Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000387/LER-1982-007, Forwards LER 82-007/01T-1 + (02:56:39, 21 December 2024)
- ML20027B045 + (02:56:40, 21 December 2024)
- ML20027B043 + (02:56:41, 21 December 2024)
- ML20027B044 + (02:56:41, 21 December 2024)
- IR 05000389/1982020 + (02:56:44, 21 December 2024)
- ML20027B041 + (02:56:45, 21 December 2024)
- ML20027B040 + (02:56:46, 21 December 2024)
- ML20027B039 + (02:56:47, 21 December 2024)
- IR 05000280/1982021 + (02:56:48, 21 December 2024)
- ML20027B037 + (02:56:49, 21 December 2024)
- ML20027B035 + (02:56:51, 21 December 2024)
- ML20027B034 + (02:56:52, 21 December 2024)
- ML20027B030 + (02:56:54, 21 December 2024)
- ML20027B027 + (02:57:01, 21 December 2024)
- ML20027B025 + (02:57:02, 21 December 2024)
- ML20027B023 + (02:57:03, 21 December 2024)
- L-82-302, Forwards Response to Violations Noted in IE Insp Rept 50-389/82-20.Corrective Actions:Sockets Reverified on 820518 & 0716,reinsp Program Developed,All Weld Travelers Will Be Recalled & QC Fitup Insp Initiated on Socket Welds + (02:57:04, 21 December 2024)
- IR 05000321/1982020 + (02:57:09, 21 December 2024)
- IR 05000389/1982028 + (02:57:11, 21 December 2024)
- L-82-376, Suppls 820722 Response to Violations Noted in IE Insp Rept 50-389/82-20.Corrective Action:Radiograph Test Program for Socket Joints Instituted.Errors in fit-up of Inspected Joints Will Result in Termination of Fitter + (02:57:12, 21 December 2024)
- ML20027B008 + (02:57:14, 21 December 2024)
- 05000272/LER-1982-061-03, /03L-0:on 820811,svc Water Flow Indication for Containment Fan Coil Unit 13 Erratic.Caused by Silt Plugging High Side Sensing Line of Outlet Flow Transmitter.Sensing Lines Blown Down.Transmitter Returned to Svc + (02:57:16, 21 December 2024)
- ML20027B006 + (02:57:17, 21 December 2024)
- ML20027B005 + (02:57:18, 21 December 2024)
- ML20027B004 + (02:57:20, 21 December 2024)
- 05000272/LER-1982-061, Forwards LER 82-061/03L-0.Detailed Event Analysis Encl + (02:57:21, 21 December 2024)
- ML20027B001 + (02:57:23, 21 December 2024)
- 05000311/LER-1982-076-03, /03L-0:on 820806,operator Received Indication of Containment Gas Monitor Sys,Channel 2R12A,malfunction.Caused by Failure of Test Jack Due to Improper Electrical Connection of Detector & Meter.Test Jack Replaced + (02:57:24, 21 December 2024)
- L-82-371, Responds to NRC Re Violations Noted in IE Insp Rept 50-389/82-28.Corrective Actions:All Unused Weld Matl Property Dispositioned & Minor Change Implemented to SQP-8 to Clarify Specific Requirements for Weld Rod Control + (02:57:25, 21 December 2024)
- ML20027A998 + (02:57:30, 21 December 2024)
- ML20027A997 + (02:57:31, 21 December 2024)
- ML20027A995 + (02:57:32, 21 December 2024)
- 05000311/LER-1982-076, Forwards LER 82-076/03L-0.Detailed Event Analysis Encl + (02:57:33, 21 December 2024)
- ML20027A992 + (02:57:34, 21 December 2024)
- IR 05000348/1982020 + (02:57:38, 21 December 2024)
- ML20027A988 + (02:57:40, 21 December 2024)
- ML20027A986 + (02:57:41, 21 December 2024)
- 05000328/LER-1982-105-03, /03L-0:on 820810,while in Mode 1,one Refueling Water Storage Tank Failed Low & Declared Inoperable.Caused by Faulty Amplifier Card.Transmitter Replaced & Loop Returned to Svc + (02:57:47, 21 December 2024)
- ML20027A978 + (02:57:51, 21 December 2024)
- ML20027A976 + (02:57:53, 21 December 2024)
- 05000366/LER-1982-088, Forwards LER 82-088/03L-0 + (02:57:54, 21 December 2024)
- ML20027A971 + (02:57:59, 21 December 2024)
- 05000311/LER-1982-089, Forwards LER 82-089/01T-0.Detailed Event Analysis Encl + (02:58:00, 21 December 2024)
- IR 05000338/1982027 + (02:58:02, 21 December 2024)
- PLA-1279, Forwards Table Re Preservice Exams to Be Performed Following Initial Criticality.All Exams Expected to Be Completed within 3 Wks of Initial Criticality,W/Exception of Feedwater Exams,Which Require Calibr Std Expected in Late Sept + (02:58:03, 21 December 2024)
- IR 05000424/1982013 + (02:58:08, 21 December 2024)
- FVY-82-102, Provides Addl Info Requested in 820909 Telcon Re Use of Constant Value Gap Conductance Vs Axially Dependent Value in Hot Channel.Study Results Show Critical Power Ratio Difference Less If Axially Varying Gap Conductance Used + (02:58:09, 21 December 2024)
- ML20027A964 + (02:58:09, 21 December 2024)
- ML20027A961 + (02:58:12, 21 December 2024)
- ML20027A959 + (02:58:13, 21 December 2024)
- ML20027A960 + (02:58:13, 21 December 2024)