Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:56946 + (15:23:56, 25 May 2025)
- DD-96-19, Informs That Time Provided by NRC Regulation within Which Commission May Act to Review Directors Decision DD-96-19 Expired.Decision Became Final Agency Action on 961213. W/Certificate of Svc.Served on 961218 + (15:24:12, 25 May 2025)
- TAC:M84788 + (15:24:28, 25 May 2025)
- ML20132F648 + (15:24:51, 25 May 2025)
- ML20132F592 + (15:25:09, 25 May 2025)
- ML20132F580 + (15:25:16, 25 May 2025)
- 05000334/LER-1996-004, :on 961126,determined Incorrect Testing of safety-related Logic Circuits.Caused by Relays Not Being Considered Part of Instrument Channel.Will Revise Maint & Operations Procedures to Include Relay Testing + (15:25:24, 25 May 2025)
- ML20132F439 + (15:26:05, 25 May 2025)
- ML20132F381 + (15:26:24, 25 May 2025)
- IR 05000219/2003001 + (15:26:43, 25 May 2025)
- ML20132F314 + (15:26:46, 25 May 2025)
- IR 05000250/1985017 + (15:30:33, 25 May 2025)
- ML20132E306 + (15:32:10, 25 May 2025)
- IR 05000259/1984040 + (15:36:43, 25 May 2025)
- IR 05000250/1985020 + (15:36:55, 25 May 2025)
- IR 05000232/2027001 + (15:37:05, 25 May 2025)
- ML20132D524 + (15:38:43, 25 May 2025)
- IR 05000233/1978001 + (15:39:08, 25 May 2025)
- NUREG/CR-4077, Recommends Board & Industry Notification of Westinghouse Owners Group Ack of Possible Failure of Secondary O-ring Seal Matl Used in Reactor Coolant Pump Seal Assemblies. NUREG/CR-4077 Re Aecl Seal Test Program Encl + (15:40:57, 25 May 2025)
- TAC:13278 + (15:41:08, 25 May 2025)
- 05000245/LER-1996-020-01, :on 960322,CST Unusable Vol Not Accounted for in Plant Procedures.Caused by Personnel Error.Design Calculations Will Be Revised to Correctly Identify Usable Vol of Csr + (15:41:38, 25 May 2025)
- TAC:55581 + (15:42:30, 25 May 2025)
- ML20132C797 + (15:42:32, 25 May 2025)
- 05000245/LER-1996-051, :on 960913,seismic Qualification Deficiencies Found in SR Piping.Caused by Original Plant Design Deficiency.Reviewed All SR Piping Sys to Identify Addl Design Deficiencies + (15:42:52, 25 May 2025)
- IR 05000225/2003005 + (15:43:25, 25 May 2025)
- 05000245/LER-1996-031, :on 960425,incorrect Fuses Caused Automatic Depressurization Sys to Be Inoperable.Cause Has Not Been Determined.All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating + (15:43:31, 25 May 2025)
- 05000245/LER-1996-059, :on 961115,reactor Pressure Vessel High Level Trip Sys Single Failure Vulnerability Identified.Caused by Failure to Identify & Properly Evaluate All Single Failure & Separation Issues.Rfp Will Be Reevaluated + (15:43:41, 25 May 2025)
- TAC:55236 + (15:45:43, 25 May 2025)
- ML20132C237 + (15:47:38, 25 May 2025)
- ML20132C168 + (15:48:11, 25 May 2025)
- ML20132C157 + (15:48:15, 25 May 2025)
- ML20132C099 + (15:48:34, 25 May 2025)
- 05000245/LER-1996-057, :on 961113,temporary Equipment Configuration Jeopardized Operability of 4 Kv Sys.Caused by Lack of Recognition of Interaction Potential of Breakers During Postulated Earthquake.Secured Breaker in Cubicle W/Hardware + (15:48:56, 25 May 2025)
- 05000255/LER-1984-023, :on 841109,determined That Reactor Protection Low Flow Trip for Four Primary Coolant Pumps Operation Set Incorrectly.Caused by Nonperformance of Calibr Procedure. Calibr Procedure Performed + (15:49:46, 25 May 2025)
- TAC:M96277 + (15:54:52, 25 May 2025)
- ML20132B043 + (15:57:23, 25 May 2025)
- TAC:8116 + (15:58:19, 25 May 2025)
- 05000366/LER-1979-078-03, /03L-1 on 790622:hydrogen Gas Concentration Downstream of Recombiners Exceeded Tech Specs.Caused by Improper Operation of Preheater Which Resulted in Insufficient Gas & Droplet Temp.Investigation Underway + (15:59:03, 25 May 2025)
- TAC:10386 + (15:59:08, 25 May 2025)
- 05000366/LER-1979-078, Forwards LER 79-078/03L-1 + (15:59:11, 25 May 2025)
- NUREG-0531, Forwards NUREG-0531, Investigation & Evaluation of Stress Corrosion Cracking in Piping of LWR Plants & Notice of Issuance.W/O Rept.Fr Notice Encl + (15:59:57, 25 May 2025)
- EPID:L-2017-PMP-0007 + (16:01:00, 25 May 2025)
- IR 05000458/2019003 + (16:01:24, 25 May 2025)
- ML20129K204 + (16:04:14, 25 May 2025)
- IR 05000429/2005002 + (16:08:40, 25 May 2025)
- ML20129J050 + (16:09:33, 25 May 2025)
- ML20129J036 + (16:09:38, 25 May 2025)
- ML20129H995 + (16:09:51, 25 May 2025)
- ML20129H985 + (16:09:58, 25 May 2025)
- ML20129H945 + (16:10:10, 25 May 2025)
- ML20129H914 + (16:10:19, 25 May 2025)