Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19338E481 + (19:19:53, 25 December 2024)
- ML19338E479 + (19:19:56, 25 December 2024)
- ML19338E478 + (19:19:58, 25 December 2024)
- ML19338E477 + (19:20:04, 25 December 2024)
- ML19338E474 + (19:20:06, 25 December 2024)
- IR 05000245/1980006 + (19:20:11, 25 December 2024)
- ML19338E472 + (19:20:16, 25 December 2024)
- ML19338E471 + (19:20:21, 25 December 2024)
- ML19338E470 + (19:20:24, 25 December 2024)
- ML19338E468 + (19:20:25, 25 December 2024)
- ML19338E467 + (19:20:29, 25 December 2024)
- ML19338E466 + (19:20:31, 25 December 2024)
- ML19338E465 + (19:20:33, 25 December 2024)
- ML19338E464 + (19:20:34, 25 December 2024)
- ML19338E463 + (19:20:37, 25 December 2024)
- ML19338E462 + (19:20:38, 25 December 2024)
- 05000295/LER-1980-039, Forwards LER 80-039/03L-0 + (19:20:47, 25 December 2024)
- ML19338E453 + (19:20:50, 25 December 2024)
- ML19338E451 + (19:20:53, 25 December 2024)
- ML19338E450 + (19:20:55, 25 December 2024)
- 05000295/LER-1980-040-03, /03L-0:on 800619,during Normal Operation,Loop D Overpower/Overtemp Delta T Channel 1T-431 Found Erratic, Initiating Alarms & Bistable Trips.Caused by Noisy Output from Low Level Amplifier 1TM431B (Hagan Model 18) + (19:20:59, 25 December 2024)
- 05000266/LER-1980-010-03, /03L-0:on 800827,during Normal Operation,After Redundant Containment Spray Pump Recirculation Phase Suction Valve Maint,Operability Test Was Not Performed.Caused by Personnel Failure to Fully Comprehend Maint Procedures + (19:21:27, 25 December 2024)
- 05000295/LER-1980-040, Forwards LER 80-040/03L-0 + (19:21:31, 25 December 2024)
- 05000266/LER-1980-010, Forwards LER 80-010/03L-0 + (19:21:53, 25 December 2024)
- 05000334/LER-1980-061-03, /03L-0:on 800829,manual Suction Valve from Boric Acid Tank a Left Shut,Rendering Flow Path Inoperable.Caused by Operator Error Due to Procedural Deficiency.Operating Order Implemented to Correct Procedure Error + (19:22:39, 25 December 2024)
- 05000334/LER-1980-061, Forwards LER 80-061/03L-0 + (19:22:44, 25 December 2024)
- 05000293/LER-1980-063-03, /03L-0:on 800828,reactor Coolant Leak Detection Air Sampling Sys (C-19) Declared Inoperable.Caused by Excessive Moisture in Sample Lines.Valve Packing Leak Will Be Overhauled During Refueling Outage + (19:22:49, 25 December 2024)
- 05000265/LER-1980-019-03, /03L-0:on 800829,recirculation Pump Motor Generator a Field Breaker Opened.Caused by Failure of Control Power Transformer for Recirculation Motor Generator A.Transformer Replaced + (19:22:53, 25 December 2024)
- 05000265/LER-1980-019, Forwards LER 80-019/03L-0 + (19:22:56, 25 December 2024)
- ML19338E433 + (19:23:01, 25 December 2024)
- ML19338E431 + (19:23:02, 25 December 2024)
- ML19338E430 + (19:23:05, 25 December 2024)
- ML19338E429 + (19:23:07, 25 December 2024)
- ML19338E428 + (19:23:08, 25 December 2024)
- ML19338E427 + (19:23:17, 25 December 2024)
- ML19338E426 + (19:23:19, 25 December 2024)
- ML19338E425 + (19:23:24, 25 December 2024)
- ML19338E424 + (19:23:28, 25 December 2024)
- ML19338E422 + (19:23:30, 25 December 2024)
- ML19338E421 + (19:23:33, 25 December 2024)
- ML19338E420 + (19:23:34, 25 December 2024)
- ML19338E419 + (19:23:35, 25 December 2024)
- ML19338E418 + (19:23:37, 25 December 2024)
- ML19338E417 + (19:23:38, 25 December 2024)
- ML19338E416 + (19:23:42, 25 December 2024)
- ML19338E415 + (19:23:47, 25 December 2024)
- ML19338E414 + (19:23:52, 25 December 2024)
- 05000010/LER-1977-042-03, /03L-0:on 771031,scram Discharge Level Switch LS 264 Failed to Operate on Intial Quarterly Surveillance Dis 300-1 Test,But Did Operate on Subsequent Tests.Cause Not Determined.Safety Sys a Tripped & LS 264 Retested + (19:23:58, 25 December 2024)
- 05000010/LER-1977-042, Forwards LER 77-042/03L-0 + (19:24:02, 25 December 2024)
- 05000010/LER-1977-040-03, /03L-0:on 771017,Channel 1 (RIC-281) Found to Trip at 132%.Caused by Instrument Drift.Trip Setpoint Readjusted to 115%.High Neutron Flux Monitor Testing Will Continue Monthly Per Dis 700-4,verifying Operability + (19:24:05, 25 December 2024)
- 05000010/LER-1977-040, Forwards LER 77-040/03L-0 + (19:24:08, 25 December 2024)