Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039B283 + (05:20:07, 20 December 2024)
- ML20039B282 + (05:20:08, 20 December 2024)
- ML20039B280 + (05:20:09, 20 December 2024)
- ML20039B279 + (05:20:10, 20 December 2024)
- PNO-III-81-113, on 811211,Unit 2 Tripped from 90% Power Due to Generator Trip.Cause Undetermined.Two Auxiliary Feedwater Pumps Failed to Start Automatically.Unit Will Remain Shutdown Until Cause Identified + (05:20:12, 20 December 2024)
- ML20039B277 + (05:20:13, 20 December 2024)
- ML20039B276 + (05:20:15, 20 December 2024)
- ML20039B275 + (05:20:16, 20 December 2024)
- IR 05000282/1981020 + (05:20:42, 20 December 2024)
- ML20039B272 + (05:20:48, 20 December 2024)
- ML20039B270 + (05:20:50, 20 December 2024)
- ML20039B269 + (05:20:51, 20 December 2024)
- ML20039B268 + (05:20:52, 20 December 2024)
- ML20039B267 + (05:20:54, 20 December 2024)
- ML20039B266 + (05:20:55, 20 December 2024)
- W3P81-2555, Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. Facility Design Does Not Employ Westinghouse Electro Mechanical Div Gate Valves + (05:20:56, 20 December 2024)
- ML20039B263 + (05:20:59, 20 December 2024)
- ML20039B261 + (05:21:00, 20 December 2024)
- ML20039B262 + (05:21:00, 20 December 2024)
- ML20039B259 + (05:21:01, 20 December 2024)
- 0CAN118107, Advises That Util Will Be Unable to Meet 811201 Commitment Re Placement of Nuclear Data Counting Sys in Emergency Control Ctr,Due to Problem w/ND-60 Multichannel Analyzer + (05:21:02, 20 December 2024)
- 05000266/LER-1981-014-01, /01T-1:on 811010,while Performing Refueling Leakage Tests of Containment Isolation valves,4-inch Check Valve in Svc Air Supply Found to Have Leakage Exceeding Tech Specs.Caused by Foreign Matl in Internals + (05:21:05, 20 December 2024)
- ML20039B255 + (05:21:06, 20 December 2024)
- B10286, Forwards SAR for SEP Topic IX-5, Ventilation Sys, Per Util 810729 Commitment + (05:21:08, 20 December 2024)
- 05000266/LER-1981-014, Forwards LER 81-014/01T-1 + (05:21:10, 20 December 2024)
- 05000315/LER-1981-053-04, /04T-0:on 811204,alarm Received on Radiation Monitoring Sys Channel R-26,suggesting Small Gaseous Release in Progress.Apparently Caused by Leakage from Vol Control Tank Via Valve RS0-300.Valve Repaired + (05:21:13, 20 December 2024)
- ML20039B250 + (05:21:15, 20 December 2024)
- ML20039B248 + (05:21:16, 20 December 2024)
- ML20039B249 + (05:21:16, 20 December 2024)
- 05000315/LER-1981-053, Forwards LER 81-053/04T-0 + (05:21:18, 20 December 2024)
- ML20039B244 + (05:21:19, 20 December 2024)
- ML20039B242 + (05:21:20, 20 December 2024)
- ML20039B240 + (05:21:23, 20 December 2024)
- ML20039B237 + (05:21:24, 20 December 2024)
- ML20039B234 + (05:21:26, 20 December 2024)
- 05000409/LER-1981-013, Forwards LER 81-013/03L-0.Detailed Event Analysis Submitted + (05:21:29, 20 December 2024)
- 05000263/LER-1981-021, /03L-0:on 811110,during Cold shutdown,4 Channel a Main Steam Line High Flow Switches Found Inoperable.Caused by Heating of Switching Element Due to Relay Coil Failure, Initially Reported in LER 81-021.Elements Replaced + (05:21:31, 20 December 2024)
- ML20039B227 + (05:21:32, 20 December 2024)
- ML20039B226 + (05:21:33, 20 December 2024)
- 05000263/LER-1981-023, Forwards LER 81-023/03L-0 + (05:21:34, 20 December 2024)
- ML20039B222 + (05:21:35, 20 December 2024)
- ML20039B220 + (05:21:37, 20 December 2024)
- IR 05000508/1981018 + (05:21:38, 20 December 2024)
- ML20039B218 + (05:21:42, 20 December 2024)
- ML20039B214 + (05:21:43, 20 December 2024)
- ML20039B216 + (05:21:43, 20 December 2024)
- ML20039B213 + (05:21:45, 20 December 2024)
- IR 05000344/1981030 + (05:21:46, 20 December 2024)
- RBG-11-502, Responds to IE Bulletin 81-02,Suppl 1, Failure of Gate Type Valves to Close Against Differential Pressure. Westinghouse Electro-Mechanical Div Motor Operated Valves Not Employed in Plant Design.Response Concluded + (05:21:47, 20 December 2024)
- ML20039B210 + (05:21:49, 20 December 2024)
- ML20039B209 + (05:21:50, 20 December 2024)