Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GL-704778-29, GLTS: Past Due Annual Registration of Generally Licensed Devices: Sunoco Pipeline (GL-704778-29) + (20:43:16, 2 January 2025)
- GL-720303-29, GLTS: Past Due General License Device Annual Registration - New Trinity Coal Inc. (GL-720303-29) + (20:43:22, 2 January 2025)
- GL-704554-29, GLTS: Past Due Annual Registration of Generally Licensed Devices: National Galvanizing (GL-704554-29) + (20:43:25, 2 January 2025)
- GL-704428-29, GLTS: Past Due Annual Registration of Generally Licensed Devices: Nestle Purina Petcare (GL-704428-29) + (20:43:31, 2 January 2025)
- GL-720300-29, GLTS: Past Due General License Device Annual Registration - Carter Roag Coal Company - (GL-720300-29) + (20:43:37, 2 January 2025)
- GL-713145-29, GLTS: Past Due General License Device Annual Registration - Mill Steel Company - (GL-713145-29) + (20:43:44, 2 January 2025)
- GL-711628-29, GLTS: Past Due General License Device Annual Registration - Refresco North America - (GL-711628-29) + (20:43:58, 2 January 2025)
- GL-711612-29, GLTS: Past Due General License Device Annual Registration - U.S. Army Corps of Engineers - (GL-711612-29) + (20:44:01, 2 January 2025)
- GL-707775-29, GLTS: Past Due General License Device Annual Registration - Welch Foods Inc - (GL-707775-29) + (20:44:04, 2 January 2025)
- ML24151A116 + (20:44:07, 2 January 2025)
- ML24150A385 + (20:44:31, 2 January 2025)
- ML24150A361 + (20:44:34, 2 January 2025)
- GL-704239-29, GLTS: Past Due Annual Registration of Generally Licensed Devices: Midwest Timber (GL-704239-29) + (20:44:38, 2 January 2025)
- ML24150A273 + (20:44:45, 2 January 2025)
- GL-700568-29, GLTS: Past Due Annual Registration of Generally Licensed Devices: Gaska Tape, Inc. GL-700568-29 + (20:44:47, 2 January 2025)
- ML24150A207 + (20:44:57, 2 January 2025)
- ML24150A182 + (20:45:01, 2 January 2025)
- IR 05000263/2024401 + (20:45:03, 2 January 2025)
- IR 05000443/2024010 + (20:45:05, 2 January 2025)
- IR 05000373/2024010 + (20:45:07, 2 January 2025)
- LR-N24-0040, Attachment 3: Decommissioning Cost Analysis for Peach Bottom Atomic Power Station, Units 2 and 3 + (20:45:18, 2 January 2025)
- ML24150A004 + (20:45:28, 2 January 2025)
- 05000416/LER-2024-002, Automatic Actuation of Reactor Protection System + (20:45:39, 2 January 2025)
- ML24149A124 + (20:45:45, 2 January 2025)
- PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122) + (20:45:49, 2 January 2025)
- 05000186/LER-2024-001, Written Communication as Required by by LER 2024-001-00 for University of Missouri Research Reactor Technical Specification 6.6.c(3) Re Deviation from Technical Specification 3.1 0.d + (20:45:57, 2 January 2025)
- ML24145A128 + (20:46:02, 2 January 2025)
- RS-24-043, Application to Remove Power Distribution Monitoring System (Pdms) Details from Technical Specifications + (20:46:04, 2 January 2025)
- 05000387/LER-2024-001, Main Steam Isolation Valve Leakage + (20:46:23, 2 January 2025)
- 05000529/LER-2024-001, Valid Specified System Actuations of Unit 2 Train B Emergency Diesel Generator and Train B Auxiliary Feedwater + (20:46:23, 2 January 2025)
- IR 05000338/2024010 + (20:46:26, 2 January 2025)
- IR 05000443/2024011 + (20:46:30, 2 January 2025)
- ML24144A094 + (20:46:44, 2 January 2025)
- ML24142A442 + (20:47:22, 2 January 2025)
- ML24142A438 + (20:47:24, 2 January 2025)
- ML24142A385 + (20:47:37, 2 January 2025)
- STC-24-029, Notification of the NRC SECY-24-0035, Advancing the Use of Artificial Intelligence at the U.S. Nuclear Regulatory Commission + (20:48:03, 2 January 2025)
- ML24141A286 + (20:48:22, 2 January 2025)
- 05000260/LER-2024-002, High Pressure Coolant Injection Inoperable Due to Rupture Disc Failure and Resulting System Isolation + (20:48:43, 2 January 2025)
- IR 05000259/2024403 + (20:48:47, 2 January 2025)
- 05000423/LER-2023-006-01, Pressurizer Power Operated Relief Valve Failed to Open During Surveillance Testing Resulting in a Condition Prohibited by Technical Specifications + (20:48:49, 2 January 2025)
- ML24141A146 + (20:48:51, 2 January 2025)
- LR-N24-0004, License Amendment Request – Revise Technical Specification to Change Surveillance Intervals to Accommodate a 24-Month Fuel Cycle + (20:48:55, 2 January 2025)
- 05000316/LER-2024-001, Reactor Trip Due to Main Turbine Trip from a High-High Thrust Bearing Position Trip + (20:48:56, 2 January 2025)
- ML24141A101 + (20:48:59, 2 January 2025)
- 05000323/LER-2024-001, LCO 3.0.3 Completion Time Limits + (20:49:08, 2 January 2025)
- IR 05000461/2024012 + (20:49:33, 2 January 2025)
- 05000373/LER-2024-002, Reactor Protection System Half Scram Due to Motor Generator Set Electric Power Monitoring Assembly Output Breaker Trip + (20:49:35, 2 January 2025)
- 05000382/LER-2024-002, Automatic Reactor Trip Due to Transformer Failure + (20:49:37, 2 January 2025)
- EPID:L-2023-LLA-0038 + (20:49:44, 2 January 2025)
- SRM-M240516A, Enclosure - Affirmation Session - SECY-24-0017: Final Rule - Renewing Nuclear Power Plant Operating Licenses - Environmental Review (Rin 3150-AK32; NRC-2018-0296) + (20:49:54, 2 January 2025)