Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031H195 + (17:34:21, 20 December 2024)
- ML20031H194 + (17:34:22, 20 December 2024)
- 05000320/LER-1981-025-03, /03L-0:on 810914,during Fire Barrier Penetration Fire Seal Insp,Three Penetrations Found Unsealed.Caused by Inadequate Controls to Ensure Resealing of Penetrations Following Maint or Const + (17:34:24, 20 December 2024)
- ML20031H192 + (17:34:25, 20 December 2024)
- ML20031H191 + (17:34:26, 20 December 2024)
- ML20031H190 + (17:34:27, 20 December 2024)
- 05000312/LER-1981-041, Forwards LER 81-041/03L-0.Detailed Event Analysis Submitted + (17:34:29, 20 December 2024)
- ML20031H187 + (17:34:30, 20 December 2024)
- ML20031H186 + (17:34:31, 20 December 2024)
- ML20031H185 + (17:34:32, 20 December 2024)
- 05000293/LER-1981-055-01, /01T-0:on 810926,Yarway Level Indicators Oscillated.Caused by High Drywell Temp Due to Ineffective Drywell Cooling.Ventilation Sys Currently Being Returned to Original Design + (17:34:33, 20 December 2024)
- ML20031H181 + (17:34:35, 20 December 2024)
- 05000320/LER-1981-025, Forwards LER 81-025/03L-0 + (17:34:37, 20 December 2024)
- 05000344/LER-1981-022-03, /03L-0:on 810917,train a Was Inoperable Due to Suction Path from Control Room Being Isolated by Closed Manual Inlet Damper on Ventilation Sys.Caused by Loose Set Screw Allowing Operator to Be Moved W/O Moving Damper + (17:34:39, 20 December 2024)
- ML20031H177 + (17:34:40, 20 December 2024)
- 05000293/LER-1981-055, Forwards LER 81-055/01T-0 + (17:34:41, 20 December 2024)
- ML20031H173 + (17:34:44, 20 December 2024)
- ML20031H172 + (17:34:46, 20 December 2024)
- 05000272/LER-1981-088-03, /03L-0:on 810918,battery Cable Clamp for Fire Pump 2 Found Cracked & Arcing.Caused by Equipment Failure. Battery Clamp Split & Nipple Vibrated Loose in Casing.Clamp Replaced & Nipple Removed,Reinstalled & Properly Tightened + (17:34:47, 20 December 2024)
- 05000344/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Encl + (17:34:49, 20 December 2024)
- ML20031H166 + (17:34:51, 20 December 2024)
- ML20031H167 + (17:34:51, 20 December 2024)
- ML20031H165 + (17:34:52, 20 December 2024)
- 05000272/LER-1981-088, Forwards LER 81-088/03L-0.Detailed Event Analysis Encl + (17:34:54, 20 December 2024)
- ML20031H162 + (17:34:56, 20 December 2024)
- B10322, Forwards Revisions to Ofc of Nuclear Reactor Regulation Ltr Distribution List + (17:34:57, 20 December 2024)
- ML20031H160 + (17:34:59, 20 December 2024)
- ML20031H158 + (17:35:00, 20 December 2024)
- ML20031H157 + (17:35:01, 20 December 2024)
- ML20031H156 + (17:35:02, 20 December 2024)
- ML20031H155 + (17:35:05, 20 December 2024)
- ML20031H154 + (17:35:06, 20 December 2024)
- ML20031H153 + (17:35:08, 20 December 2024)
- ML20031H152 + (17:35:12, 20 December 2024)
- ML20031H150 + (17:35:13, 20 December 2024)
- ML20031H149 + (17:35:15, 20 December 2024)
- ML20031H148 + (17:35:16, 20 December 2024)
- ML20031H147 + (17:35:17, 20 December 2024)
- ML20031H146 + (17:35:23, 20 December 2024)
- ML20031H145 + (17:35:24, 20 December 2024)
- ML20031H144 + (17:35:25, 20 December 2024)
- ML20031H143 + (17:35:25, 20 December 2024)
- ML20031H142 + (17:35:27, 20 December 2024)
- PNO-V-81-050A, on 811016,during Interview of Util Engineer by NRC Inspectors,W/Intervenor Representative Present, Circumstances of Discovery of Improper Figure Re Equipment Layout in Reactor Bldgs Confirmed.Error Study Continuing + (17:35:29, 20 December 2024)
- ML20031H140 + (17:35:30, 20 December 2024)
- ML20031H137 + (17:35:33, 20 December 2024)
- ML20031H136 + (17:35:33, 20 December 2024)
- ML20031H135 + (17:35:34, 20 December 2024)
- ML20031H134 + (17:35:35, 20 December 2024)
- ML20031H133 + (17:35:36, 20 December 2024)
- ML20031H132 + (17:35:38, 20 December 2024)