Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000344/LER-1992-021, :on 920730,discovered That Manual Vent Valves in MSIV Air Supply Lines Not Installed Properly.Caused by Insufficient Info in Design Change Package.Fire Procedures Revised & Engineering Personnel Trained + (19:58:51, 25 May 2025)
- 05000498/LER-1992-009, :on 920801,operator Performing AFW Portion of Solid State Protection Sys Test Misread Procedure & Turned Control Switch On,Causing Pump to Discharge Into SG C.Caused by Personnel Error.Procedure Revised + (19:58:53, 25 May 2025)
- ML20127C449 + (19:59:02, 25 May 2025)
- ML20127C422 + (19:59:11, 25 May 2025)
- ML20127C411 + (19:59:19, 25 May 2025)
- ML20127C365 + (19:59:36, 25 May 2025)
- IR 05000387/1990002 + (20:06:21, 25 May 2025)
- 05000266/LER-1992-010, :on 921208,discovered That Inservice Tests IT-40 & IT-45 Re SI Valves (Quarterly) Could Lead to Isolation of All Available Flow Paths for SI Pumps.Pra Performed.Issue Also Reported Per Part 21 + (20:06:59, 25 May 2025)
- ML20127B977 + (20:07:47, 25 May 2025)
- IR 05000263/1977013 + (20:09:16, 25 May 2025)
- IR 05000263/1972006 + (20:09:22, 25 May 2025)
- IR 05000280/1985002 + (20:10:15, 25 May 2025)
- IR 05000259/1985018 + (20:10:48, 25 May 2025)
- IR 05000259/1985023 + (20:11:18, 25 May 2025)
- ML20127B312 + (20:11:33, 25 May 2025)
- IR 05000259/1985026 + (20:11:36, 25 May 2025)
- 05000443/LER-1992-019, :on 920916,determined That Procedures for Performing Delta T/Tavg Protection Channel Operational Test Inadequate Due to Lack of Complete Technical Review of I&C Procedures.Appropriate Procedures Revised + (20:11:43, 25 May 2025)
- ML20127B196 + (20:12:00, 25 May 2025)
- L-93-001, Advises That Draft Decommissioning Funding Plan in Final Stages of Internal Review & Expected to Be Submitted in Next Few Wks.Licensee Stated That Funding Plan Would Be Submitted by End of 1992 + (20:14:28, 25 May 2025)
- L-93-002, Advises That Draft Decommissioning Funding Plan Presently in Final Stages of Internal Review & Expected to Be Completed within Next Few Wks.Plan Originally Expected to Be Submitted on or Before 921231,per Licensee + (20:14:38, 25 May 2025)
- ML20127A741 + (20:14:45, 25 May 2025)
- IR 05000341/1992018 + (20:15:17, 25 May 2025)
- DD-92-07, Informs That Time within Which Commission May Act to Review Directors Decision DD-92-07 Expired.Commission Declined Review.Decision Became Final Agency Action on 931218.W/ Certificate of Svc.Served on 920104 + (20:15:18, 25 May 2025)
- IR 05000373/1992028 + (20:15:38, 25 May 2025)
- ML20127A464 + (20:16:30, 25 May 2025)
- NUREG-0694, Advises That Augmented Natural Circulation Training Should Be Performed.Descriptions of Natural Circulation Tests Should Be Included in Fsar.Detailed Test Procedures Must Be Submitted 60 Days Prior to Scheduled Test Performance + (20:21:51, 25 May 2025)
- IR 05000546/1979008 + (20:31:12, 25 May 2025)
- IR 05000293/1992027 + (20:34:03, 25 May 2025)
- 05000301/LER-1981-002, Forwards Results of Metallographic Insp & Exam of Steam Generator Tube R15C73,as Committed to in LER 81-002/01T-01. Also Forwards Addl Rept on Evaluation of Apr 1981 Eddy Current Insp Results & Eddy Current Insp Maps + (20:36:23, 25 May 2025)
- IR 05000424/1992030 + (20:37:30, 25 May 2025)
- IR 05000277/1991099 + (20:37:54, 25 May 2025)
- 05000321/LER-1981-038-03, /03L-0:on 810424,local Leak Rate Test Coordinator Reviewed 810423 Test Results & Determined That Valve G11-F019 Was Leaking Excessively.Cause Unknown.Valve Will Be Repaired & Retested.Investigation Underway + (20:40:43, 25 May 2025)
- 05000321/LER-1981-038, Forwards LER 81-038/03L-0 + (20:40:49, 25 May 2025)
- TAC:42126 + (20:41:23, 25 May 2025)
- ML20126K668 + (20:42:05, 25 May 2025)
- IR 05000313/1980020 + (20:44:01, 25 May 2025)
- NUREG-0785, Forwards Draft NUREG-0785, Safety Concerns Associated W/Pipe Breaks in BWR Scram Sys. Requests Rept Re Applicability to Facility & Determination of Remedial Measures + (20:44:33, 25 May 2025)
- A800058, Forwards Endorsement 41 to Maelu Policy MF-70 & Endorsement 51 to Nelia Policy NF-200 + (20:45:41, 25 May 2025)
- 05000295/LER-1981-002-03, MSIV 1B Failed to Close During Closure Time Testing While in Hot Shutdown Mode. Caused by Failure of Two Dc Solenoid Valves to Actuate.Both Valves Replaced + (20:45:51, 25 May 2025)
- IR 05000397/1985007 + (20:46:00, 25 May 2025)
- 05000295/LER-1981-002, Forwards Updated LER 81-002/03X-1 + (20:46:01, 25 May 2025)
- A810017, Forwards Response to NRC 810306 Request for Addl Info Re Adequacy of Station Electric Distribution Sys Voltages + (20:46:24, 25 May 2025)
- IR 05000313/1981002 + (20:47:59, 25 May 2025)
- 05000245/LER-1981-003-01, /01P-0:on 810419,two Containment Instrument Isolation Valves Found in Closed Position.Isolation Valve to Pressure Instrumentation Which Bypasses Reactor Protection Sys Scrams Also Closed.Corrective Action in Followup Rept + (20:48:22, 25 May 2025)
- 05000336/LER-1990-015, :on 900919,unit Experienced Inadvertent Isolation of Containment Purge Valves.On 900920,unit Experienced Actuation of SI Actuation Sys.Caused by Operator Error.Technician Counseled + (20:49:36, 25 May 2025)
- 05000336/LER-1991-010, :on 911018,reanalysis of Main Steam Line Break Confirmed That Main Steam Line Break Exceeded Containment Design Limits.Caused by Incorrect Assumption in FSAR Analysis.Jco Developed & Mods Installed + (20:49:43, 25 May 2025)
- IR 05000272/1985008 + (20:50:41, 25 May 2025)
- IR 05000267/1981001 + (20:50:54, 25 May 2025)
- IR 05000445/1992051 + (20:51:37, 25 May 2025)
- TAC:55647 + (20:51:38, 25 May 2025)
- IR 05000445/1992047 + (20:51:57, 25 May 2025)