Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24116A060 + (21:00:50, 2 January 2025)
- ML24116A059 + (21:00:52, 2 January 2025)
- ML24116A055 + (21:00:56, 2 January 2025)
- ML24116A051 + (21:00:58, 2 January 2025)
- ML24116A049 + (21:01:00, 2 January 2025)
- 05000366/LER-2024-002, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications + (21:01:15, 2 January 2025)
- ML24115A195 + (21:01:16, 2 January 2025)
- IR 05000397/2024001 + (21:01:18, 2 January 2025)
- 05000318/LER-2024-001, Manual Reactor Trip Due to 22 Steam Generator Feed Pump Trip + (21:01:19, 2 January 2025)
- 05000296/LER-2024-002, Breaker Trip Automatically Started an Emergency Diesel Generator + (21:01:21, 2 January 2025)
- IR 05000269/2024402 + (21:01:24, 2 January 2025)
- IR 05000445/2024001 + (21:01:29, 2 January 2025)
- U-604803, Submittal of 2023 Annual Radiological Environmental Operation Report + (21:01:36, 2 January 2025)
- U-604802, Submittal of 2023 Annual Radioactive Effluent Release Report + (21:01:38, 2 January 2025)
- IR 05000244/2024001 + (21:01:40, 2 January 2025)
- IR 05000298/2024010 + (21:01:50, 2 January 2025)
- ML24114A174 + (21:02:02, 2 January 2025)
- ML24114A161 + (21:02:04, 2 January 2025)
- ML24114A149 + (21:02:08, 2 January 2025)
- ML24114A142 + (21:02:10, 2 January 2025)
- ML24114A137 + (21:02:12, 2 January 2025)
- ML24114A126 + (21:02:17, 2 January 2025)
- ML24114A123 + (21:02:20, 2 January 2025)
- ML24114A121 + (21:02:22, 2 January 2025)
- PNP 2024-008, Annual Radioactive Effluent Release Report + (21:02:29, 2 January 2025)
- ML24113A305 + (21:02:36, 2 January 2025)
- EPID:L-2022-DFA-0000 + (21:02:38, 2 January 2025)
- ML24113A302 + (21:02:38, 2 January 2025)
- PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095) + (21:02:43, 2 January 2025)
- CNL-24-037, Clinch River, Sequoyah, Units 1 and 2, Watts Bar, Unit 1 and 2, Nuclear Quality Assurance Plan, TVA-NQA-PLN89-A, Revision 42 + (21:02:45, 2 January 2025)
- ML24113A265 + (21:02:47, 2 January 2025)
- ML24113A237 + (21:02:52, 2 January 2025)
- 05000296/LER-2024-001, Primary Containment Isolation Valve Inoperable Due to Incorrect Motor Operated Valve Setup + (21:02:56, 2 January 2025)
- IR 05000440/2024001 + (21:03:08, 2 January 2025)
- 05000298/LER-2024-003, High Pressure Coolant Injection Steam Leak Causes Condition That Could Have Prevented Fulfillment of a Safety Function and a Condition Prohibited by Technical Specifications + (21:03:12, 2 January 2025)
- IR 05000275/2024001 + (21:03:15, 2 January 2025)
- ML24113A025 + (21:03:20, 2 January 2025)
- EPID:L-2023-LLE-0013 + (21:03:23, 2 January 2025)
- IR 05000456/2024001 + (21:03:27, 2 January 2025)
- IR 05000282/2024401 + (21:03:35, 2 January 2025)
- IR 05000443/2024501 + (21:03:39, 2 January 2025)
- ML24109A252 + (21:03:45, 2 January 2025)
- ML24109A190 + (21:03:49, 2 January 2025)
- ML24109A181 + (21:03:50, 2 January 2025)
- ML24109A169 + (21:03:51, 2 January 2025)
- ML24109A089 + (21:04:17, 2 January 2025)
- ML24109A087 + (21:04:20, 2 January 2025)
- ML24109A085 + (21:04:23, 2 January 2025)
- 05000260/LER-2024-001-01, Secondary Containment Isolation Valve Inoperable Due to Mechanical Failure + (21:04:36, 2 January 2025)
- ML24108A146 + (21:04:40, 2 January 2025)
- 05000395/LER-2024-001, (Vcsns), Unit 1, Automatic Actuation of B Emergency Diesel Generator + (21:04:42, 2 January 2025)
- ML24108A145 + (21:04:42, 2 January 2025)