Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20028E115 + (23:34:47, 20 December 2024)
- ML20028E109 + (23:34:51, 20 December 2024)
- ML20028E105 + (23:34:54, 20 December 2024)
- ML20028E106 + (23:34:54, 20 December 2024)
- IR 05000293/1982029 + (23:35:10, 20 December 2024)
- 05000269/LER-1982-020-03, /03L-0:on 821214,both Unit 1 Turbine Driven & 1A Motor Driven Emergency Feedwater Pumps Incapable of Automatic Actuation for 60 S.Caused by Defective Procedures. Personnel Counseled & Procedures Rewritten + (23:35:15, 20 December 2024)
- ML20028E097 + (23:35:16, 20 December 2024)
- ML20028E095 + (23:35:17, 20 December 2024)
- 05000269/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl + (23:35:19, 20 December 2024)
- A02746, Responds to NRC Re Violations Noted in IE Insp Rept 50-423/82-09.Corrective Actions:Nonconformance & Disposition Rept 1510 Issued to Accept as Is Position of Waterstop in Keyway + (23:35:20, 20 December 2024)
- 05000366/LER-1982-131-03, /03L-0:on 821215,after Returning to Full Power, Inoperable Traveling in-core Probe Prevented Updating LPRM Calibr Data for Process Computer.Caused by Failed Electrical Connector.Connector Repaired + (23:35:22, 20 December 2024)
- 05000327/LER-1982-145-03, /03L-0:on 821218,while in Mode 5,latch Mechanisms for Containment Ventilation Isolation Slave Relays Failed to Latch When Relay Energized.Cause Unknown.Equipment Removed & Replaced.Evaluation Continuing + (23:35:24, 20 December 2024)
- IR 05000423/1982009 + (23:35:25, 20 December 2024)
- ML20028E087 + (23:35:26, 20 December 2024)
- 05000321/LER-1982-094-03, /03L-0:on 821214,during Honeywell Temp Controller Calibr Procedure,Core Spray 3A Temp Controller Was Inoperable.Caused by Broken Sensing Bulb.Repairs & Calibr Will Be Completed Prior to Startup + (23:35:28, 20 December 2024)
- 05000327/LER-1982-145, Forwards LER 82-145/03L-0 + (23:35:30, 20 December 2024)
- 05000366/LER-1982-131, Forwards LER 82-131/03L-0 + (23:35:31, 20 December 2024)
- IR 05000410/1982012 + (23:35:33, 20 December 2024)
- 05000395/LER-1982-058-03, /03L-0:on 821214,urgent Failure Alarm Due to Loss of Power Occurred During Restoration of Rod Control Sys Upon Completion of Power Operational Testing.Caused by Oxidation Between Fuse & Fuse Block Mating Surfaces + (23:35:47, 20 December 2024)
- 05000321/LER-1982-094, Forwards LER 82-094/03L-0 + (23:35:48, 20 December 2024)
- 05000395/LER-1982-058, Forwards LER 82-058/03L-0.Detailed Event Analysis Encl + (23:35:55, 20 December 2024)
- ML20028E067 + (23:35:57, 20 December 2024)
- ML20028E068 + (23:35:57, 20 December 2024)
- 05000366/LER-1982-143-03, /03L-0:on 821215,personnel Found Fire Protection Isolation Valves - Position & Lubrication Checks Procedure Performed 2 Days Late.Caused by Personnel Error.Personnel Admonished as to Importance of Surveillance + (23:35:59, 20 December 2024)
- 05000320/LER-1983-001-01, /01P:on 830104,once Through Steam Generator a Pressure Transmitters SP-6A-PT1/2 Were Inoperable,Placing Unit in Action Statements of Tech Specs Limiting Condition for Operation 3.3.3.5 + (23:36:00, 20 December 2024)
- ULNRC-06562, Operating Quality Assurance Manual (Oqam) Interim Revision 34a + (23:36:01, 20 December 2024)
- 05000366/LER-1982-143, Forwards LER 82-143/03L-0 + (23:36:03, 20 December 2024)
- ML20028E060 + (23:36:05, 20 December 2024)
- ML20028E058 + (23:36:05, 20 December 2024)
- ML20028E057 + (23:36:06, 20 December 2024)
- 05000302/LER-1982-075-03, /03L-0:on 821215,during Cold Shutdown,Circuit Breaker on Control Complex Ventilation Radiation Monitor RMA-5 Tripped.Caused by Broken Pump Vane Binding Pump. Pump Replaced + (23:36:08, 20 December 2024)
- 05000320/LER-1983-002-01, /01P:on 830114,once Through Steam Generator B Level Indication Determined Out of Svc,Placing Unit in Action Statement of Tech Spec Limiting Condition for Operation 3.3.3.6 + (23:36:10, 20 December 2024)
- ML20028E053 + (23:36:11, 20 December 2024)
- ML20028E052 + (23:36:12, 20 December 2024)
- TAC:49574 + (23:36:13, 20 December 2024)
- ML20028E051 + (23:36:13, 20 December 2024)
- ML20028E049 + (23:36:14, 20 December 2024)
- ML20028E047 + (23:36:15, 20 December 2024)
- 05000302/LER-1982-075, Forwards LER 82-075/03L-0.Detailed Event Analysis Encl + (23:36:16, 20 December 2024)
- 05000366/LER-1982-144-03, /03L-0:on 821217,calibr of Teledyne-Grotech PRA-103 peak-recording Accelerometers Procedure Discovered Not Performed at Required 18-month Frequency.Caused by Personnel Oversight.Personnel Counseled + (23:36:18, 20 December 2024)
- 05000245/LER-1982-031-03, /03L-0:on 821214,while Performing Main Steam Line High Flow Functional Calibr Test,Pressure Switch 261-21 Tripped at 95.75 Psid,Above Tech Spec.Caused by Setpoint Drift.Pressure Switch Reset + (23:36:20, 20 December 2024)
- 05000339/LER-1982-085, Forwards LER 82-085/03L-0 + (23:36:25, 20 December 2024)
- 05000366/LER-1982-144, Forwards LER 82-144/03L-0 + (23:36:26, 20 December 2024)
- 05000245/LER-1982-031, Forwards LER 82-031/03L-0.Detailed Event Analysis Encl + (23:36:28, 20 December 2024)
- 05000416/LER-1982-161-03, /03L-0:on 821216,doors to Reactor Protection Sys Equipment Rooms Blocked Open to Cool Rooms.Caused by Lack of Cooling in Rooms Due to Chilled Water & Plant Svc Water Sys Being Down.Water Sys Returned to Svc + (23:36:30, 20 December 2024)
- 05000416/LER-1982-168-03, /03L-0:on 821217,fire Rated Door in Upper Cable Room of Control Bldg Blocked Open to Allow Passage of Hose Used for Penetration Sealing.Caused by Planned Maint Activity.Fire Watch Established + (23:36:32, 20 December 2024)
- 05000416/LER-1982-161, Forwards LER 82-161/03L-0 + (23:36:34, 20 December 2024)
- ML20028E026 + (23:36:37, 20 December 2024)
- 05000416/LER-1982-168, Forwards LER 82-168/03L-0 + (23:36:39, 20 December 2024)
- 05000416/LER-1982-167-03, /03L-0:on 821216,fire Rated Door 1A204 Blocked Open for Passage of Hose Used in Local Leak Rate Test.Caused by Planned Testing Activity.Fire Watch Established.Hose Removed on 821217 + (23:36:40, 20 December 2024)
- 05000339/LER-1982-084-03, /03L-0:on 821216,during Full Power,Input from Range Nuclear Instrument N-42 to Comparator Drawer N-50 Was in Defeat.Caused by Failure to Take N-42 Out of Defeat After Deviation Alarm Determination.Operators to Be Reinstructe + (23:36:45, 20 December 2024)