Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML24197A212 + (20:23:03, 2 January 2025)
- ML24197A211 + (20:23:07, 2 January 2025)
- EPID:L-2023-LLR-0057 + (20:23:08, 2 January 2025)
- ML24197A199 + (20:23:10, 2 January 2025)
- IR 05000255/2024011 + (20:23:17, 2 January 2025)
- ML24197A090 + (20:23:25, 2 January 2025)
- 05000316/LER-2024-002, Manual Reactor Trip Following Rapid Downpower for Steam Leak + (20:23:26, 2 January 2025)
- IR 05000333/2024401 + (20:23:27, 2 January 2025)
- STC-24-039, Issuance of the Final Rule of the Revised Generic Environmental Impact Statement for License Renewal of Nuclear Plants (NUREG 1437, Revision 2) + (20:23:33, 2 January 2025)
- NUREG-1433, – Acceptance of License Amendment Request Concerning Technical Specification Conversion to NUREG-1433, Revision 5 + (20:23:46, 2 January 2025)
- 05000391/LER-2024-003, Inoperability of Both Trains of Unit 2 Low Head Safety Injection + (20:23:50, 2 January 2025)
- ML24193A300 + (20:23:52, 2 January 2025)
- IR 05000445/2024403 + (20:23:55, 2 January 2025)
- ML24193A117 + (20:24:08, 2 January 2025)
- ML24193A054 + (20:24:12, 2 January 2025)
- ML24193A051 + (20:24:13, 2 January 2025)
- L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal + (20:24:23, 2 January 2025)
- IR 05000275/2024014 + (20:24:25, 2 January 2025)
- ML24192A182 + (20:24:37, 2 January 2025)
- 05000382/LER-2024-003, Automatic EFAS Actuation During Surveillance Test + (20:24:39, 2 January 2025)
- IR 05000298/2024301 + (20:24:40, 2 January 2025)
- ML24192A129 + (20:24:43, 2 January 2025)
- ML24192A119 + (20:24:45, 2 January 2025)
- ML24191A481 + (20:24:47, 2 January 2025)
- ML24191A484 + (20:24:47, 2 January 2025)
- PNP 2024-027, Supplement to License Amendment Request to Revise Renewed Facility Operating License and Permanently Defueled Technical Specifications to Support Resumption of Power Operations + (20:24:52, 2 January 2025)
- IR 05000266/2024010 + (20:24:54, 2 January 2025)
- ML24191A399 + (20:24:56, 2 January 2025)
- OIG-22-A-06, Status of Recommendations: Audit of the Nuclear Regulatory Commission’S Oversight of Counterfeit, Fraudulent, and Suspect Items at Nuclear Power Reactors, Dated, July 8, 2024 + (20:24:59, 2 January 2025)
- NMP1L3582, 2023 Annual Radioactive Environmental Operating Report for Nine Mile Point Units 1 and 2 + (20:25:05, 2 January 2025)
- ML24191A267 + (20:25:11, 2 January 2025)
- ML24191A261 + (20:25:13, 2 January 2025)
- IR 05000440/2024401 + (20:25:15, 2 January 2025)
- IR 05000317/2024401 + (20:25:18, 2 January 2025)
- ML24191A045 + (20:25:20, 2 January 2025)
- 05000296/LER-2024-003, Main Steam Relief Valves Lift Settings Outside of Technical Specifications Required Setpoints + (20:25:30, 2 January 2025)
- IR 05000334/2024501 + (20:25:31, 2 January 2025)
- IR 05000333/2024010 + (20:25:33, 2 January 2025)
- ML24190A081 + (20:25:34, 2 January 2025)
- EPID:L-2024-CPS-0000 + (20:25:45, 2 January 2025)
- 05000321/LER-2024-003, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link + (20:25:50, 2 January 2025)
- IR 05000275/2024401 + (20:25:51, 2 January 2025)
- 05000321/LER-2024-002-01, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications + (20:25:52, 2 January 2025)
- IR 05000498/2024404 + (20:25:53, 2 January 2025)
- 05000456/LER-2024-001, Trip on Low Steam Generator Level Ddue to Failure to Verify Isolation Valves Were Open + (20:26:05, 2 January 2025)
- 05000259/LER-2024-001-01, Inoperability of Unit 3 Diesel Generator Due to Relay Failure + (20:26:07, 2 January 2025)
- IR 05000369/2024401 + (20:26:08, 2 January 2025)
- EPID:L-2023-LRM-0035 + (20:26:09, 2 January 2025)
- 05000334/LER-2024-003, Unanalyzed Containment Bypass Condition Due to Degraded River Water Piping + (20:26:20, 2 January 2025)
- ML24185A029 + (20:26:22, 2 January 2025)
- 05000482/LER-2024-001, Mode 3 Entry with One Auxiliary Feedwater Pump Train Inoperable Due to Missed Post-Maintenance Testing + (20:26:44, 2 January 2025)