Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20032A732 + (17:14:53, 20 December 2024)
- 1CAN108108, Advises That Boron Dilution Events Analyzed in FSAR Do Not Proceed to Criticality.Assumption of Partially Drained RCS Would Not Alter Results.No Tech Spec Change or Procedure Mod Is Required + (17:14:54, 20 December 2024)
- 05000267/LER-1981-054-03, /03L-0:on 810820,emergency Feedwater to Loop 1 Helium Circulator Water Turbine Drive Was Isolated.Caused by Repair Necessary to Stop Leakage Between Seat Ring & Valve Body of Pressure Control Valve.Gasket Resurfaced + (17:14:56, 20 December 2024)
- 05000267/LER-1981-054, Forwards LER 81-054/03L-0.Detailed Event Analysis Encl + (17:14:59, 20 December 2024)
- 05000267/LER-1981-055, Forwards LER 81-055/03L-0.Detailed Event Analysis Encl + (17:15:04, 20 December 2024)
- 05000267/LER-1981-058-03, /03L-0:on 810911,station Battery Taken Out of Svc for Overcharging While Diesel Generator Was Under Repair. Caused by Operator Error.Battery Taken Off Overcharge & Returned to Svc + (17:15:06, 20 December 2024)
- ML20032A723 + (17:15:07, 20 December 2024)
- 05000267/LER-1981-058, Forwards LER 81-058/03L-0 + (17:15:09, 20 December 2024)
- 05000267/LER-1981-056-03, /03L-0:on 810821 & 0902,two Class I Snubbers Were Removed from Svc During Reactor Power Operation.First Event Caused by Need for Structural Mods,Second by Need to Modify Valve Block from Grinnell to Racine + (17:15:11, 20 December 2024)
- 05000267/LER-1981-056, Forwards LER 81-056/03L-0.Detailed Event Analysis Encl + (17:15:13, 20 December 2024)
- ML20032A717 + (17:15:15, 20 December 2024)
- 05000267/LER-1981-057-03, /03L-0:on 810908,engine of Diesel Generator Unit Found Inoperable.Caused by Failed Clutch Bearing.Clutch Bearing & Shaft Replaced & Generator Returned to Svc + (17:15:16, 20 December 2024)
- 05000267/LER-1981-057, Forwards LER 81-057/03L-0.Detailed Event Analysis Encl + (17:15:18, 20 December 2024)
- ML20032A713 + (17:15:20, 20 December 2024)
- 05000313/LER-1981-012-03, /03L-0:on 810821,when Emergency Diesel Generator (EDG) Was Given Autostart Signal Following Turbine Trip,Edg Came to Speed But Failed to Tie In.Overcrank Annunciator Alarmed.Caused by Defective Speed Sensing Relay + (17:15:22, 20 December 2024)
- ML20032A711 + (17:15:23, 20 December 2024)
- 05000313/LER-1981-012, Forwards LER 81-012/03L-0 + (17:15:25, 20 December 2024)
- ML20032A707 + (17:15:27, 20 December 2024)
- 05000313/LER-1981-011-03, /03L-0:on 810810,during Stroke Test,Recirculation Valve of Makeup Pump & Redundant Valve Failed to Show Full Closed Indication.Caused by Valve Torque Settings Too Low to Move Valves Under Sys Pressure.Settings Increased + (17:15:31, 20 December 2024)
- ML20032A704 + (17:15:35, 20 December 2024)
- 05000313/LER-1981-011, Forwards LER 81-011/03L-0 + (17:15:37, 20 December 2024)
- ML20032A700 + (17:15:38, 20 December 2024)
- 05000298/LER-1981-022-03, /03L-0:on 810912,blown Fuse in Valve Motor Circuit Disabled Valve & Reactor Core Isolation Cooling Sys.Caused by Motor Grounded by Grease That Penetrated Defective Seal in Valve Operator & Into Armature.Motor & Seal Replaced + (17:15:39, 20 December 2024)
- 05000298/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Also Submitted + (17:15:44, 20 December 2024)
- 05000368/LER-1981-032-03, /03L-0:on 810815 & 0901,flowpaths to 4 Steam Generators Found Inoperable Due to Failures of Emergency Feedwater Flow Valves.First Event Caused by Relay Failure & Second by Hydraulic Pressure Loss Due to Leaking Seal + (17:15:46, 20 December 2024)
- 05000368/LER-1981-032, Forwards LER 81-032/03L-0 + (17:15:48, 20 December 2024)
- ML20032A682 + (17:15:55, 20 December 2024)
- ML20032A681 + (17:15:57, 20 December 2024)
- ML20032A679 + (17:15:59, 20 December 2024)
- ML20032A678 + (17:16:00, 20 December 2024)
- B10305, Submits Status of Planned Mods & Current Estimated Completion Dates Per NUREG-0578,Item 2.1.6(a) Re Sys Integrity,As Result of IE Circular 79-21 Review + (17:16:02, 20 December 2024)
- ML20032A676 + (17:16:04, 20 December 2024)
- ML20032A675 + (17:16:05, 20 December 2024)
- ML20032A674 + (17:16:06, 20 December 2024)
- ML20032A672 + (17:16:08, 20 December 2024)
- ML20032A671 + (17:16:10, 20 December 2024)
- ML20032A669 + (17:16:12, 20 December 2024)
- ML20032A668 + (17:16:14, 20 December 2024)
- ML20032A667 + (17:16:16, 20 December 2024)
- ML20032A666 + (17:16:17, 20 December 2024)
- ML20032A665 + (17:16:18, 20 December 2024)
- ML20032A664 + (17:16:20, 20 December 2024)
- ML20032A662 + (17:16:21, 20 December 2024)
- ML20032A660 + (17:16:22, 20 December 2024)
- ML20032A659 + (17:16:23, 20 December 2024)
- ML20032A658 + (17:16:25, 20 December 2024)
- ML20032A657 + (17:16:26, 20 December 2024)
- ML20032A656 + (17:16:27, 20 December 2024)
- ML20032A654 + (17:16:28, 20 December 2024)
- ML20032A653 + (17:16:30, 20 December 2024)
- ML20032A652 + (17:16:30, 20 December 2024)