Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- WM 09-0001, Wolf Creek - Response to NRC Request for Additional Information Regarding Main Steam and Feedwater Isolation System (Msfis) Controls Modification + (10:18:52, 20 September 2018)
- RS-08-161, Braidwood, Units 1 and 2 - Technical Specification Bases + (10:20:10, 20 September 2018)
- TAC:MD4229 + (10:23:23, 20 September 2018)
- IR 05000373/2008007 + (11:01:18, 20 September 2018)
- BVY 08-087, Vermont Yankee Nuclear Power Station, Response to Request for Additional Information on Technical Specifications Proposed Change No. 273, Supplement 6 + (11:04:39, 20 September 2018)
- JAFP-08-0131, James A. FitzPatrick Nuclear Power Plant - Submittal of the Stress Analysis Summary for the N2C-SE Weld Overlay + (11:07:15, 20 September 2018)
- NRC 2008-0085, Point Beach, Units 1 & 2, Transmittal of ARCON96 and Radtrad Cds Supporting Alternative Source Term License Amendment Request 241 + (11:13:25, 20 September 2018)
- TAC:MD6753 + (11:17:00, 20 September 2018)
- NL-08-173, Entergy Nuclear Operations, Inc. - Notification of Unit 1 Transfer of 160 Spent Fuel Assemblies from the Spent Fuel Pool to the Indian Point Independent Spent Fuel Storage Installation + (11:19:48, 20 September 2018)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 58 Through 95 + (11:22:33, 20 September 2018)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment D, Page 21 Through 57 + (11:23:50, 20 September 2018)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Attachment B Through Attachment D, Page 20 + (11:23:53, 20 September 2018)
- CP-200801606, Comanche Peak, Engineering Report, Generic Letter 2004-02 Supplemental Response ER-ESP-001, Revision 1, Introduction Through Attachment a + (11:25:19, 20 September 2018)
- CP-200801606, Comanche Peak - Supplement to Response to NRC Generic Letter (GL) 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, Cover Letter + (11:25:24, 20 September 2018)
- RA-08-191, RA 08-191, Response to D. Lochbaum Regarding Beaver Valley Generic Letter 2008-01 + (11:28:14, 20 September 2018)
- JAFP-08-0128, James A. FitzPatrick, Revised Submittal Date for the Stress Analysis Summary for the N2C-SE Weld Overlay + (11:28:42, 20 September 2018)
- ENS 53596 + (11:30:07, 20 September 2018)
- M081209, SRM-M081209A - Affirmation Session: I. SECY-08-0164 - Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Striking Westcan'S Request for Hearing) (July 31, 2008) + (11:35:31, 20 September 2018)
- M081209, M081209A-Affirmation Session: I. SECY-08-0164 - Entergy Nuclear Operations, Inc. (Indian Point Nuclear Generating Units 2 and 3), Order (Striking Westcan'S Request for Hearing) (July 31, 2008) + (11:36:06, 20 September 2018)
- LR-N08-0224, Hope Creek - License Conditions 2.C.(22)2.c, FOL 2.C.(22)2.f, 2.C.(22)6 and Technical Specification 6.9.1.1 + (12:33:47, 20 September 2018)
- RS-08-132, LaSalle County Station, Units 1 and 2 - Transmittal Letter of Additional Information Regarding Request for License Amendment Regarding Application of Alternative Source Term. Attachments 1 - 5 + (12:37:08, 20 September 2018)
- TAC:MD9946 + (12:44:44, 20 September 2018)
- NRC 2008-0081, Point Beach, Unit 1, Cycle 32 (U1C32) Core Operating Limits Report. + (12:53:36, 20 September 2018)
- NG-08-0713, Duane Arnold Energy Center Application for Renewed Operating License TSCR-109 + (12:57:46, 20 September 2018)
- BVY 08-077, Vermont Yankee, Revised Spent Fuel Management Plan Pursuant to 10CFR50.54(bb) + (13:05:12, 20 September 2018)
- NEI 04-02, NFPA 805 Transition Pilot Plant FAQ 07-0039, Revision 2, Lessons Learned - NEI 04-02 B-2 Table + (14:11:41, 20 September 2018)
- LR-N08-0199, Attachment 4 - C.D.I. Technical Note No. 08-20NP, Rev. 1, Limit Curves with ACM Rev. 4 for 111.5% Power Level Basis at Hope Creek Unit 1. + (14:19:56, 20 September 2018)
- LR-N08-0199, Hope Creek - Response to Request for Information for License Amendment Extended Power Uprate, License Condition 2.C.(22)2.b + (14:19:58, 20 September 2018)
- Breakaway torque + (14:44:41, 20 September 2018)
- Torque + (14:45:38, 20 September 2018)
- L-HU-08-018, Monticello, and Prairie Island Plants - Fitness for Duty Performance Data + (14:51:07, 20 September 2018)
- M080822, M080822 - Affirmation Session: I. SECY-08-0081, SECY-08-0087, Petitions to Intervene Entergy Nuclear Operations, Inc. (Pilgrim Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed July 30, 2007) Ii + (14:58:19, 20 September 2018)
- M080822, SRM-M080822 - I. SECY-08-0081- Entergy Nuclear Operations, Inc. (Pilgrim Nuclear Power Station), Application for Order Approving Indirect Transfer of Control of Licenses (Filed 7/30/08) Ii. SECY-08-0087 - U.S. DOE (HLW) Petitions of the Sta + (14:58:32, 20 September 2018)
- CP-200801015, Technical Specification Bases for Comanche Peak Steam Electric Station Units 1 & 2 + (15:05:25, 20 September 2018)
- NEI 99-04, Oyster Creek - Commitment Change Summary Report - 2007 + (15:08:44, 20 September 2018)
- NL-08-1250, Edwin I. Hatch, Unit 2 - Submittal of Additional Information to Support Proposed Exemption to 10 CFR 50.46 and 10 CFR 50 Appendix K to Allow Ziron Fuel Cladding + (15:18:06, 20 September 2018)
- NRC 2008-0044, Point Beach, Units 1 & 2, License Amendment Request No. 247, Transmittal of Changes to Technical Specifications Spent Fuel Pool Storage Criticality Control + (15:18:50, 20 September 2018)
- NL-08-120, Indian Point, Units 2 and 3, Transmittal of Alert and Notification System Final Design Report + (15:27:22, 20 September 2018)
- NL-08-1092, Edwin I. Hatch, Joseph M. Farley, and Vogtle - Response to Nrc'S Bulletin 2007-01 - Security Officer Attentiveness + (15:30:31, 20 September 2018)
- LR-N08-0149, Salem Generation Station, Unit 1 and 2, Response to Request for Additional Information Request for Changes to Technical Specifications Refueling Operations Decay Time License Amendment Request (LAR) S08-01 + (15:40:46, 20 September 2018)
- M080723, M080723A-Affirmation Session: I. SECY-08-0097 Progress Energy Carolinas Inc. (Shearon Harris Units 2 & 3) Motion by North Carolina Waste Awareness & Reduction Network (Nc Warn) to Immediately Suspend the Hearing Notice & Req for Expedited C + (15:52:33, 20 September 2018)
- BVY 08-041, Vermont Yankee, Registration of Spent Fuel Cask Use + (16:09:35, 20 September 2018)
- RA-08-114, NRC Response to D. Lochbaum Regarding Current Condition of Oyster Creek Drywell and Associated 2.0 Factor of Safety Margin + (16:27:46, 20 September 2018)
- NRC-08-0046, Fermi 2, Submittal of Plant Specific Emergency Core Cooling System (ECCS) Evaluation Model Reanalysis + (16:34:21, 20 September 2018)
- NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 7, Westinghouse Letter, CAW-08-2448, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice + (16:40:34, 20 September 2018)
- NL-08-0869, Vogtle, Units 1 and 2 - Enclosure 4, Westinghouse Letter, CAW-08-2449, Application for Withholding and Affidavit, Proprietary Information Notice, and Copyright Notice + (16:40:40, 20 September 2018)
- WM 08-0003, Wolf Creek Updated Safety Analysis Report (Usar), Revision 21, Chapter 16 + (16:43:37, 20 September 2018)
- WM 08-0003, Wolf Creek Transmittal of Revision 21 to Updated Safety Analysis Report + (16:44:42, 20 September 2018)
- RA-08-114, NRC Response to J. Tauro - Grandmothers, Mothers, and More for Energy Safety (Grammes) Regarding Oyster Creek + (16:58:37, 20 September 2018)
- NL-08-085, Indian Point, Units 2 & 3 - Submittal of Final Report, Siren System Far Field Acoustic Testing + (17:41:17, 20 September 2018)
- LR-N08-0123, Hope Creek - License Conditions 2.C.(21), 2.C.(22)2.g and 2.C.(22)3 + (17:48:34, 20 September 2018)