Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20039C138 + (05:07:20, 20 December 2024)
- ML20039C136 + (05:07:21, 20 December 2024)
- LD-81-096, Forwards Supplemental Emergency Core Cooling Analysis in Response to Confirmatory Issue 5 of CESSAR SER + (05:07:22, 20 December 2024)
- ML20039C135 + (05:07:22, 20 December 2024)
- ML20039C133 + (05:07:24, 20 December 2024)
- ML20039C132 + (05:07:25, 20 December 2024)
- ML20039C131 + (05:07:27, 20 December 2024)
- ML20039C130 + (05:07:28, 20 December 2024)
- ML20039C129 + (05:07:29, 20 December 2024)
- ML20039C128 + (05:07:29, 20 December 2024)
- ML20039C127 + (05:07:30, 20 December 2024)
- 0CAN128109, Submits Update on Status of NUREG-0737 Items II.B.3 & II.F.1.1 Re post-accident Sampling & Noble Gas Effluent Monitors,Respectively,Per .Proposed Schedule May Be Changed + (05:07:31, 20 December 2024)
- 05000336/LER-1981-038-03, /03L-0:on 811119,control Element Assembly 44 Was Inserted to 174 Steps & Could Not Be Withdrawn.Cause Undetermined.Assembly Successfully Retracted During Trouble Shooting.Coil Current Traces Evaluated + (05:07:34, 20 December 2024)
- 05000336/LER-1981-038, Forwards LER 81-038/03L-0 + (05:07:35, 20 December 2024)
- ML20039C122 + (05:07:36, 20 December 2024)
- ML20039C121 + (05:07:37, 20 December 2024)
- 05000029/LER-1981-029-01, /01T-1:on 811105,low Main Coolant Flow Sys 3 Undercurrent Relays Failed to Drop Out When de-energized. Caused by Bushing Wear Due to Mechanical Vibration.Plunger Bushings to Be Replaced & Surveillance Frequency Increased + (05:07:42, 20 December 2024)
- ML20039C119 + (05:07:44, 20 December 2024)
- 05000029/LER-1981-029, Forwards LER 81-029/01T-1 + (05:07:45, 20 December 2024)
- ML20039C116 + (05:07:46, 20 December 2024)
- 05000029/LER-1981-031-03, /03L-0:on 811119,low Main Coolant Flow Sys Relay 4B in Sys a Failed to Drop Out When de-energized.Caused by Relay Bushing Wear Due to Mechanical Vibration.Relay Replaced & Tested Satisfactorily.Test Frequency Increased + (05:07:48, 20 December 2024)
- 0CAN128104, Provides Supplemental Info to Concerning Installation of Emergency Lighting.Emergency Lighting Exists in Areas Needed for Operating of Safe Shutdown Equipment & in Access & Egress Routes + (05:07:49, 20 December 2024)
- ML20039C113 + (05:07:51, 20 December 2024)
- 05000029/LER-1981-031, Forwards LER 81-031/03L-0 + (05:07:54, 20 December 2024)
- 05000320/LER-1981-033-01, /01L-0:on 811113,once-through Steam Generator Level Indication B Failed.Caused by 12-volt Dc Power Supply for Transmitter Failure.Power Supply Replaced + (05:07:56, 20 December 2024)
- 05000213/LER-1981-020-03, /03L-0:on 811122,steam Flow Instrument for Steam Line 1 Observed to Have Decreased 15% of Rated Steam Flow W/O Power Reduction Taking Place.Caused by Leaking Drain Valve from Differential Pressure Transmitter + (05:07:58, 20 December 2024)
- 05000320/LER-1981-033, Forwards LER 81-033/01L-0 + (05:08:00, 20 December 2024)
- ML20039C105 + (05:08:01, 20 December 2024)
- 05000219/LER-1981-056-03, /03L-0:on 811113,isolation Condenser Isolation Pipe Break Sensors IB11A1 & IB11A2 Tripped at Value Greater than Tech Spec Limits.Caused by Instrument Repeatability & Drift.Switches Reset & Will Be Replaced in Future Outage + (05:08:02, 20 December 2024)
- ML20039C103 + (05:08:03, 20 December 2024)
- 05000213/LER-1981-020, Forwards LER 81-020/03L-0 + (05:08:05, 20 December 2024)
- 05000219/LER-1981-056, Forwards LER 81-056/03L-0.Detailed Event Analysis Encl + (05:08:07, 20 December 2024)
- ML20039C096 + (05:08:10, 20 December 2024)
- ML20039C092 + (05:08:15, 20 December 2024)
- ML20039C090 + (05:08:17, 20 December 2024)
- ML20039C089 + (05:08:17, 20 December 2024)
- ML20039C088 + (05:08:18, 20 December 2024)
- ML20039C086 + (05:08:19, 20 December 2024)
- ML20039C087 + (05:08:19, 20 December 2024)
- ML20039C085 + (05:08:20, 20 December 2024)
- CLI-81-34, Order CLI-81-34,revising Commission 811130 Order Re Scheduling.Comments on ASLB 811214 Decision Due 820113.Reply Comments on 820120.Commission,not Aslab Has Stay Authority + (05:08:22, 20 December 2024)
- ML20039C080 + (05:08:23, 20 December 2024)
- ML20039C079 + (05:08:24, 20 December 2024)
- ML20039C078 + (05:08:24, 20 December 2024)
- ML20039C077 + (05:08:25, 20 December 2024)
- 05000311/LER-1981-121-03, /03L-0:on 811118 & 19,control Operator Noticed Individual Rod Position Indicator & Control Rod Bank Demand Indicator for Rod 2SB2 in Disagreement Greater than Tech Specs.Cause Not Stated.Meter Movemement Recalibr & Replaced + (05:08:26, 20 December 2024)
- ML20039C075 + (05:08:28, 20 December 2024)
- ML20039C071 + (05:08:29, 20 December 2024)
- ML20039C072 + (05:08:29, 20 December 2024)
- 05000311/LER-1981-121, Forwards LER 81-121/03L-0.Detailed Event Analysis Encl + (05:08:31, 20 December 2024)
- ML20039C068 + (05:08:32, 20 December 2024)