Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1981-071, Forwards LER 81-071/03L-0 + (18:38:39, 26 May 2025)
- TAC:M88099 + (18:39:27, 26 May 2025)
- 05000281/LER-1980-010-01, Containment Gaseous & Particulate Radiation Monitor Found to Have One Automatic Function Incapable of Operating During Fuel Movement.Caused by Bypass of Containment Exhaust Fan Relay in Design Change + (18:39:48, 26 May 2025)
- L-02-032, Equivalent Usage Factor for Equipment Qualification + (18:40:36, 26 May 2025)
- 05000346/LER-1981-072-03, /03L-0:on 811105,discovered Three Unsealed Conduits Through Control Room Floor Into Cable Spreading Room.Caused by Procedure Deficiency.Conduits Temporarily Sealed & Reinspected + (18:41:05, 26 May 2025)
- 05000346/LER-1981-072, Forwards LER 81-072/03L-0 + (18:41:14, 26 May 2025)
- PM-81-102, Forwards Monthly Operating Rept for Nov 1981 + (18:41:43, 26 May 2025)
- A810007, Responds to NRC Re Violations Noted in IE Insp Rept 50-298/81-19.Corrective actions:1/2-inch Tolerance Between Weld & Edge of Overlay Was Specified for Dimensional Tolerances + (18:42:25, 26 May 2025)
- ML20062L748 + (18:43:21, 26 May 2025)
- 05000334/LER-1981-001-01, /01P-0:on 810106,IE Bulletin 79-14 Evaluation & Reanalysis of Piping & Supports Revealed H-162,H-164 & H-166 to Be Less Conservative than Original Design.Caused by QA Breakdown + (18:46:59, 26 May 2025)
- 05000277/LER-1980-034-03, /03L-0:on 801210,A RHR Pump Room Coolers Failed to Start Automatically.Caused by Improper Adjustment of Cell Switch on RHR Pump Breaker,Ge Type 4.16-250-84.Breaker Replaced & Satisfactory Surveillance Test Performed + (18:47:36, 26 May 2025)
- IR 05000317/1981025 + (18:47:43, 26 May 2025)
- 05000458/LER-1993-026, :on 931117,isolation of Reactor Core Isolation Cooling Sys Occurred Due to Failure of Relay. Cause Requires Additional Evaluation.Three Relays Replaced & Shipped to Mfg for Analysis + (18:48:02, 26 May 2025)
- TXX-9341, Forwards Rev 8 to Comanche Peak Steam Electric Station Units 1 & 2 Fire Protection Rept + (18:48:12, 26 May 2025)
- 05000277/LER-1980-015-03, /03X-1:on 800904,during Surveillance Testing at Full Power,Reactor Core Isolation Cooling Outboard Steam Supply Isolation Valve MO-2-13-16 Failed to Close.Caused by Improperly Functioning Switch on Limitorque Operator + (18:48:32, 26 May 2025)
- IR 05000277/1993019 + (18:49:27, 26 May 2025)
- IR 05000289/1993008 + (18:49:37, 26 May 2025)
- IR 05000373/1993019 + (18:49:58, 26 May 2025)
- ML20062K163 + (18:50:32, 26 May 2025)
- TAC:M69115 + (18:50:43, 26 May 2025)
- ML20062K105 + (18:50:53, 26 May 2025)
- IR 05000312/1982027 + (18:51:18, 26 May 2025)
- TAC:43514 + (18:51:27, 26 May 2025)
- 05000296/LER-1980-040-03, /03L-0:on 801010,diesel Generator 3EB Lube Oil Circulating Pump Found Inoperable.Caused by Locking of double-row Ball Bearing.Lube Oil Circulating Pump Replaced + (18:52:18, 26 May 2025)
- 05000296/LER-1980-040, Forwards LER 80-040/03L-0 + (18:52:22, 26 May 2025)
- NUREG-0686, Responds to Ltr Expressing Concern Re Release of Kr-85 from Tmi.Potential Physical Health Impact on Public from Using Any of Proposed Strategies for Removing Kr-85 Is Negligible.W/O Supporting Documents + (18:52:25, 26 May 2025)
- IR 05000320/1982006 + (18:53:10, 26 May 2025)
- NUREG-0698, Responds to Expressing Concern Re NUREG-0698.NRC Is Establishing TMI 2 Advisory Panel Consisting of State & Local Govt Representatives,Independent Scientific Community Members & Public + (18:53:13, 26 May 2025)
- ML20062J709 + (18:53:28, 26 May 2025)
- ML20062J629 + (18:53:56, 26 May 2025)
- 05000369/LER-1981-181-03, 125-volt Dc Vital Instrumentation & Control Power Battery Evcb Declared Inoperable & Returned to Svc Twice Before Shutdown.Caused by Low Specific Gravity on Cell 16.Cell Jumpered Out + (18:54:03, 26 May 2025)
- ML20062J606 + (18:54:08, 26 May 2025)
- IR 05000320/1993004 + (18:54:12, 26 May 2025)
- 05000369/LER-1981-181, Forwards Updated LER 81-181/03X-1.Detailed Event Analysis Encl + (18:54:15, 26 May 2025)
- IR 05000460/1982010 + (18:54:40, 26 May 2025)
- ML20062J506 + (18:54:57, 26 May 2025)
- ML20062J501 + (18:55:00, 26 May 2025)
- NUREG-1488, Notice of Draft NUREG 1488, Revised Livermore Seismic Hazard Estimates for 69 Nuclear Power Plant Sites East of Rocky Mountains + (18:55:05, 26 May 2025)
- ML20062J479 + (18:55:12, 26 May 2025)
- TAC:M85956 + (18:55:15, 26 May 2025)
- ML20062J418 + (18:55:34, 26 May 2025)
- ML20062J416 + (18:55:39, 26 May 2025)
- L-93-046, Forwards Update to Hematite Emergency Plan Reflecting Significant Plant Changes + (18:56:00, 26 May 2025)
- 05000318/LER-1980-041-03, /03L-0:on 800915,while Performing Preventive Maint,Control Element Assembly (CEA) 9 Dropped Into Core. Cause Undetermined.Electrical Test of CEA Performed & Recorded Traces Analyzed + (18:56:04, 26 May 2025)
- 05000318/LER-1980-041, Forwards LER 80-041/03L-0 + (18:56:07, 26 May 2025)
- IR 05000413/1982010 + (18:56:09, 26 May 2025)
- IR 05000400/1982005 + (18:56:43, 26 May 2025)
- ML20062J255 + (18:57:20, 26 May 2025)
- ML20062J190 + (18:57:43, 26 May 2025)
- ML20062J178 + (18:57:50, 26 May 2025)
- 05000280/LER-1982-043-03, /03L-0:on 820713,w/unit at 100% Power,Performance of PT-27 Revealed Ampere Reading for Heat Tracing Panel 10, Circuit 6A Below Acceptance Criteria.Caused by Defective Heat Tracing Due to Excessive Heat.Heat Tracing Replaced + (18:57:54, 26 May 2025)