Control Valve 1-LCV-3-171 & Train a Valve 1-PCV-3-122 Declared Inoperable. Inoperability Caused by Failed Controller & Failed Hydraulic Pump Motor Due to Deadheaded Pump + (03:20:12, 27 May 2025)
- 05000325/LER-1982-063-03, /03L-0:on 820609,erratic post-accident Monitoring Control Room Recorder/Indicator,Indications & Recordings Received.Caused by Shifting of Instrument Timing Sequence + (03:20:14, 27 May 2025)
- 05000335/LER-1982-022-03, /03L-0:on 820609,subcooled Margin Monitor Failed to Operate.Caused by 1A2 Tc Input Transmitter Failure.Lead from Transmitter Lifted & Subcooled Monitor Returned to Svc on 820610 + (03:20:18, 27 May 2025)
- 05000327/LER-1982-078-03, /03L-0:on 820613,oxygen Concentration in Waste Gas Decay Tank J Was Higher than Tech Spec Limit W/Hydrogen Concentration Greater than 4%.Caused by Air Leakage in Monitor Sample Lines.Oxygen Concentration Reduced + (03:20:20, 27 May 2025)
- 05000259/LER-1982-039-03, /03L-0:on 820609,fuse 16A-F19 Blew Due to Failure of Coil for Relay 16A-K66B,resulting in Inboard Primary Containment Isolation.Caused by Short in Coil for Relay 16A-K66B.Fuse & Relay Coil Replaced + (03:20:23, 27 May 2025)
- 05000250/LER-1982-008-03, /03L-0:on 820609,3A High Head Safety Injection Pump Failed to Start from Manual Operation of Normal Control Switch.Cause Not Determined.Breaker Control Panel Fuses Replaced & Breaker Racked Out & Backed in + (03:20:28, 27 May 2025)
- 05000280/LER-1982-026-03, /03L-0:on 820618,electrical Penetration Found Improperly Sealed.Caused by Personnel Failure to Restore Penetration to Original State Following Cable Installation. Penetration Sealed + (03:20:30, 27 May 2025)
- 05000280/LER-1982-036-03, /03L-0:on 820611,motor Operated Valve CS-203C Failed to Close During Performance of PT-17.1.Caused by Loose Field Wiring Disconnect Device at Motor Control Ctr Cubicle.Plug Reinserted & Valve Returned to Svc + (03:20:44, 27 May 2025)
- 05000339/LER-1982-035-03, /03L-0:on 820609,RCS Identified Leakage Found to Be Greater than Tech Spec Max.Caused by Packing Leak on Manual Loop Drain Isolation Valves 2-RC-30 & 2-RC-39. Packaging Tightened & Valve 2-RC-30 Replaced + (03:20:54, 27 May 2025)
- 05000339/LER-1982-025-03, /03L-0:on 820613,individual Rod Position Indication for Rod P-08 in Control Bank D Deviated from Group Demand Position More than 12 Steps.Caused by Instrument Drift.Rod P-08 Recalibr & Returned to Svc + (03:20:57, 27 May 2025)
- 05000369/LER-1982-047-03, /03L-0:on 820603,surveillance Interval of Boron Concentration in Boron Acid Storage Tank a Exceeded Tech Specs.Caused by Personnel Error.Operator Counseled.All Operations Personnel Informed of Implications + (03:21:07, 27 May 2025)