Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20012E252 + (07:47:10, 21 December 2024)
- ML20012E251 + (07:47:11, 21 December 2024)
- ML20012E248 + (07:47:12, 21 December 2024)
- ML20012E250 + (07:47:12, 21 December 2024)
- IR 05000259/1990004 + (07:47:13, 21 December 2024)
- ML20012E246 + (07:47:15, 21 December 2024)
- ML20012E244 + (07:47:16, 21 December 2024)
- ML20012E240 + (07:47:17, 21 December 2024)
- ML20012E239 + (07:47:18, 21 December 2024)
- ML20012E236 + (07:47:19, 21 December 2024)
- ML20012E235 + (07:47:20, 21 December 2024)
- IR 05000288/1990001 + (07:47:21, 21 December 2024)
- IR 05000243/1990001 + (07:47:22, 21 December 2024)
- IR 05000275/1990007 + (07:47:24, 21 December 2024)
- ML20012E229 + (07:47:31, 21 December 2024)
- ML20012E228 + (07:47:32, 21 December 2024)
- DCL-90-084, Forwards Rev 17 to Physical Security Plan.Plan Withheld (Ref 10CFR73.21) + (07:47:33, 21 December 2024)
- ML20012E225 + (07:47:38, 21 December 2024)
- ML20012E223 + (07:47:39, 21 December 2024)
- IR 05000348/1990011 + (07:47:40, 21 December 2024)
- ML20012E221 + (07:47:41, 21 December 2024)
- ML20012E220 + (07:47:42, 21 December 2024)
- ML20012E219 + (07:47:43, 21 December 2024)
- LIC-90-0267, Forwards Fort Calhoun Station Performance Indicators + (07:47:47, 21 December 2024)
- ML20012E215 + (07:47:49, 21 December 2024)
- LIC-90-0207, Updates 891215 Response to Insp Rept 50-285/89-29. Verification of New Accountability Method Considered to Have Been Addressed by Rev of Accountability Method & Subsequent Training + (07:47:50, 21 December 2024)
- ML20012E213 + (07:47:52, 21 December 2024)
- ML20012E209 + (07:47:54, 21 December 2024)
- ML20012E208 + (07:47:55, 21 December 2024)
- ML20012E206 + (07:47:56, 21 December 2024)
- 3F0390-21, Requests Temporary Waiver of Compliance Granted on Tech Spec 3.9.8.2 Re DHR Power Source Requirements + (07:47:57, 21 December 2024)
- ML20012E205 + (07:47:57, 21 December 2024)
- ML20012E202 + (07:48:00, 21 December 2024)
- ML20012E203 + (07:48:00, 21 December 2024)
- ML20012E201 + (07:48:01, 21 December 2024)
- ML20012E200 + (07:48:02, 21 December 2024)
- ML20012E199 + (07:48:03, 21 December 2024)
- ML20012E198 + (07:48:04, 21 December 2024)
- ML20012E196 + (07:48:05, 21 December 2024)
- ML20012E195 + (07:48:06, 21 December 2024)
- TXX-9008, Cycle 1 Startup Physics Tests Control Rod Worth Predictions Utilizing TU Electric Control Rod Swap Methodology + (07:48:07, 21 December 2024)
- ML20012E191 + (07:48:11, 21 December 2024)
- ML20012E193 + (07:48:11, 21 December 2024)
- ML20012E190 + (07:48:12, 21 December 2024)
- ST-HL-AE-3405, Special Rept:On 891227 & 900116,pressurizer Level Channel L-0466 Read Approx 10% Higher than Three Other Channels. Caused by Failure of Kerotest Valve to Fully Open,Preventing Steam from Entering Ref Leg.Ref Leg Filled + (07:48:16, 21 December 2024)
- TAC:73475 + (07:48:21, 21 December 2024)
- ML20012E172 + (07:48:22, 21 December 2024)
- IR 05000245/1989019 + (07:48:27, 21 December 2024)
- ML20012E169 + (07:48:28, 21 December 2024)
- ML20012E170 + (07:48:28, 21 December 2024)
- ML20012E167 + (07:48:29, 21 December 2024)