- 05000267/LER-1980-058-03, /03X-1:on 801009,plant Operated at Power W/ Emergency Feedwater Supply to Loop I Helium Circulator Water Turbine Drives Isolated to Repair Line Leak Downstream of PV-21243-1.Caused by Erosion + (04:04:11, 26 May 2025)
- 05000346/LER-1982-001-01, /01X-2:on 820113,borated Water Storage Tank Temp Higher than Initial Conditions Assumed.Caused by Lack of Administrative Restrictions on Storage Tank Temp.Procedure Mods Initiated & Insulation Added + (04:04:32, 26 May 2025)
- ML20093K731 + (04:05:45, 26 May 2025)
- 05000267/LER-1984-002-01, Final LER 84-002-01:on 840123,one of Three Bearing Water Pressure Differential Switches Found Inoperable.Caused by Dirt & Oil Accumulation on High Alarm Micro Switch.Switch Replaced + (04:06:02, 26 May 2025)
- 05000277/LER-1984-008-01, Revised LER 84-008-01:on 840427,standby Gas Treatment Sys Solenoid Valve SV-00009 Failed to Operate Properly, Preventing Fan a Inlet & Outlet Dampers from Opening.Cause of Solenoid Failure Under Investigation + (04:06:10, 26 May 2025)
- 05000282/LER-1995-012, :on 950915,determined That CW Pump Discharge Check Valves Not Tested Adequately.Caused by Failure to Determine Exact Conditions That Acceptance Criteria Must Be Met.Investigated Alternate Testing Methods + (04:07:42, 26 May 2025)
- 05000368/LER-1981-038-03, 11 & 12,emergency Feedwater Pump 2P7A Tripped on Overspeed.Caused by Oil Leak in Turbine Hydraulic Sys.Oil Leak Repaired & Emergency Feedwater Pump Returned to Svc + (04:07:55, 26 May 2025)
- ML20093H749 + (04:08:25, 26 May 2025)
- DCL-84-247, Public Version of Revised Emergency Plan Implementing Procedures,Including Rev 3 to EP OP-25 Re Tank Rupture,Rev 7 to EP R-6 Re Radiological Fire & Rev 9 to EP M-6 Re Nonradiological Fire.W/Jm Felton 840717 Release Memo + (04:10:12, 26 May 2025)
- ML20093G138 + (04:10:33, 26 May 2025)
- ML20093G130 + (04:10:36, 26 May 2025)
- ML20093F442 + (04:11:40, 26 May 2025)
- TAC:52071 + (04:12:32, 26 May 2025)
- PMNS20200217, Notice of Meeting with Southern Nuclear Operating Company + (04:14:03, 26 May 2025)
- ML20093D006 + (04:16:08, 26 May 2025)
- ML20093C174 + (04:17:28, 26 May 2025)
- ML20093C035 + (04:17:48, 26 May 2025)
- ML20093B900 + (04:18:03, 26 May 2025)
- ML20093B483 + (04:18:22, 26 May 2025)
- ML20093A631 + (04:19:24, 26 May 2025)
- 05000313/LER-1982-028-03, /03X-1:on 840909,diesel Driven Fire Pump P-6B Failed to Start When Using Battery Bank B.Caused by Normal end-of-svc Life.Battery Bank B Replaced on 820911 & Periodic Electrical Test Procedure Revised + (04:20:28, 26 May 2025)
- 05000395/LER-1984-024-01, Revised LER 84-024-01:on 840422 & 29,reactor Tripped Due to Low Main Turbine Shaft Oil Pump Discharge Pressure.Caused by Conservative Switch Settings & Loss of Suction on Motor Suction Pump.Switch Setpoint Will Be Changed + (04:20:36, 26 May 2025)
- 05000482/LER-2020-001, Shutdown Due to Inoperable Containment Purge Isolation Valves + (04:23:06, 26 May 2025)
- TAC:54356 + (04:23:16, 26 May 2025)
- A830021, Semiannual Operating Rept, Radioactive Effluents,Jan-June 1983 + (04:23:28, 26 May 2025)
- 05000302/LER-1984-001-01, Updated LER 84-001-01:on 840113,end Cap on Reactor Bldg Side of Spare Penetration 3531 Mistakenly Cut Off.Caused by Personnel Failure to Follow Applicable Engineering Procedures.Personnel Retrained + (04:24:13, 26 May 2025)
- PMNS20200229, Periodic Advanced Reactor Stakeholder Meeting + (04:24:37, 26 May 2025)
- L-95-047, Technical Evaluation Rept for Arkansas Nuclear One,Units 1 & 2 Plants Odcm,Rev 2 + (04:24:55, 26 May 2025)
- 05000324/LER-1980-060-03, During Reactor Startup, Control Rod 38-27 Could Not Be Withdrawn Beyond Position 46. Caused by Control Rod Becoming Uncoupled from CRD Due to Dirty Filter.Crd Rebuilt & Filter Replaced + (04:25:52, 26 May 2025)
- 05000293/LER-1980-091-03, During Routine Surveillance Testing for Drywell to Torus Vacuum Breaker Operability,Air Operated Valve 5045K Did Not Operate.Hinge Pin Freed & Piston Lubricated + (04:26:03, 26 May 2025)
- 05000293/LER-1980-044-03, RCIC Inboard Isolation Valve Activated & Breaker Tripped.Caused by Valve Electrically Backseating.Valve Motor Burned Out & Contactor Seized.Valve & Operator Replaced + (04:26:32, 26 May 2025)
- 05000336/LER-1982-009-01, Review of ECCS Subsystem Revealed Mode Changes Occurred Operating Under Action Statement.Caused by Misinterpretation Between Tech Spec Sections.Tech Spec Changed to Reduce Confusion + (04:26:39, 26 May 2025)
- 05000293/LER-1979-008-03, HPCI Turbine Tripped. Caused by Ruptured Lower Head Gasket on Gland Seal Condenser.Repairs Completed & Surveillance Test Successfully Performed + (04:27:40, 26 May 2025)
- ML20092L044 + (04:29:01, 26 May 2025)
- ML20092K603 + (04:29:58, 26 May 2025)
- ML20092K337 + (04:30:37, 26 May 2025)
- ML20092J304 + (04:32:24, 26 May 2025)
- ML20092G782 + (04:35:24, 26 May 2025)
- ML20092G744 + (04:35:33, 26 May 2025)
- TAC:M69731 + (04:36:49, 26 May 2025)
- ML20092F969 + (04:37:18, 26 May 2025)
- ML20092F759 + (04:38:05, 26 May 2025)
- ML20092F752 + (04:38:07, 26 May 2025)
- ML20092F665 + (04:38:16, 26 May 2025)
- 3F0584-01, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-09.Corrective Actions:Instrument Calibr Program Restructured to Establish Single Point of Accountability within Maint Dept + (04:39:05, 26 May 2025)
- TAC:55525 + (04:39:19, 26 May 2025)
- TAC:M77725 + (04:39:27, 26 May 2025)
- TXX-9201, Submits Final Response to NRC Bulletin 88-008 Re Thermal Stresses in Piping Connected to RCS & Requests That Requirement to Record Data Be Suspended.Summary of Analysis Performed by Westinghouse on Subj Encl + (04:39:32, 26 May 2025)
- ML20092E558 + (04:40:17, 26 May 2025)
- PMNS20200295, Public Meeting Notice + (04:41:09, 26 May 2025)
- 05000282/LER-1995-011, :on 950809,deficiencies in Inservice Surveillance of Cooling Water Sys.Caused by Inadequate Review of ISI Interval That Ended 931216.Performed Hydrostatic Testing of CR Chiller Cooling Water Strainers + (04:41:56, 26 May 2025)