Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20115A865 + (23:00:25, 25 May 2025)
- ML20115A844 + (23:00:30, 25 May 2025)
- ML20115A773 + (23:00:44, 25 May 2025)
- ML20115A770 + (23:00:49, 25 May 2025)
- ML20115A769 + (23:00:50, 25 May 2025)
- ML20115A766 + (23:00:51, 25 May 2025)
- ML20115A763 + (23:00:54, 25 May 2025)
- ML20115A762 + (23:00:56, 25 May 2025)
- 05000454/LER-1995-005-01, :on 951010,identified Fire Protection Discrepancies.Caused by Inadequate Evaluations During Preparation of Original Analysis.Continued Hourly Fire Watches & Installed Darmatt KM 1 Fire Barrier + (23:00:59, 25 May 2025)
- ML20115A756 + (23:01:01, 25 May 2025)
- ML20115A754 + (23:01:02, 25 May 2025)
- ML20115A749 + (23:01:04, 25 May 2025)
- ML20115A747 + (23:01:06, 25 May 2025)
- ML20115A746 + (23:01:07, 25 May 2025)
- ML20115A744 + (23:01:08, 25 May 2025)
- 05000456/LER-1995-013, :on 960604,determined Fire Protection Discrepancies.Caused by Inadequate Evaluations.Continued Hourly Fire Watches & Initiated Plant Modifications + (23:01:10, 25 May 2025)
- ML20115A739 + (23:01:12, 25 May 2025)
- 05000482/LER-1996-006, :on 960606,reactor Trip Occurred.Caused by Inadequate Design Mod Procedures.Installed Correct Pins in Three of Four Main Feedwater Regulating Valves,Placed Holds on Stored Equipment & Revised Procedures + (23:01:13, 25 May 2025)
- ML20115A735 + (23:01:14, 25 May 2025)
- 05000327/LER-1995-010, :on 950717,turbine & Reactor Trips Occurred. Caused by Bellows Being Deformed When Sudden Pressure Relay Is Isolated & Heated.New Qualitrol Relays Installed & Placed in Service + (23:01:19, 25 May 2025)
- ML20115A731 + (23:01:20, 25 May 2025)
- 05000413/LER-1996-005-01, :on 960613,automatic Reactor Trip Occurred. Caused by Failed Capacitor.Replaced & Tested Failed Capacitor + (23:01:22, 25 May 2025)
- ML20115A726 + (23:01:23, 25 May 2025)
- ML20115A725 + (23:01:25, 25 May 2025)
- ML20115A723 + (23:01:27, 25 May 2025)
- 05000461/LER-1996-007, :on 960529,discovered Inoperable Leak Detection Instruments.Caused by Personnel Error.Personnel Briefed Re Event & Labelled Both Reactor Water Cleanup Sys HX Rooms Ceiling Plugs + (23:01:28, 25 May 2025)
- ML20115A720 + (23:01:30, 25 May 2025)
- ML20115A714 + (23:01:31, 25 May 2025)
- ML20115A711 + (23:01:33, 25 May 2025)
- ML20115A706 + (23:01:34, 25 May 2025)
- ML20115A662 + (23:01:40, 25 May 2025)
- 05000456/LER-1996-006-05, :on 960603,failed to Maintain TS Requirement of 0.25 H2O Differential Pressure Between Auxiliary Bldg & Atmosphere Due to Inadequate Controls Process.Throttled Auxiliary to Turbine Bldg Fire Door + (23:01:42, 25 May 2025)
- ML20115A660 + (23:01:43, 25 May 2025)
- B830422, Forwards Updated Const Status Rept as of 830331.Rept Reflects Const Progress of 62%.All Indicate Commercial Operation Date of 860501 + (23:01:45, 25 May 2025)
- ML20115A654 + (23:01:47, 25 May 2025)
- ML20115A648 + (23:01:50, 25 May 2025)
- ML20115A607 + (23:01:57, 25 May 2025)
- ML20115A595 + (23:01:59, 25 May 2025)
- ML20115A592 + (23:02:00, 25 May 2025)
- L-83-279, Forwards Updated Const Status Rept as of 830331 for Inclusion in NUREG-0030 + (23:02:02, 25 May 2025)
- ML20115A589 + (23:02:04, 25 May 2025)
- PLA-1636, Forwards Updated Const Status Rept as of 830331 for Inclusion in NUREG-0030 + (23:02:06, 25 May 2025)
- ML20115A584 + (23:02:08, 25 May 2025)
- ML20115A582 + (23:02:10, 25 May 2025)
- ML20115A577 + (23:02:12, 25 May 2025)
- 05000298/LER-1992-009, :on 920611,noncompliance w/10CFR50 App R, Failure of Post Fire Safe Shutdown Equipment Discovered. Caused by Inadequate Alternate Shutdown (ASD) Design Criteria.Asd Procedures Revised + (23:02:14, 25 May 2025)
- ML20115A517 + (23:02:18, 25 May 2025)
- ML20115A514 + (23:02:19, 25 May 2025)
- ML20115A501 + (23:02:21, 25 May 2025)
- ML20115A496 + (23:02:22, 25 May 2025)
- ML20115A493 + (23:02:24, 25 May 2025)