Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1996-023, :on 960425,discrepancies Found in Various TS Required Valve Lineups.Caused by Failure to Incorporate TS SRs Into Plant Surveillance Procedures.Isolation Valves Had Been Inspected & Verified to Be in Closed Position + (13:42:25, 25 May 2025)
- ML20133K899 + (13:53:14, 25 May 2025)
- ML20133K595 + (13:57:41, 25 May 2025)
- STC-20-041, Proposed Rule for Emergency Preparedness for Small Modular Reactors and Other New Technologies (Federal Register Notice) (85 Fr 28436) + (14:04:32, 25 May 2025)
- EPID:L-2019-LLA-0116 + (14:04:48, 25 May 2025)
- ML20133J811 + (14:05:04, 25 May 2025)
- ML20133J577 + (14:06:33, 25 May 2025)
- 05000369/LER-1985-021, :on 850605,personnel Overexposure Occurred. Calculations Indicate Dose of 10.6 Rems to Skin & 0.03 Rem to Whole Body.Control & Disposal of Protective Clothing Revised to Prevent Recurrence of Incident + (14:10:23, 25 May 2025)
- 05000325/LER-1985-026, :on 850718,92 Indications within Heat Affected Zones & Pinhole Leaks of Welds Revealed During Refuel/Maint Outage.Caused by IGSCC of Class 1,Type 304 Piping Matl. Weld Overlays Acceptable + (14:10:45, 25 May 2025)
- ML20133H434 + (14:15:03, 25 May 2025)
- IR 05000237/1992001 + (14:19:26, 25 May 2025)
- ML20133G627 + (14:21:49, 25 May 2025)
- 05000245/LER-1996-049, :on 960524,EDG & Gas Turbine Generator Has Potential to Malfunction During Seismic Event.Caused by Original Design Deficiency.Relay Replacements Being Identified + (14:22:49, 25 May 2025)
- TAC:55627 + (14:24:11, 25 May 2025)
- ML20133G088 + (14:25:29, 25 May 2025)
- 05000346/LER-1985-008, :on 850420,computer Heat Balance Calculation Inaccuracy Noted & Inoperable Channel Not Placed in Tripped Condition.Caused by Failure of Feedwater Flow Transmitter. Transmitter Will Be Repaired + (14:26:41, 25 May 2025)
- ML20133F636 + (14:30:00, 25 May 2025)
- DD-85-12, Informs That Time for Commission to Act to Review Directors Decision DD-85-12 Expired.Commission Declined Review. Decision Became Final Agency Action on 851003.Served on 851007 + (14:37:01, 25 May 2025)
- ML20133F213 + (14:37:27, 25 May 2025)
- 05000341/LER-1996-022, :on 961207,TS 3.3.7.5 Required Plant SD Occurred Due to Lack of Control Room Indication for Safety Relief Valve.Pressure Switch Sensing Tap for SRV a Relocated + (14:42:05, 25 May 2025)
- TAC:45817 + (14:44:04, 25 May 2025)
- NUREG-0565, Forwards Topical Rept Evaluation of BAW-10092P,Rev 3 & BAW-10154 B&W Owners Group Small Break LOCA Evaluation model,CRAFT2 (Rev 3).Two Confirmatory Issues Identified. Response Requested within 45 Days of Ltr Receipt + (14:44:07, 25 May 2025)
- TAC:08350 + (14:45:34, 25 May 2025)
- IR 05000416/2006011 + (14:52:48, 25 May 2025)
- IR 05000430/2005001 + (14:55:10, 25 May 2025)
- 05000315/LER-1982-003, Corrected LER 82-003/04T-1:on 820115,unplanned Gas Release Detected by Elevated Vent Stack Monitor Reading.Exact Cause Undetermined.Helium Leak Testing of Waste Gas Sys Probable Cause.Test Procedure Changed + (14:55:41, 25 May 2025)
- 05000336/LER-1996-037, :on 961202,inadequate Surveillance Procedure for Verifying Average Water Temp at Unit 2 Intake Structure Discovered.Caused by Misinterpretation of TS Requirements.Ts Rev Initiated + (14:57:09, 25 May 2025)
- ML20133C430 + (14:59:05, 25 May 2025)
- IR 05000400/1984048 + (14:59:25, 25 May 2025)
- TAC:59064 + (15:01:55, 25 May 2025)
- 05000245/LER-1996-062, :on 961203,failure Vulnerability of SBGTS Was Identified.Performed Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident Coincident W/Venting of Primary Containment + (15:02:43, 25 May 2025)
- IR 05000501/2006015 + (15:03:15, 25 May 2025)
- ML20133B804 + (15:03:50, 25 May 2025)
- ML20133B744 + (15:04:13, 25 May 2025)
- TAC:43516 + (15:04:17, 25 May 2025)
- ML20133B666 + (15:04:53, 25 May 2025)
- 05000245/LER-1996-046-02, Forwards LER 96-046-02.Util Commits to Modify Procedure for Performing Local Leak Rate Test on Vacuum Breaker to Include Testing of Shaft Packing & Stuffing Box + (15:05:20, 25 May 2025)
- ML20133B443 + (15:06:12, 25 May 2025)
- 05000245/LER-1996-060, :on 960408,EDG Air Start Check Valve Internals Were Removed W/O Proper Documentation.Caused by Failure to Document Design Mod.Internals Have Been Reinstalled in Check Valves & Sys Has Been Restored to Original Configuration + (15:08:32, 25 May 2025)
- IR 05000250/1985021 + (15:09:17, 25 May 2025)
- 05000245/LER-1996-061, :on 961121,containment Isolation Function in Design Basis Accident Concurrent W/Loss of One Train of Dc Sys Failed.Caused by Inappropriate Exclusion in Past of Operation Conditions.Requirements Documented + (15:09:26, 25 May 2025)
- 05000354/LER-1995-033-14, Forwards LER 95-033-14.Design Change Package Will Be Completed Which Will Revise RBM Bypass Setpoint Calculation + (15:10:56, 25 May 2025)
- IR 05000272/1996014 + (15:12:20, 25 May 2025)
- ML20133A252 + (15:13:19, 25 May 2025)
- ML20132H066 + (15:16:17, 25 May 2025)
- ML20132G965 + (15:16:54, 25 May 2025)
- ML20132G888 + (15:17:24, 25 May 2025)
- ML20132G865 + (15:17:37, 25 May 2025)
- 05000483/LER-1985-025-01, Forwards LER 85-025-01 Re Intermediate Range High Flux Reactor Trip Caused by Blown Fuse in ex-core Neutron Monitoring Channel.Expected Submission Date of Supplemental Rept Amended Due to Continuing Investigation + (15:17:39, 25 May 2025)
- IR 05000237/1996201 + (15:17:55, 25 May 2025)
- 05000245/LER-1995-008, :on 950411,potential Inoperability Was Determined Re Feedwater Coolant Injection Sys Upon Failure of S2 DC Power.Caused by Error That Occurred During Original Plant Design.Physical Plant Mods Have Been Completed + (15:19:12, 25 May 2025)