Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20005A114 + (15:14:59, 23 December 2024)
- ML20005A112 + (15:15:00, 23 December 2024)
- ML20005A111 + (15:15:01, 23 December 2024)
- ML20005A110 + (15:15:05, 23 December 2024)
- ML20005A109 + (15:15:06, 23 December 2024)
- 05000369/LER-1981-034-01, /01T-0:on 810409,personnel in Technical Support Ctr Noticed That Diesel Generator Exhaust Entered Via Ventilation Intake Duct.Caused by Generator Exhaust Being Located Too Close to Technical Support Ctr Intake Duct + (15:15:08, 23 December 2024)
- 05000369/LER-1981-034, Forwards LER 81-034/01T-0 + (15:15:10, 23 December 2024)
- ML20005A105 + (15:15:12, 23 December 2024)
- GO2-81-138, Interim Deficiency Rept,Originally Reported on 810209,re Ultimate Heat Sink Spray Pond Leakage.Caused Possibly by Wall Leakage.Water Levels Lowered by Pumping to 1/2 & 1/3 Full + (15:15:13, 23 December 2024)
- 05000321/LER-1981-047-03, /03L-0:on 810604,reactor Core Isolation Cooling Turbine Bearing Oil Low Pressure Annunciator Alarmed Due to Low Oil Level.Caused by Small Oil Leaks from Connection on Sight Glass & Governor Hearing Fitting + (15:15:16, 23 December 2024)
- ML20005A102 + (15:15:17, 23 December 2024)
- 05000321/LER-1981-047, Forwards LER 81-047/03L-0 + (15:15:20, 23 December 2024)
- 05000369/LER-1981-038-03, /03L-0:on 810402,chemical Vol Control Sys Pump 1A Declared Inoperable Following Appropriate Periodic Test During Initial Fuel Load.Caused by High Differential Pressure Across Pump Due to Impeller Replacement + (15:15:23, 23 December 2024)
- 05000339/LER-1981-046-03, /03L-0:on 810607,individual Rod Position Indication for Rod KO2 in Control Bank a Deviated from Group Demand Position.Caused by Instrument Drift.Indicator Channel Recalibr + (15:15:25, 23 December 2024)
- 05000369/LER-1981-038, Forwards LER 81-038/03L-0.Detailed Event Analysis Encl + (15:15:28, 23 December 2024)
- 05000369/LER-1981-035-03, /03L-0:on 810329,noble Gas Activity Monitor EMF-33 for Condenser Evacuation Sys Discovered Not Functioning. Caused by Excessive Moisture in Sample Lines.Grab Samples Being Taken & Mod to Equipment in Progress + (15:15:34, 23 December 2024)
- 05000339/LER-1981-046, Forwards LER 81-046/03L-0 + (15:15:36, 23 December 2024)
- ML20005A092 + (15:15:38, 23 December 2024)
- 05000369/LER-1981-035, Forwards LER 81-035/03L-0 + (15:15:40, 23 December 2024)
- 05000369/LER-1981-065-03, /03L-0:on 810422,while in Mode 3 Initial Fuel Loading,Containment Floor & Equipment Sump Level Indicators in Control Room Failed to Zero Scale Position & Ac Power Supply Was Lost.Caused by Disconnected Wires + (15:15:42, 23 December 2024)
- ML20005A088 + (15:15:43, 23 December 2024)
- ML20005A087 + (15:15:44, 23 December 2024)
- 05000369/LER-1981-065, Forwards LER 81-065/03L-0 + (15:15:45, 23 December 2024)
- TXX-3349, Interim Deficiency Rept Re heating/ventilation/air- Conditioning Cooling Sys,Initially Reported on 810330.Cause Attributed to Design Evolution.Corrective Actions to Be Completed as Described in 810424 Interim Rept + (15:15:48, 23 December 2024)
- 05000369/LER-1981-039-03, /03L-0:on 810403,pressure Operated Relief Valve Found Lifting While in Automatic W/Associated Block Valve Closed.Caused by Low RCS Pressure Setpoint.Pressure Reduced & Valve Returned to Svc + (15:15:51, 23 December 2024)
- 05000369/LER-1981-039, Forwards LER 81-039/03L-0.Detailed Event Analysis Encl + (15:15:56, 23 December 2024)
- ML20005A080 + (15:15:58, 23 December 2024)
- ML20005A078 + (15:15:59, 23 December 2024)
- 05000369/LER-1981-037-03, /03L-0:on 810330,inadvertent Safety Injection Initiated During Initial Fuel Load Maint on Solid State Protection Sys Cabinets.Caused by Input Error Inhibit & Mode Selector Switches Left in on Position + (15:16:01, 23 December 2024)
- ML20005A075 + (15:16:03, 23 December 2024)
- ML20005A072 + (15:16:04, 23 December 2024)
- ML20005A073 + (15:16:04, 23 December 2024)
- ML20005A071 + (15:16:05, 23 December 2024)
- ML20005A070 + (15:16:06, 23 December 2024)
- 05000369/LER-1981-058-03, /03L-0:on 810418,while in Mode 3,lower Containment High Temp Alarm Was Received in Control Room Indicating That Units C & D Feeder Breakers Tripped.Caused by Incorrectly Adjusted Unit D Magnetic Overload Switch.Breaker Repla + (15:16:08, 23 December 2024)
- ML20005A068 + (15:16:10, 23 December 2024)
- 05000369/LER-1981-058, Forwards LER 81-058/03L-0 + (15:16:12, 23 December 2024)
- PNO-II-81-043, on 810616,plant Tripped Due to Offsite Power Loss.Caused by Lightning Strike on 230kv Feeder Line Supplying Startup Transformer.Testing Verified That No Damage Occurred.Transformer re-energized & Sys Restored + (15:16:14, 23 December 2024)
- ML20005A062 + (15:16:18, 23 December 2024)
- ML20005A063 + (15:16:18, 23 December 2024)
- ML20005A061 + (15:16:20, 23 December 2024)
- ML20005A060 + (15:16:21, 23 December 2024)
- 0CAN068108, Responds to Generic Ltr 81-07 Re NUREG-0612, Control of Heavy Loads.... Work on Interim Actions Completed.Extension of Select Response Dates Requested.Addl Info on Crane Design Compliance for Overhead Load Handling Sys Encl + (15:16:24, 23 December 2024)
- ML20005A056 + (15:16:24, 23 December 2024)
- ML20005A054 + (15:16:29, 23 December 2024)
- 05000321/LER-1981-051-03, /03L-0:810607,turbine Failed to Trip at Less than or Equal to 5,000 Rpm During Testing.Caused by Broken Turbine Trip Ball,Scored Trip Piston & Out of Calibr Diaphragm Oil Control Valve.Ball Replaced & Valve Cleaned + (15:16:31, 23 December 2024)
- ML20005A051 + (15:16:33, 23 December 2024)
- 05000369/LER-1981-064-03, /03L-0:on 810421,during Mode 3 Initial Fuel Loading,Wrong semi-daily Surveillance Item Checklists Run on Two Successive Shifts.Caused by Use of Wrong Procedures. Correct Checklist Completed & Personnel Cautioned + (15:16:34, 23 December 2024)
- 05000369/LER-1981-064, Forwards LER 81-064/03L-0 + (15:16:36, 23 December 2024)
- 05000369/LER-1981-063-03, /03L-0:on 810422,outer Door of Lower Personnel Air Lock Closed,But Locking Pins Stuck & Seals Failed to Inflate.Caused by Missing Shear Pin on Limit Switch Actuating Shaft.Pin Replaced & Door Declared Operable + (15:16:38, 23 December 2024)
- 05000321/LER-1981-051, Forwards LER 81-051/03L-0 + (15:16:40, 23 December 2024)