- 05000368/LER-1981-005-03, /03L-0:on 810204,core Operating Limit Supervisory Sys Rendered Inoperable.Caused by Computer Failure.Software Reloaded & Computer Restarted.Backup Computer Will Be Installed + (07:34:57, 23 December 2024)
- 05000368/LER-1981-005, Forwards LER 81-005/03L-0 + (07:34:59, 23 December 2024)
- 05000336/LER-1981-008-01, /01T-0:on 810213,determined Spring Can Type Hanger Installed Improperly,Resulting in Overstressed Socket Welded Joint.Caused by Incorrect Design.Hanger Removed & Pipe Isolated & Depressurized.Design to Be Corrected + (07:35:02, 23 December 2024)
- 05000296/LER-1981-010, Forwards LER 81-010/03L-0 + (07:35:04, 23 December 2024)
- 05000368/LER-1981-006, Forwards LER 81-006/03L-0 + (07:35:06, 23 December 2024)
- 05000254/LER-1981-005-01, /01T-0:on 810220,during Testing,Three of Four Condenser Low Vacuum Scram Switches Found Outside Setting Per Tech Spec 3.1-3.Caused by Instrument Setpoint Drift.All Switches Recalibr + (07:35:08, 23 December 2024)
- 05000336/LER-1981-008, Forwards LER 81-008/01T-0 + (07:35:10, 23 December 2024)
- 05000327/LER-1981-016-03, /03L-0:on 810206,diesel Generator 2B-B Breaker Tripped Twice While Attempting to Synchronize W/Tva Power Grid for Surveillance Test SI-7.Caused by Overcurrent During Paralleling Operation.Target Reset & Parallel Repeated + (07:35:12, 23 December 2024)
- 05000409/LER-1981-003-03, /03L-0:on 810202,gross Alpha Activity of Primary Coolant Sample Exceeded Tech Spec.Caused by Degraded Fuel Cladding During Previous Fuel Cycles.Primary Purification Sys Operation Reduced Concentration to Allowable Level + (07:35:15, 23 December 2024)
- 05000327/LER-1981-016, Forwards LER 81-016/03L-0 + (07:35:17, 23 December 2024)
- 05000254/LER-1981-005, Forwards LER 81-005/01T-0 + (07:35:19, 23 December 2024)
- 05000327/LER-1981-013-03, /03L-0:on 810203,liquid Radwaste Monitor, 0-RE-90-122,declared Inoperable.Caused by High Background Count Reading Due to Leak in Brooks Rotameter.Rotameter Seals Replaced,Sample Chamber Cleaned & Monitor Flushed Out + (07:35:20, 23 December 2024)
- 05000409/LER-1981-003, Forwards LER 81-003/03L-0.Detailed Event Analysis Encl + (07:35:24, 23 December 2024)
- 05000369/LER-1981-005-03, /03L-0:on 810202,power Supply to Both Excore Range Monitors Was Interrupted.Caused by Maint Personnel Cutting Off Power to Investigate Steam Generator Status Lights & lo-lo Level Alarms.Personnel Instructed + (07:35:26, 23 December 2024)
- 05000327/LER-1981-013, Forwards LER 81-013/03L-0 + (07:35:28, 23 December 2024)
- 05000369/LER-1981-006-03, /03L-0:on 810202,leaking Seal Discovered on RHR Pump.Caused by Improperly Loaded Spring Which Holds Seal Faces Together.Seal Replaced + (07:35:32, 23 December 2024)
- ML20008E898 + (07:35:36, 23 December 2024)
- 05000369/LER-1981-006, Forwards LER 81-006/03L-0 + (07:35:44, 23 December 2024)
- 05000369/LER-1981-005, Forwards LER 81-005/03L-0 + (07:35:47, 23 December 2024)
- 05000219/LER-1981-007-03, /03L-0:on 810202,water-tight Door to Containment Spray Sys I Compartment Not Closed & Verification of Closed Door Not Performed.Caused by Personnel Error & Lack of Controls to Ensure Doors Are Closed After Passage + (07:35:51, 23 December 2024)
- 05000369/LER-1981-010-03, /03L-0:on 810207,total RHR Flow Exceeded Tech Specs.Caused by Air Line Supplying Actuator on RHR Valve Breaking,Allowing Valve to Fail Open.Rhr Flow Reset.Rigid Air Supply Lines to Be Replaced W/Flexible Lines + (07:35:53, 23 December 2024)
- 05000219/LER-1981-007, Forwards LER 81-007/03L-0 + (07:35:54, 23 December 2024)
- 05000369/LER-1981-010, Forwards LER 81-010/03L-0 + (07:35:56, 23 December 2024)
- 05000369/LER-1981-012-03, /03T-0:on 801211,isolation Valve NV-250 Found Not Verified Closed Under Administrative Control Per Tech Spec. Caused by Lack of Signoff Step in Daily Surveillance Items. Procedure Change Incorporated + (07:35:58, 23 December 2024)
- 05000369/LER-1981-011-03, /03T-0:on 810210,both Pressure Seals on Inner Door of Lower Personnel Air Lock Failed.Caused by Hole in One Seal & Bubble in Other Seal.Seals Replaced & Returned to Manufacturer + (07:36:00, 23 December 2024)
- 05000369/LER-1981-012, Forwards LER 81-012/03T-0 + (07:36:01, 23 December 2024)
- 05000369/LER-1981-011, Forwards LER 81-011/03T-0 + (07:36:03, 23 December 2024)
- ML20008E874 + (07:36:04, 23 December 2024)
- ML20008E872 + (07:36:05, 23 December 2024)
- ML20008E871 + (07:36:06, 23 December 2024)
- ML20008E870 + (07:36:07, 23 December 2024)
- ML20008E869 + (07:36:07, 23 December 2024)
- ML20008E868 + (07:36:09, 23 December 2024)
- IR 05000327/1980047 + (07:36:11, 23 December 2024)
- ML20008E866 + (07:36:13, 23 December 2024)
- ML20008E864 + (07:36:14, 23 December 2024)
- ML20008E863 + (07:36:18, 23 December 2024)
- ML20008E861 + (07:36:19, 23 December 2024)
- ML20008E862 + (07:36:19, 23 December 2024)
- ML20008E860 + (07:36:21, 23 December 2024)
- ML20008E859 + (07:36:22, 23 December 2024)
- ML20008E858 + (07:36:22, 23 December 2024)
- ML20008E857 + (07:36:24, 23 December 2024)
- ML20008E856 + (07:36:24, 23 December 2024)
- ML20008E855 + (07:36:25, 23 December 2024)
- ML20008E854 + (07:36:26, 23 December 2024)
- ML20008E851 + (07:36:28, 23 December 2024)
- ML20008E849 + (07:36:29, 23 December 2024)
- ML20008E847 + (07:36:31, 23 December 2024)
- ML20008E846 + (07:36:32, 23 December 2024)
- IR 05000344/1980031 + (07:36:34, 23 December 2024)