Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19340B626 + (23:41:04, 24 December 2024)
- ML19340B622 + (23:41:05, 24 December 2024)
- ML19340B623 + (23:41:05, 24 December 2024)
- ML19340B620 + (23:41:06, 24 December 2024)
- ML19340B617 + (23:41:08, 24 December 2024)
- ML19340B616 + (23:41:09, 24 December 2024)
- B10118, Application to Amend License DPR-61,changing Tech Specs Re Monthly Manual Tests of ECCS Components.Class III Fee Encl + (23:41:10, 24 December 2024)
- ML19340B608 + (23:41:12, 24 December 2024)
- ML19340B605 + (23:41:13, 24 December 2024)
- ML19340B596 + (23:41:15, 24 December 2024)
- ML19340B594 + (23:41:16, 24 December 2024)
- PNO-I-80-159, on 801031,during Full Power Operation,Target Rock Relief Valve Opened & Failed to Reseat.Manual Scram Was Initiated & Reactor Is Being Cooled Down Via Main Condenser. Valve Reclosed at 340 Psi W/Reactor Stable.Cause Unknown + (23:41:18, 24 December 2024)
- ML19340B592 + (23:41:19, 24 December 2024)
- ML19340B591 + (23:41:19, 24 December 2024)
- 05000306/LER-1980-030-03, /03L-0:on 801008,diesel Generator D2 Tripped on High Crankcase Pressure When Eductor Hose Failed.Caused by Burst Eductor Hose.Hose Replaced on Both Diesel Engines + (23:41:21, 24 December 2024)
- ML19340B587 + (23:41:22, 24 December 2024)
- 05000306/LER-1980-030, Forwards LER 80-030/03L-0 + (23:41:23, 24 December 2024)
- 05000302/LER-1980-042-03, /03L-0:on 801008,dose Equivalent I-131 Exceeded 1.0 Uci/G Creating Event Contrary to Tech Spec 3.4.8.Caused by Leaking Fuel Pins & Anticipated Iodine Transient Following RCS Transient.Purification Flow Increased + (23:41:25, 24 December 2024)
- 05000346/LER-1980-073-03, /03L-0:on 801008,inner Door of Containment Personnel Lock Could Not Be Latched.Caused by Two Broken Camrol Cam Follower Bearings in Door Operating Mechanism Control Linkage.Broken Bearings Replaced + (23:41:27, 24 December 2024)
- 05000302/LER-1980-042, Forwards LER 80-042/03L-0 + (23:41:28, 24 December 2024)
- 05000346/LER-1980-066-03, /03L-1:between 800829 & 0921,doors to Spent Fuel Pool Area Blocked Open on Nine Occasions.Caused by Personnel Error on Part of Const Workers.Two Memos Issued to Reinforce Special Order 88-1 Previously Issued + (23:41:30, 24 December 2024)
- 05000346/LER-1980-073, Forwards LER 80-073/03L-0 + (23:41:33, 24 December 2024)
- 05000271/LER-1980-035-03, /03L-0:on 801007,main Steam Relief Valves Had as-found Setpoint of 1,093 Psig,Exceeding Max Setpoint. Deviation Caused by Setpoint Drift.Valve Disassembled & Rebuilt & Setpoint Readjusted + (23:41:34, 24 December 2024)
- ML19340B574 + (23:41:35, 24 December 2024)
- 05000346/LER-1980-066, Forwards LER 80-066/03L-1 + (23:41:37, 24 December 2024)
- 05000271/LER-1980-035, Forwards LER 80-035/03L-0 + (23:41:39, 24 December 2024)
- 05000346/LER-1980-074-03, /03L-0:on 801008,test Frequency for Containment Air Lock Test Exceeded.Caused by Procedural Deficiency.Mods to Plant Procedures Made to Provide Assurance of Completing Required Testing + (23:41:41, 24 December 2024)
- 05000368/LER-1980-071-03, /03L-0:on 801006,wind Speed Indicator (WDR-9300) Was Found to Be Inoperable Per Tech Spec 3.3.3.4.Caused by Faulty Amplifier on Recorder.Amplifier Replaced & WDR-9300 Recalibr + (23:41:42, 24 December 2024)
- ML19340B567 + (23:41:43, 24 December 2024)
- 05000368/LER-1980-071, Forwards LER 80-071/03L-0 + (23:41:45, 24 December 2024)
- 05000346/LER-1980-074, Forwards LER 80-074/03L-0 + (23:41:46, 24 December 2024)
- ML19340B561 + (23:41:48, 24 December 2024)
- 05000368/LER-1980-070-03, /03L-0:on 801005,control Room Emergency Chiller, 2VE-1B,was Found to Be Inoperable.Caused by Improper Pressure Switch Setting (80 Psig Rather than 150 Psig). Pressure Switch Calibr + (23:41:49, 24 December 2024)
- 05000368/LER-1980-070, Forwards LER 80-070/03L-0 + (23:41:52, 24 December 2024)
- 05000368/LER-1980-005, Forwards Revised LER 80-005/03X-1 + (23:41:54, 24 December 2024)
- ML19340B550 + (23:41:55, 24 December 2024)
- 05000346/LER-1980-076-03, /03L-0:on 801008,gross Back Leakage Observed Through Core Flood Valve 30.Caused by Disengagement of Disc Unit from Body Block.New Bolt Plates & Locking Plate Properly Installed + (23:41:58, 24 December 2024)
- ML19340B546 + (23:41:59, 24 December 2024)
- 05000346/LER-1980-076, Forwards LER 80-076/03L-0 + (23:42:00, 24 December 2024)
- 05000346/LER-1980-075-03, /03L-0:on 801008,steam Generator Level Instrument to Steam & Feedwater Rupture Control Sys Cabinet Channel 3 Maintained 15-inch Error Over Entire Scale.Caused by Zero Shift in Transmitter.Transmitter Being Monitored + (23:42:07, 24 December 2024)
- ML19340B538 + (23:42:08, 24 December 2024)
- A800438, Forwards Rept of Change to Physical Security Plan,Revision 9.Plan Withheld (Ref 10CFR2.790) + (23:42:09, 24 December 2024)
- 05000346/LER-1980-075, Forwards LER 80-075/03L-0 + (23:42:11, 24 December 2024)
- TAC:42062 + (23:42:12, 24 December 2024)
- ML19340B534 + (23:42:13, 24 December 2024)
- ML19340B531 + (23:42:14, 24 December 2024)
- ML19340B533 + (23:42:14, 24 December 2024)
- ML19340B530 + (23:42:15, 24 December 2024)
- ML19340B529 + (23:42:16, 24 December 2024)
- ML19340B527 + (23:42:17, 24 December 2024)
- ML19340B524 + (23:42:19, 24 December 2024)