Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20196L057 + (11:33:30, 24 May 2025)
- ML20196L055 + (11:33:31, 24 May 2025)
- ML20196L046 + (11:33:34, 24 May 2025)
- ML20196L041 + (11:33:36, 24 May 2025)
- ML20196K794 + (11:34:42, 24 May 2025)
- ML20196K715 + (11:35:02, 24 May 2025)
- ML20196K685 + (11:35:12, 24 May 2025)
- ML20196K583 + (11:35:41, 24 May 2025)
- 05000336/LER-1999-005, :on 990223,insufficient Verification of TS Surveillance 4.8.2.3.2,re 125 Volt Class 1E Battery Bank Load Test Was Noted.Caused by Inadequate Control Over Addition of New Battery Loads.Implemented Design Controls + (11:35:46, 24 May 2025)
- IR 05000275/1999301 + (11:36:13, 24 May 2025)
- NUREG-0561, Advises That Effective 990930,NMSS Expects Route Approval Applicants to Conduct Route Coordination with States & Local Law Enforcement Agencies.Content Guide for Use in Preparing Sf Plan Applications & Sample Route Plan Encl + (11:36:39, 24 May 2025)
- ML20196K457 + (11:36:41, 24 May 2025)
- ML20196K394 + (11:37:03, 24 May 2025)
- ML20196K222 + (11:37:42, 24 May 2025)
- IR 05000528/1999012 + (11:38:33, 24 May 2025)
- ML20196J863 + (11:39:23, 24 May 2025)
- ML20196J783 + (11:39:41, 24 May 2025)
- ML20196J743 + (11:39:51, 24 May 2025)
- ML20196J723 + (11:39:56, 24 May 2025)
- ML20196J682 + (11:40:15, 24 May 2025)
- ML20196J669 + (11:40:18, 24 May 2025)
- ML20196J637 + (11:40:27, 24 May 2025)
- TAC:M93467 + (11:40:51, 24 May 2025)
- TAC:MA0578 + (11:40:53, 24 May 2025)
- TAC:62259 + (11:41:04, 24 May 2025)
- 05000423/LER-1997-037, :on 970516,discovered That RHR Sys Testing During Transition to Mode 4 Incorrectly Used RHR One Hour out-of-service Allowance.Caused by Improper Interpretation Contained in Ts.Submitted TS Change Request + (11:42:15, 24 May 2025)
- ML20196J190 + (11:42:38, 24 May 2025)
- ML20196J163 + (11:42:46, 24 May 2025)
- ML20196J145 + (11:43:57, 24 May 2025)
- ML20196J120 + (11:44:02, 24 May 2025)
- 05000382/LER-1998-019, :on 980920,failure of Containment Isolation Valves to Close During Testing Was Noted.Caused by Solenoid Failures.Solenoids Were Replaced & Valves Were Retested Successfully + (11:44:09, 24 May 2025)
- ML20196J067 + (11:44:19, 24 May 2025)
- TAC:MA4004 + (11:44:26, 24 May 2025)
- 05000254/LER-1998-025, :on 981102,HPCIS Pci Check Valve Failed.Caused by Corrosion in Valve Body.Revised Check Valve Insp Procedures to Add Corrosion Repair Criteria + (11:44:45, 24 May 2025)
- 05000289/LER-1997-007, :on 970621,generator Output Breaker Failed Resulting in Loss of Offsite Power & Rt.Caused by Failure of Generator Breaker GB-102.Both Failed Breakers Were Replaced + (11:46:03, 24 May 2025)
- TAC:62801 + (11:47:25, 24 May 2025)
- ML20196H588 + (11:47:30, 24 May 2025)
- ML20196H517 + (11:47:51, 24 May 2025)
- ML20196H501 + (11:47:54, 24 May 2025)
- TAC:M99019 + (11:48:11, 24 May 2025)
- ML20196H413 + (11:48:15, 24 May 2025)
- TAC:10754 + (11:48:19, 24 May 2025)
- 05000333/LER-1999-003-01, Forwards LER 99-003-01 Re SRV Setpoint Drift.Revised Rept Is Being Submitted to Change Commitment Due Date Made in Original LER + (11:48:26, 24 May 2025)
- ML20196H295 + (11:48:49, 24 May 2025)
- 05000245/LER-1997-013, :on 970217,discovered That Weight of Lower Mast Sections of Refueling Platform Fuel Grapple Were Not Added to Fuel Assembly Weight.Caused by Failure to Maintain Design Basis.Performed New Impact Load Analysis.With + (11:49:08, 24 May 2025)
- TAC:66970 + (11:49:31, 24 May 2025)
- ML20196H117 + (11:49:38, 24 May 2025)
- ML20196G924 + (11:50:29, 24 May 2025)
- ML20196G912 + (11:50:35, 24 May 2025)
- TAC:M94651 + (11:50:36, 24 May 2025)
- TAC:53693 + (11:50:39, 24 May 2025)