Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G401 + (13:04:35, 21 December 2024)
- 05000324/LER-1981-067-03, /03L-0:on 810714,control Operator Discovered That Drywell Equipment Drain Flow Integrator Was Continually Counting W/No Pumps Running.Caused by Instrument Drift. Integrator Recalibr & Signal Response Checked + (13:04:39, 21 December 2024)
- LD-81-039, Forwards Amend 4 to Fsar,Adding New Large Break LOCA Analysis,Incorporating Extended Fuel Cycle Parameters & Mod of post-LOCA long-term Cooling Section to Discuss Emergency Procedure Guidelines + (13:04:41, 21 December 2024)
- 05000324/LER-1981-067, Forwards LER 81-067/03L-0 + (13:04:44, 21 December 2024)
- TAC:47943 + (13:04:45, 21 December 2024)
- ML20009G393 + (13:04:46, 21 December 2024)
- 05000321/LER-1981-076-03, /03L-0:on 810708,during Testing,Both Dioxide Analyzers Were Found Reading Lower than Actual Concentration of Oxygen.Caused by Failure of Rochester Current Transmitter in Analyzer a & Calibr Drift in Analyzer B + (13:04:47, 21 December 2024)
- IR 05000225/1981002 + (13:04:49, 21 December 2024)
- ML20009G390 + (13:04:54, 21 December 2024)
- ML20009G388 + (13:04:54, 21 December 2024)
- 05000321/LER-1981-076, Forwards LER 81-076/03L-0 + (13:04:56, 21 December 2024)
- ML20009G384 + (13:04:58, 21 December 2024)
- 05000339/LER-1981-053-03, /03L-0:on 810701,one of Two Parallel Steam Supply Valves Failed to Close Completely &,On 810703,other Valve Failed to Completely Close.Caused by Contaminants & Corrosion Products Causing Piston to Stick + (13:05:00, 21 December 2024)
- ML20009G382 + (13:05:01, 21 December 2024)
- 05000339/LER-1981-053, Forwards LER 81-053/03L-0 + (13:05:02, 21 December 2024)
- 05000327/LER-1981-077-03, /03L-0:on 810628,refueling Water Storage Tank Was Found to Have Approx 45,000 Gallons Less than Required 370,000 Gallon Vol.Caused by Valve 1-62-500 Being Left Open from Earlier Boron Concentration Equalization Process + (13:05:04, 21 December 2024)
- ML20009G375 + (13:05:05, 21 December 2024)
- ML20009G374 + (13:05:06, 21 December 2024)
- 05000327/LER-1981-077, Forwards LER 81-077/03L-0 + (13:05:07, 21 December 2024)
- ML20009G369 + (13:05:09, 21 December 2024)
- ML20009G370 + (13:05:09, 21 December 2024)
- ML20009G368 + (13:05:13, 21 December 2024)
- 05000321/LER-1981-064-03, /03L-0:on 810701,HPCI Steam Line Pressure Switches 1E41-N001B & D Actuated at 101 & 106 Psig,Respectively. Caused by Switch Setpoint Drift.Switches Recalibr + (13:05:14, 21 December 2024)
- ML20009G364 + (13:05:16, 21 December 2024)
- ML20009G366 + (13:05:16, 21 December 2024)
- 05000321/LER-1981-064, Forwards LER 81-064/03L-0 + (13:05:17, 21 December 2024)
- ML20009G361 + (13:05:19, 21 December 2024)
- ML20009G360 + (13:05:22, 21 December 2024)
- ML20009G357 + (13:05:23, 21 December 2024)
- ML20009G355 + (13:05:24, 21 December 2024)
- ML20009G354 + (13:05:25, 21 December 2024)
- ML20009G353 + (13:05:26, 21 December 2024)
- 0CAN058107, Responds to NRC Re Violations Noted in IE Insp Repts 50-313/81-06 & 50-368/81-05.Corrective Actions: Personnel Completed Review of Abnormal & Emergency Procedures.Refutes Violations B,C.3 & D + (13:05:29, 21 December 2024)
- PNO-I-81-083, on 810702,licensee Dosimetry Processor Reported Excessive Whole Body Exposure for Second Calendar Quarter of 1981.Investigation Underway to Determine Cause of Exposure + (13:05:37, 21 December 2024)
- ML20009G350 + (13:05:42, 21 December 2024)
- IR 05000483/1981013 + (13:05:46, 21 December 2024)
- ML20009G348 + (13:05:48, 21 December 2024)
- ML20009G344 + (13:05:51, 21 December 2024)
- ML20009G342 + (13:05:55, 21 December 2024)
- ML20009G343 + (13:05:55, 21 December 2024)
- ML20009G340 + (13:06:00, 21 December 2024)
- ML20009G341 + (13:06:00, 21 December 2024)
- 0CAN078112, Advises That Response to Generic Ltr 81-04 Re Station Blackout Events Incorrectly Stated That Unit 1 Was Scheduled for Outage in Sept to Install Dc Powered Emergency Feedwater Train.Outage Scheduled for Jan 1983 + (13:06:01, 21 December 2024)
- ML20009G338 + (13:06:07, 21 December 2024)
- ML20009G337 + (13:06:08, 21 December 2024)
- ML20009G333 + (13:06:08, 21 December 2024)
- ML20009G332 + (13:06:10, 21 December 2024)
- ML20009G329 + (13:06:14, 21 December 2024)
- ML20009G330 + (13:06:14, 21 December 2024)
- ML20009G324 + (13:06:16, 21 December 2024)
- ML20009G325 + (13:06:16, 21 December 2024)