Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20009G878 + (12:53:28, 21 December 2024)
- ML20009G877 + (12:53:29, 21 December 2024)
- ML20009G875 + (12:53:30, 21 December 2024)
- ML20009G874 + (12:53:30, 21 December 2024)
- ML20009G873 + (12:53:31, 21 December 2024)
- ML20009G872 + (12:53:32, 21 December 2024)
- ML20009G871 + (12:53:32, 21 December 2024)
- ML20009G869 + (12:53:33, 21 December 2024)
- ML20009G870 + (12:53:33, 21 December 2024)
- A01842, Forwards SEP Topic Status Summaries for Haddam Neck & Millstone Re Schedule of Integrated Assessment Phase + (12:53:35, 21 December 2024)
- IR 05000483/1981014 + (12:53:38, 21 December 2024)
- ML20009G866 + (12:53:39, 21 December 2024)
- ML20009G865 + (12:53:40, 21 December 2024)
- ML20009G863 + (12:53:41, 21 December 2024)
- ML20009G861 + (12:53:41, 21 December 2024)
- ML20009G860 + (12:53:42, 21 December 2024)
- ML20009G859 + (12:53:43, 21 December 2024)
- 05000295/LER-1981-032-03, /03L-0:on 810629,RCS Charging Pump 1A Balancing Drum Line Was Found Leaking from Circumferential Indication Upstream of Weld Connecting Line to Suction of Pump Casing. Caused by Vibration of Drum Piping.Piping Repaired + (12:53:45, 21 December 2024)
- ML20009G856 + (12:53:46, 21 December 2024)
- 05000295/LER-1981-032, Forwards LER 81-032/03L-0 + (12:53:48, 21 December 2024)
- 05000266/LER-1981-009-01, /01T-0:on 810714,per IE Bulletin 80-11 Analyses, Contractor Reported That Four Control Room & Two Battery Room Walls Did Not Meet Revised Criteria for Seismic Event. Caused by Reanalysis Per Revisions.Supports Installed + (12:53:50, 21 December 2024)
- 05000266/LER-1981-009, Forwards LER 81-009/01T-0 + (12:53:51, 21 December 2024)
- 05000206/LER-1981-013-99, /99X-0:on 810618,power Operated Relief Valve Controller Opened Twice During Normal Pressure Transient Following Reactor Trip.Caused by Setting Time Constant to Off to Satisfy NUREG-0737,Item II.K.3.9 + (12:53:53, 21 December 2024)
- 05000206/LER-1981-014-03, /03L-0:on 810630,erroneous Feedwater Flow Indications Produced Indicated Power Levels Below Actual Levels.Caused by Feedwater Flow Orifice Installed Backwards on One Line & Excessive Vibration on Other + (12:53:55, 21 December 2024)
- PNO-III-81-064, on 810719,while Attempting to Conduct Bldg Leak Rate Test Using Sgts,Extensive Damage Resulted to Roof.Improper Combination of Supply & Exhaust Fans May Have Caused Damage + (12:53:57, 21 December 2024)
- 05000206/LER-1981-013, Forwards LER 81-013/99X-0.Detailed Event Analysis Submitted + (12:53:59, 21 December 2024)
- 05000206/LER-1981-014, Forwards LER 81-014/03L-0.Detailed Event Analysis Submitted + (12:54:01, 21 December 2024)
- ML20009G843 + (12:54:02, 21 December 2024)
- 05000206/LER-1981-016-01, /01T-0:on 810711,immediately Following Unit Shutdown,Both Personnel Airlock Doors Were Simultaneously Open 12 Minutes.Caused by Misaligned Locking Mechanism Due to Damaged Cam Followers.Damaged or Worn Parts Replaced + (12:54:03, 21 December 2024)
- ML20009G841 + (12:54:05, 21 December 2024)
- 05000206/LER-1981-016, Forwards LER 81-016/01T-0.Detailed Event Analysis Submitted + (12:54:06, 21 December 2024)
- ML20009G837 + (12:54:07, 21 December 2024)
- 0CAN078110, Forwards Info Re Util Compliance W/Criteria Given in Reg Guides 1.58 Revision 1 & 1.146,in Response to Generic Ltr 81-01 Concerning Qualification of Insp,Exam & Testing & Audit Personnel + (12:54:08, 21 December 2024)
- ML20009G835 + (12:54:09, 21 December 2024)
- ML20009G834 + (12:54:10, 21 December 2024)
- ML20009G833 + (12:54:11, 21 December 2024)
- ML20009G832 + (12:54:12, 21 December 2024)
- ML20009G831 + (12:54:13, 21 December 2024)
- ML20009G830 + (12:54:13, 21 December 2024)
- AECM-81-255, Responds to 810304 Request for Emergency Procedure 05-5-01-EP-10, Reactivity Control. Procedure Provides Required Operator Action in Event of ATWS & Incorporates BWR Owners Group Recommendations + (12:54:14, 21 December 2024)
- ML20009G829 + (12:54:14, 21 December 2024)
- ML20009G826 + (12:54:16, 21 December 2024)
- ML20009G825 + (12:54:17, 21 December 2024)
- ML20009G824 + (12:54:17, 21 December 2024)
- ML20009G823 + (12:54:18, 21 December 2024)
- ML20009G822 + (12:54:19, 21 December 2024)
- ML20009G820 + (12:54:20, 21 December 2024)
- ML20009G821 + (12:54:20, 21 December 2024)
- ML20009G817 + (12:54:21, 21 December 2024)
- ML20009G818 + (12:54:21, 21 December 2024)
- ML20009G816 + (12:54:22, 21 December 2024)