Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20041F858 + (00:09:17, 20 December 2024)
- ML20041F856 + (00:09:18, 20 December 2024)
- 05000269/LER-1982-001, Forwards LER 82-001/03L-0.Detailed Event Analysis Encl + (00:09:20, 20 December 2024)
- 05000325/LER-1982-012, Forwards LER 82-012/03L-0 + (00:09:21, 20 December 2024)
- ML20041F850 + (00:09:23, 20 December 2024)
- ML20041F849 + (00:09:24, 20 December 2024)
- 05000324/LER-1982-029-03, /03L-0:on 820203,discovered Suction Header Low Pressure Lockout Rendering Divs I & II RHR Svc Water Subsystem Inoperable.Caused by Loss of Operating Fluid Level in Diaphragm Housing of Suction Header Pressure Switch + (00:09:25, 20 December 2024)
- IR 05000518/1982002 + (00:09:27, 20 December 2024)
- ML20041F846 + (00:09:29, 20 December 2024)
- 05000324/LER-1982-029, Forwards LER 82-029/03L-0.Detailed Event Analysis Encl + (00:09:30, 20 December 2024)
- IR 05000369/1982003 + (00:09:33, 20 December 2024)
- ML20041F842 + (00:09:34, 20 December 2024)
- ML20041F841 + (00:09:35, 20 December 2024)
- ML20041F839 + (00:09:36, 20 December 2024)
- 05000324/LER-1982-027-03, /03L-0:on 820202,main Steam Line Radiation High Channel D Would Not Actuate When Test Signal Was Applied to Channel Input Instrument D12-RM-K603D.Caused by Melted Insulation from Relay Coil of Channel Actuation Relay + (00:09:37, 20 December 2024)
- ML20041F837 + (00:09:38, 20 December 2024)
- ML20041F835 + (00:09:39, 20 December 2024)
- ML20041F834 + (00:09:41, 20 December 2024)
- 05000324/LER-1982-027, Forwards LER 82-027/03L-0 + (00:09:43, 20 December 2024)
- ML20041F830 + (00:09:45, 20 December 2024)
- ML20041F829 + (00:09:46, 20 December 2024)
- 05000269/LER-1982-004-01, /01T-0:on 820217,exam of Radiograph on Weld 85 on Isometric Drawing 11 Indicated Circumferential Void.Caused by Improper fit-up Weld & Insp During Initial Const.Section of Weld Replaced & Socket Welded to Coupling + (00:09:47, 20 December 2024)
- 05000298/LER-1982-004-03, /03L-0:on 820109,during Planned Power Reduction, Min Critical Power Ratio Was Below Operating Limit W/O Initiation of Corrective Actions Required by Tech Specs. Caused by Personnel Error.Procedures Will Be Revised + (00:09:49, 20 December 2024)
- 05000269/LER-1982-004, Forwards LER 82-004/01T-0.Detailed Event Analysis Encl + (00:09:50, 20 December 2024)
- ML20041F822 + (00:09:51, 20 December 2024)
- 05000298/LER-1982-004, Forwards LER 82-004/03L-0.Detailed Event Analysis Submitted + (00:09:53, 20 December 2024)
- ML20041F819 + (00:09:54, 20 December 2024)
- ML20041F818 + (00:09:55, 20 December 2024)
- ML20041F817 + (00:09:57, 20 December 2024)
- ML20041F815 + (00:09:58, 20 December 2024)
- ML20041F814 + (00:09:59, 20 December 2024)
- ML20041F813 + (00:10:00, 20 December 2024)
- ML20041F811 + (00:10:01, 20 December 2024)
- ML20041F810 + (00:10:05, 20 December 2024)
- ML20041F809 + (00:10:06, 20 December 2024)
- ML20041F807 + (00:10:07, 20 December 2024)
- ML20041F808 + (00:10:07, 20 December 2024)
- ML20041F805 + (00:10:08, 20 December 2024)
- ML20041F803 + (00:10:09, 20 December 2024)
- ML20041F802 + (00:10:10, 20 December 2024)
- ML20041F800 + (00:10:11, 20 December 2024)
- ML20041F799 + (00:10:12, 20 December 2024)
- ML20041F797 + (00:10:13, 20 December 2024)
- IR 05000327/1981039 + (00:10:19, 20 December 2024)
- ML20041F795 + (00:10:20, 20 December 2024)
- IR 05000338/1982003 + (00:10:21, 20 December 2024)
- ML20041F792 + (00:10:23, 20 December 2024)
- ML20041F790 + (00:10:24, 20 December 2024)
- IR 05000302/1981009 + (00:10:25, 20 December 2024)
- ML20041F786 + (00:10:26, 20 December 2024)
- ML20041F784 + (00:10:26, 20 December 2024)