Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20027D329 + (02:14:42, 21 December 2024)
- ML20027D328 + (02:14:43, 21 December 2024)
- 05000339/LER-1982-056-03, /03L-0:on 820926,breaker for Chemical Addition Tank Train a Discharge Valve MOV-QS-202A Found in Off Position.Caused by Omission of Procedure When Securing Quench Spray Pump 2-QS-P-1A.Breaker Energized + (02:14:44, 21 December 2024)
- 05000328/LER-1982-119-03, /03L-0:on 820927,during Mode 1 Operation & Performance of SI-166-1,containment Isolation Valve 2-FCV-30-17 Failed to Open.Caused by Open Coil in Valve Operator.Coil Replaced.Valve Returned to Svc + (02:14:49, 21 December 2024)
- 05000339/LER-1982-056, Forwards LER 82-056/03L-0 + (02:14:51, 21 December 2024)
- 05000328/LER-1982-119, Forwards LER 82-119/03L-0 + (02:14:52, 21 December 2024)
- 05000416/LER-1982-084-03, /03L-0:on 820929,control Room Indication Lost on Plant Chilled Water Auxiliary Bldg Isolation Valve 1P71F301 During Procedure 06-OP-1P71-Q-0001 Cycling.Caused by out-of- Adjustment Limit Switch.Switch Adjusted + (02:14:54, 21 December 2024)
- ML20027D320 + (02:14:55, 21 December 2024)
- ML20027D319 + (02:14:57, 21 December 2024)
- 05000416/LER-1982-084, Forwards LER 82-084/03L-0 + (02:14:58, 21 December 2024)
- ML20027D316 + (02:15:00, 21 December 2024)
- IR 05000254/1982020 + (02:15:01, 21 December 2024)
- 05000325/LER-1982-102-03, /03L-0:on 821003,source Range Monitor a Rendered Inoperable Due to Broken Detector Cable & Bent Drive Tube. Caused by Drive Control Switch Button Contacts Welded Closed & Moisture Accumulation on Cable Connector + (02:15:02, 21 December 2024)
- PNO-II-82-114, on 821022,unit Achieved Initial Criticality. Actual Parameters Agreed W/Predicted Conditions.Licensee Will Issue News Release + (02:15:05, 21 December 2024)
- ML20027D312 + (02:15:07, 21 December 2024)
- 05000395/LER-1982-008-03, /03L-0:on 820929,svc Water Pond Level Indication Not Verified for Modes 1,2,3 & 4 from 820922-29.Caused by Pond Level Entry Omitted from Operator Logs Due to Personnel Error.Logs Reviewed & Revised + (02:15:08, 21 December 2024)
- ML20027D310 + (02:15:10, 21 December 2024)
- ML20027D308 + (02:15:11, 21 December 2024)
- 05000325/LER-1982-102, Forwards LER 82-102/03L-0 + (02:15:13, 21 December 2024)
- 05000395/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl + (02:15:14, 21 December 2024)
- 05000366/LER-1982-104-03, /03L-0:on 820924,RHR Pump 2D Would Not Start W/Control Switch.Caused by Broken Relay Snap Ring in Pump Breaker.Ring Replaced & Breaker Tested Satisfactorily + (02:15:16, 21 December 2024)
- ML20027D302 + (02:15:18, 21 December 2024)
- 05000366/LER-1982-104, Forwards LER 82-104/03L-0 + (02:15:21, 21 December 2024)
- 05000335/LER-1982-043-03, /03L-0:on 820923,at 100% Power,T Hot Input to Subcooled Margin Monitor Became Erratic,Giving False Indication & Alarms.Cause Undetermined.Malfunction Cleared When Cover of Junction Box Removed + (02:15:22, 21 December 2024)
- 05000259/LER-1982-078, Forwards LER 82-078/01T-0 + (02:15:24, 21 December 2024)
- 05000335/LER-1982-043, Forwards LER 82-043/03L-0 + (02:15:31, 21 December 2024)
- 05000295/LER-1982-031-03, /03L-0:on 820707,power Range Detectors Indicated Low by 46% of Span Nonconservatively,Changing Power Range High Flux Setpoints (25% & 109%).Caused by Miscalibr of Power Detectors.Detectors Readjusted + (02:15:39, 21 December 2024)
- 05000416/LER-1982-078-03, /03L-0:on 821005,battery Surveillance Procedure 06-E1-1111-W-0001 Revealed Voltage on Div 1 Dc Supply to Be 121.7-volts Dc Resulting in Reduction in Electrical Reserves.Caused by Errors in Maint Instruction 07-S-12-45 + (02:15:45, 21 December 2024)
- 05000295/LER-1982-031, Forwards LER 82-031/03L-0 + (02:15:47, 21 December 2024)
- 05000416/LER-1982-078, Forwards LER 82-078/03L-0 + (02:15:49, 21 December 2024)
- ML20027D279 + (02:15:50, 21 December 2024)
- ML20027D277 + (02:15:55, 21 December 2024)
- ML20027D276 + (02:15:56, 21 December 2024)
- BSEP-82-2327, RO 1-82-112:on 821021,continuous Fire Watch Not Maintained as Required by Tech Spec 3.7.7.2.Caused by Misunderstanding on Part of Fire Watch.Fire Watch Established Until Sys Restored to Svc.Event Remains Under Investigation + (02:15:59, 21 December 2024)
- PNO-II-82-115, on 821021 & 22,12 Contractor Employees Were Arrested by Sheriff of Burke County,Ga on Variety of drug-related Charges Involving Marijuana,Cocaine & Valium + (02:15:59, 21 December 2024)
- ML20027D273 + (02:16:02, 21 December 2024)
- ML20027D268 + (02:16:03, 21 December 2024)
- ML20027D267 + (02:16:04, 21 December 2024)
- ML20027D266 + (02:16:05, 21 December 2024)
- ML20027D265 + (02:16:06, 21 December 2024)
- ML20027D264 + (02:16:08, 21 December 2024)
- ML20027D263 + (02:16:16, 21 December 2024)
- ML20027D262 + (02:16:22, 21 December 2024)
- ML20027D260 + (02:16:29, 21 December 2024)
- ML20027D259 + (02:16:30, 21 December 2024)
- ML20027D257 + (02:16:32, 21 December 2024)
- ML20027D254 + (02:16:33, 21 December 2024)
- ML20027D253 + (02:16:34, 21 December 2024)
- ML20027D252 + (02:16:35, 21 December 2024)
- ML20027D248 + (02:16:36, 21 December 2024)
- ML20027D246 + (02:16:37, 21 December 2024)