Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031A243 + (19:53:23, 20 December 2024)
- ML20031A241 + (19:53:24, 20 December 2024)
- ML20031A242 + (19:53:24, 20 December 2024)
- ML20031A240 + (19:53:25, 20 December 2024)
- ML20031A239 + (19:53:26, 20 December 2024)
- ML20031A237 + (19:53:27, 20 December 2024)
- ML20031A235 + (19:53:28, 20 December 2024)
- ML20031A236 + (19:53:28, 20 December 2024)
- ML20031A234 + (19:53:32, 20 December 2024)
- ML20031A233 + (19:53:33, 20 December 2024)
- ML20031A230 + (19:53:34, 20 December 2024)
- ML20031A228 + (19:53:35, 20 December 2024)
- ML20031A227 + (19:53:36, 20 December 2024)
- ML20031A226 + (19:53:43, 20 December 2024)
- ML20031A224 + (19:53:44, 20 December 2024)
- ML20031A223 + (19:53:46, 20 December 2024)
- ML20031A220 + (19:53:47, 20 December 2024)
- ML20031A219 + (19:53:49, 20 December 2024)
- ML20031A217 + (19:53:52, 20 December 2024)
- ML20031A216 + (19:53:53, 20 December 2024)
- FVY-81-126, Responds to NRC Re Violations Noted in IE Insp Rept 50-271/81-12.Corrective Actions:Maint Request Generated,Approved & Completed.Personnel Reinstructed + (19:53:54, 20 December 2024)
- ML20031A211 + (19:53:59, 20 December 2024)
- ML20031A207 + (19:54:02, 20 December 2024)
- 05000278/LER-1981-013-01, /01T-0:on 810830,personnel Discovered Water Backed Up Out of Floor Drain Sys Flowing Under Railroad Doors. Caused by Blockage in Drain Sys.Blockage Cleared,Water Pumped Out & Processed Through Radwaste + (19:54:03, 20 December 2024)
- 05000245/LER-1981-022-03, /03L-0:on 810810,MSIV 1-MS-1C Did Not de-energize When Actuated to 10% Closed Position.Caused by Maladjusted Armature on Limit Switch.Armature Readjusted + (19:54:05, 20 December 2024)
- 05000245/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Encl + (19:54:08, 20 December 2024)
- 05000278/LER-1981-013, Forwards LER 81-013/01T-0.Detailed Event Analysis Submitted + (19:54:10, 20 December 2024)
- 05000029/LER-1981-023-03, /03L-0:on 810811,surveillance Requirements Were Not Met for Health Physics Surveillance Schedule.Caused by Failure of Personnel to Insure Time Limit Was Met.Personnel Reminded of Responsibilities + (19:54:12, 20 December 2024)
- 05000245/LER-1981-023-03, /03L-0:on 810810,main Steam Line Hi Radiation Drawer Calibr Test & Main Steam Line Hi Radiation Functional Test Revealed Channel B Tripped Above Tech Spec Limit.Caused by Setpoint Drift.Subchannel Recalibr + (19:54:14, 20 December 2024)
- 05000029/LER-1981-023, Forwards LER 81-023/03L-0 + (19:54:16, 20 December 2024)
- 05000245/LER-1981-023, Forwards LER 81-023/03L-0.Detailed Event Analysis Encl + (19:54:18, 20 December 2024)
- ML20031A194 + (19:54:20, 20 December 2024)
- ML20031A192 + (19:54:21, 20 December 2024)
- ML20031A188 + (19:54:23, 20 December 2024)
- 05000336/LER-1981-028-03, /03L-0:on 810815,ESF Channel a Received Alarms on All Parameters.Caused by Loss of 15-volt Dc Power Supply for Channel A.Power Supply Replaced + (19:54:25, 20 December 2024)
- 05000336/LER-1981-028, Forwards LER 81-028/03L-0 + (19:54:27, 20 December 2024)
- ML20031A184 + (19:54:28, 20 December 2024)
- 05000220/LER-1981-039-03, /03L-0:on 810816,during Surveillance Testing,Msiv 122 Failed to Operate to 7% Closed Position.Caused by Friction in Piston Assembly Which Allowed Timer to Time Out Before Valve Had Stroked Fully.Valve Closed & Retested + (19:54:30, 20 December 2024)
- ML20031A182 + (19:54:32, 20 December 2024)
- 05000220/LER-1981-039, Forwards LER 81-039/03L-0 + (19:54:34, 20 December 2024)
- ML20031A179 + (19:54:35, 20 December 2024)
- 05000029/LER-1981-024-03, /03L-0:on 810813,valve EBF-MOV-557 Failed to Operate Electrically.Caused by Irregularities in Valve Operator Housing Allowing Water in & Forming Rust Which Prevented Proper Torque Switch Operation + (19:54:36, 20 December 2024)
- PNO-I-81-103, on 810910,fire Discovered Inside Containment, Adjacent to Liner.Caused by Fire in Stored Timber & Const Scaffolding.Fire Is Being Investigated by Licensee + (19:54:39, 20 December 2024)
- 05000029/LER-1981-024, Forwards LER 81-024/03L-0 + (19:54:40, 20 December 2024)
- ML20031A174 + (19:54:41, 20 December 2024)
- 05000293/LER-1981-046-03, /03L-0:on 810806,two Automatic Dampers in Control Room High Efficiency Air Filter Sys Found Frozen in Open Position.Probably Caused by Binding of Damper Shaft.Trains Repaired & Surveillance Frequency Increased + (19:54:43, 20 December 2024)
- 05000293/LER-1981-046, Forwards LER 81-046/03L-0 + (19:54:45, 20 December 2024)
- ML20031A170 + (19:54:46, 20 December 2024)
- ML20031A169 + (19:54:47, 20 December 2024)
- 05000320/LER-1981-023-01, RO 81-23/1P:on 810910,during Insp 85-15 Exit Interview, Control Bldg Charcoal Adsorber Filters Discovered to Be Tested Against Wrong Test criteria,95% Instead of 99%. Details Forthcoming + (19:54:49, 20 December 2024)
- ML20031A167 + (19:54:50, 20 December 2024)