Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23101A037 + (23:34:35, 2 January 2025)
- NLS2023021, Quality Assurance Program Changes + (23:34:44, 2 January 2025)
- EPID:L-2022-LLA-0072 + (23:34:48, 2 January 2025)
- PMNS20230202, Notice of Meeting with Southern Nuclear Operating Company + (23:34:56, 2 January 2025)
- ML23097A016 + (23:35:13, 2 January 2025)
- EPID:L-2022-LLM-0004 + (23:35:22, 2 January 2025)
- EPID:L-2022-LLE-0021 + (23:35:33, 2 January 2025)
- ML23096A129 + (23:35:44, 2 January 2025)
- ML23096A045 + (23:35:47, 2 January 2025)
- ML23096A044 + (23:35:49, 2 January 2025)
- ML23096A043 + (23:35:51, 2 January 2025)
- ML23096A040 + (23:35:58, 2 January 2025)
- 05000366/LER-2023-001, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) + (23:36:35, 2 January 2025)
- ML23095A021 + (23:36:54, 2 January 2025)
- ML23095A017 + (23:37:00, 2 January 2025)
- ML23095A015 + (23:37:02, 2 January 2025)
- ML23094A305 + (23:37:06, 2 January 2025)
- ML23094A150 + (23:37:24, 2 January 2025)
- ML23094A135 + (23:37:27, 2 January 2025)
- EPID:L-2022-LLE-0022 + (23:37:30, 2 January 2025)
- IR 05000324/2022004 + (23:38:07, 2 January 2025)
- ML23090A124 + (23:38:13, 2 January 2025)
- ML23090A019 + (23:38:23, 2 January 2025)
- 05000348/LER-2023-001, Automatic Reactor Trip Due to DC Ground on Turbine Trip Solenoid + (23:38:35, 2 January 2025)
- ML23089A175 + (23:38:51, 2 January 2025)
- RA-23-0079, Cycle 29, Revision 0, Core Operating Limits Report (COLR) + (23:39:00, 2 January 2025)
- ML23088A243 + (23:39:35, 2 January 2025)
- EPID:L-2022-LLA-0049 + (23:39:57, 2 January 2025)
- ML23088A124 + (23:40:05, 2 January 2025)
- ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control + (23:40:08, 2 January 2025)
- SECY-22-0009, VR-SECY-22-0009: Proposed Limited Revision to Policy Statement on Criteria for Reporting Abnormal Occurrences + (23:40:10, 2 January 2025)
- ML23088A021 + (23:40:17, 2 January 2025)
- ULNRC-06804, Submittal of Nuclear Property Insurance Reporting + (23:40:22, 2 January 2025)
- LR-N23-0024, Submittal of Hope Creek Generating Station Technical Specification Bases Changes + (23:40:24, 2 January 2025)
- L-PI-23-007, Supplement to Application to Revise Technical Specification Section 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) + (23:40:41, 2 January 2025)
- NUREG-0750 Volume 96, Nuclear Regulatory Commission Issuances: Opinions and Decisions of the Nuclear Regulatory Commission with Selected Orders (July 1, 2022 - December 31, 2022) + (23:40:58, 2 January 2025)
- ML23087A087 + (23:41:02, 2 January 2025)
- 05000259/LER-2023-001, High Pressure Coolant Injection System Inoperable Due to a Torn Valve Diaphragm + (23:41:10, 2 January 2025)
- ML23083B826 + (23:41:41, 2 January 2025)
- ML23082A309 + (23:41:57, 2 January 2025)
- ASLBP 22-974-01-LT-BD01, Certification of Record to Commission (LBP-23-05) + (23:42:36, 2 January 2025)
- PMNS20221271, Meeting with NuScale Power, LLC on 10 CFR 50.155, Mitigation of beyond-design-basis Events + (23:43:11, 2 January 2025)
- EPID:L-2021-LLA-0235 + (23:43:14, 2 January 2025)
- IR 05000333/2022004 + (23:43:46, 2 January 2025)
- EPID:L-2022-LLM-0003 + (23:44:27, 2 January 2025)
- ML23074A166 + (23:44:48, 2 January 2025)
- ML23073A398 + (23:45:01, 2 January 2025)
- 05200025/LER-2023-001, Manual Actuation of Reactor Protection System During Mode 3 Due to an Inadequate Procedure Step + (23:45:06, 2 January 2025)
- ML23073A290 + (23:45:35, 2 January 2025)
- ML23073A180 + (23:46:00, 2 January 2025)
- L-23-085, 1 to Emergency Plan + (23:46:02, 2 January 2025)