Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:MB0300 + (05:32:34, 20 March 2020)
- TAC:MC1012 + (05:33:24, 20 March 2020)
- NL-03-2394, Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02 + (05:40:48, 20 March 2020)
- L-03-206, Firstenergy Nuclear Operating Co. - Response to NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System (NMMSS) + (05:43:44, 20 March 2020)
- NOC-AE-03001650, Supplement 1 to Proposed Emergency Change to Technical Specification 3.8.1.1 + (05:44:31, 20 March 2020)
- TAC:MC1082 + (05:50:15, 20 March 2020)
- TAC:MB9148 + (05:51:06, 20 March 2020)
- TAC:MB9017 + (05:51:56, 20 March 2020)
- TAC:MC1603 + (05:53:03, 20 March 2020)
- TAC:MB7695 + (05:53:30, 20 March 2020)
- TAC:ME6538 + (06:00:02, 20 March 2020)
- L-2003-302, November 2003 Monthly Operating Report for Turkey Point Units 3 and 4 + (06:02:10, 20 March 2020)
- ML033530488 + (06:10:06, 20 March 2020)
- TAC:MB9759 + (06:18:58, 20 March 2020)
- TAC:MB6342 + (06:22:01, 20 March 2020)
- TAC:MC1517 + (06:22:31, 20 March 2020)
- L-MT-03-089, Response to NRC Bulletin 2003-04: Rebaselining of Data in the Nuclear Materials Management and Safeguards System + (06:23:10, 20 March 2020)
- TAC:MC1467 + (06:23:28, 20 March 2020)
- NOC-AE-03001647, Proposed Emergency Change to Technical Specification 3.8.1.1 Re Allowed Outage Time for Unit 2 Standby Diesel Generator 22 from 14 Days to 61 Days + (06:33:35, 20 March 2020)
- TAC:MB9241 + (06:35:54, 20 March 2020)
- TAC:MC1255 + (06:42:59, 20 March 2020)
- TAC:MC0833 + (06:47:42, 20 March 2020)
- NLS2003123, November 2003 Monthly Operating Report for Cooper Nuclear Station + (06:59:18, 20 March 2020)
- LR-N03-0471, 180-Day Response to Generic Letter 2003-01, Control Room Habitability + (06:59:58, 20 March 2020)
- TAC:MB0241 + (07:01:43, 20 March 2020)
- L-03-201, November 2003 Monthly Operating Report for Beaver Valley Units 1 and 2 + (07:03:13, 20 March 2020)
- BYRON 2003-0114, Sixty-Day Response to NRC Bulleting 2003-02, Leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity. + (07:08:37, 20 March 2020)
- NOC-AE-03001641, November 2003 Monthly Operating Report for South Texas Project, Units 1 and 2 + (07:08:50, 20 March 2020)
- ML13282A620 + (07:10:43, 20 March 2020)
- TAC:MC1283 + (07:12:50, 20 March 2020)
- ML13281A423 + (07:14:04, 20 March 2020)
- ML13281A421 + (07:14:15, 20 March 2020)
- NRC-03-0090, 180-Day Response to Generic Letter 2003-01, Control Room Habitability. + (07:24:29, 20 March 2020)
- TAC:MC1383 + (07:28:14, 20 March 2020)
- NOC-AE-03001645, Changes to Emergency Plan Procedures + (07:29:26, 20 March 2020)
- ML13268A165 + (07:30:55, 20 March 2020)
- NRC 2003-0116, Generic Letter 2003-01: Control Habitability - Response to Commitments + (07:31:02, 20 March 2020)
- TAC:MB7037 + (07:35:31, 20 March 2020)
- NOC-AE-03001635, Response to Request for Information on NRC Generic Letter 2003-01, Control Room Habitability. + (07:39:12, 20 March 2020)
- TAC:MB6695 + (07:40:12, 20 March 2020)
- NOC-AE-03001639, Withdrawal of Relief Request Related to Security Force Personnel Group Work-Hour Controls During Extended Allowed Outages + (07:43:19, 20 March 2020)
- L-PI-03-101, 60-Day Report Pursuant to NRC Bulletin 2003-02 for 2003, Lower Head Penetration Inspection + (07:43:45, 20 March 2020)
- L-PI-03-114, Response to Generic Letter 2003-01, Control Room Habitabililty. + (07:44:08, 20 March 2020)
- TAC:MB7164 + (07:49:45, 20 March 2020)
- TAC:MB7667 + (07:52:59, 20 March 2020)
- NOC-AE-13003020, Six-Month Status Update of Overall Integrated Plan in Response to Order EA-12-051, Reliable Spent Fuel Pool Instrumentation + (07:54:29, 20 March 2020)
- TAC:MB7432 + (08:02:33, 20 March 2020)
- TAC:MB8755 + (08:06:16, 20 March 2020)
- TAC:MB7376 + (08:09:14, 20 March 2020)
- NOC-AE-03001538, Answer, Response and Request for Clarification in Response to April 29, 2003, Order Regarding Compliance with Revised Decision Basis Threat for Operating Power Reactors + (08:13:35, 20 March 2020)
- L-2003-303, November 2003 Monthly Operating Report for St. Lucie, Units 1 and 2 + (08:16:57, 20 March 2020)