Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20264C271 + (09:40:10, 22 May 2025)
- ML20263K581 + (10:37:06, 22 May 2025)
- ML20263K579 + (10:37:12, 22 May 2025)
- ML20263K557 + (10:37:38, 22 May 2025)
- ML20263K554 + (10:37:46, 22 May 2025)
- ML20263C368 + (11:27:12, 22 May 2025)
- ML20263C347 + (11:27:21, 22 May 2025)
- ML20263C297 + (11:27:37, 22 May 2025)
- ML20261C586 + (12:50:02, 22 May 2025)
- ML20260K694 + (13:04:05, 22 May 2025)
- ML20260K689 + (13:04:08, 22 May 2025)
- ML20260K680 + (13:04:11, 22 May 2025)
- ML20260K676 + (13:04:14, 22 May 2025)
- NUREG-1123, Rev. 3 Knowledge and Abilities Catalog for Nuclear Power Plant Operators: Boiling Water Reactors + (13:13:52, 22 May 2025)
- ML20259B958 + (13:33:52, 22 May 2025)
- 05000285/LER-1998-003, Re Individual Leaving High Radiation Area (HRA) Door Unlocked & Uncontrolled While in Hra. LER 98-003-00 Retracted + (13:43:41, 22 May 2025)
- 05000336/LER-1998-012, Forwards LER 98-012-00,re Event Which Occurred at Millstone Unit 2 on 980521.Commitments Made within Ltr,Encl + (13:44:59, 22 May 2025)
- ML20249C311 + (13:45:10, 22 May 2025)
- TAC:M98738 + (13:47:51, 22 May 2025)
- 05000352/LER-1998-008, :on 980429,discovered Pressure Setpoint Drift of Five Main Steam Sys Srvs.Caused by Corrosion Induced Bonding.Replaced Fourteen SRV Pilot Valves W/Calibr Spares During 1R07 & Util Is Evaluating three-stage SRV Design + (13:48:11, 22 May 2025)
- ML20249B458 + (13:48:17, 22 May 2025)
- 05000412/LER-1998-008-01, :on 980515,discovered Inadequacies in GL 96-01 Specification Instrumentation Surveillance.Caused by Inadequate Application of Ts.Revised Procedures to Address Identified Concerns & Will Perform Testing + (13:51:15, 22 May 2025)
- NUREG-0782, Summary of 980318 Meeting W/Portland General Electric Re Util Plans for Disposal of Trojan Reactor Vessel.List of Attendees & Copy of Util Matls,Encl + (13:51:33, 22 May 2025)
- ML20249A601 + (13:52:27, 22 May 2025)
- ML20249A523 + (13:52:44, 22 May 2025)
- 05000364/LER-1998-001-01, :on 980328,manual Reactor Trip Was Noted.Caused by Dropped Control Rod K-2 & F-10.Affected Cable & Connectors Were Replaced During Unit 2 Twelfth Refueling Outage & Tested During Startup + (13:52:46, 22 May 2025)
- ML20249A446 + (13:52:58, 22 May 2025)
- ML20249A435 + (13:53:00, 22 May 2025)
- 05000461/LER-1998-016, :on 870630,failure to Test Valves 1SX013D/E/F IAW IST Program Was Noted.Caused by Personnel Error.Tested Safety Functions of Valves 1SX012D/E/F & Added Valves to IST + (13:53:04, 22 May 2025)
- ML20249A406 + (13:53:06, 22 May 2025)
- ML20249A404 + (13:53:07, 22 May 2025)
- 05000413/LER-1998-006-01, :on 980514,missed TS Surveillance on Pressurizer Heater EP Supply Testing.Caused by Incompatible W/Sys Design.License Amend Was Submitted to Revise SR 4.4.3.3 + (13:58:26, 22 May 2025)
- 05000413/LER-1998-005, Forwards LER 98-005-00,re Missed TS Surveillance on Abv. Commitments Made within Ltr,Encl + (13:58:46, 22 May 2025)
- 05000213/LER-1998-005, :on 980511,determined That Design Deficiency Was Found in Main Stack Flow Rate Monitor.Caused by 1974 Mod Change on Original Installation.Declared F-1101 Channel Out of Svc & Develop Means of Estimating Flow + (13:58:49, 22 May 2025)
- 05000352/LER-1998-011, :on 970901,1B RHR Pump Was Inoperable Due to Intermittent Min Flow Valve Closures.Caused by Failed Rosemount 510DU Trip Unit.Failed Trip Unit Was Replaced + (13:58:55, 22 May 2025)
- 05000364/LER-1998-005, :on 980516,noted That TS 3.0.4 Had Not Been Met During Mode Change Due to Turbine Driven Auxiliary Feedwater Pump Being Inoperable.Caused by Personnel Error.Opened Isolation Valve to Restore Tdafwp Flow Path to 2C SG + (13:59:00, 22 May 2025)
- ML20249A142 + (13:59:03, 22 May 2025)
- 05000423/LER-1998-029, :on 980514,supplementary Collection & Release Sys Bypass Leakage May Result in Unaccounted CR & TSC Doses,Was Identified.Caused by Inadequate Technical Review.Revised Dose Calculations + (13:59:10, 22 May 2025)
- ML20249A126 + (13:59:12, 22 May 2025)
- RA98-755, Forwards Revised Chapter 4, Criticality Safety, as Addl Info Requested During Telcon W/H Felsher of Nrc.Addl Changes That Were Beyond Licensee Scope of First Submission Will Be Addressed in Future Submittal + (13:59:14, 22 May 2025)
- ML20249A120 + (13:59:40, 22 May 2025)
- ML20249A112 + (13:59:42, 22 May 2025)
- TAC:L32031 + (14:08:04, 22 May 2025)
- 05000395/LER-1989-003, :on 890217,all Three MSIVs Declared Inoperable Due to Electrical Problem Re Grounds on Dc Sys.Caused by Design Deficiency Not Taking Into Account One Remote Electrical Path.Circuit Designs Modified + (14:10:07, 22 May 2025)
- ML20248J026 + (14:14:35, 22 May 2025)
- 05000260/LER-1989-008, :on 890309,ESF Actuation Occurred Due to Electrical Fault on Unit Station Svc Transformer 2B.Caused by Personnel Not Taking Appropriate Actions.Power Supplies Realigned & Isolation & Actuations Reset + (14:14:51, 22 May 2025)
- TAC:40577 + (14:15:33, 22 May 2025)
- 05000344/LER-1989-007, Informs That Rev 1 to LER 89-07 Will Be Submitted by 891013, Due to Forced Outage & Difficulties + (14:17:01, 22 May 2025)
- ML20248H058 + (14:17:11, 22 May 2025)
- 05000336/LER-1989-004, :on 890320,visual Insp of Mechanical Plug Revealed Circumferential Cracking at Top of Plug.Caused by Primary Water Stress Corrosion Cracking.Tube Replugged W/New Mechanical Tube Plug + (14:17:32, 22 May 2025)
- ML20248F044 + (14:31:54, 22 May 2025)