Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000324/LER-1980-021-03, /03L-0:on 800516,during Performance of Reactor Low Pressure Channel Calibr Functional Test,Switches 1 & 2 of 2-B21-PS-NO21D Were Found Out of Calibr.Caused by Instrument Drift.Switches Recalbir + (02:07:25, 2 January 2025)
- 05000368/LER-1980-028, Forwards LER 80-028/03L-0 + (02:07:27, 2 January 2025)
- AECM-80-120, Forwards Correction to Which Misrepresented Fuel Load Date for Unit 1.Correct Date Is 810831 + (02:07:28, 2 January 2025)
- 05000368/LER-1980-026, Forwards LER 80-026/03L-0 + (02:07:35, 2 January 2025)
- 05000368/LER-1980-012, Forwards Updated LER 80-012/03X-2 + (02:07:36, 2 January 2025)
- 05000324/LER-1980-021, Forwards LER 80-021/03L-0 + (02:07:38, 2 January 2025)
- 05000325/LER-1980-051-03, /03L-0:on 800515,during Normal Surveillance, Containment Atmosphere Dilution Tank Vol Observed Less than Required Limit.Caused by Inability to Open CAC Tank Manual Outlet Isolation valve,CAC-HV-44 + (02:07:40, 2 January 2025)
- ML19318A103 + (02:07:41, 2 January 2025)
- 05000325/LER-1980-051, Forwards LER 80-051/03L-0 + (02:07:42, 2 January 2025)
- ML19318A100 + (02:07:43, 2 January 2025)
- 05000325/LER-1980-052-03, /03L-0:on 800514,during Normal Surveillance, Primary Containment Oxygen analyzer,1-CAC-ATH-1259-2,found Giving Erratic Indications.Caused by Corrosion in Magnetic Analyzer Sample Cell.Unit Replaced & Returned to Svc + (02:07:44, 2 January 2025)
- ML19318A097 + (02:07:45, 2 January 2025)
- 05000325/LER-1980-052, Forwards LER 80-052/03L-0 + (02:07:46, 2 January 2025)
- ML19318A094 + (02:07:47, 2 January 2025)
- ML19318A092 + (02:07:48, 2 January 2025)
- 05000317/LER-1980-028-03, /03L-0:on 800515,during Performance of Routine Test,Diesel Generator 12 Failed to Reach Rated Speed in Less than 10-s Until Third Attempt.Caused by Intermittent Female Pin & Crack in Bakelite Spacer of Anphenol Connector + (02:07:49, 2 January 2025)
- ML19318A088 + (02:07:50, 2 January 2025)
- ML19318A090 + (02:07:50, 2 January 2025)
- ML19318A087 + (02:07:51, 2 January 2025)
- PM-80-591, Forwards Monthly Operating Rept for May 1980 + (02:07:52, 2 January 2025)
- ML19318A084 + (02:07:53, 2 January 2025)
- ML19318A082 + (02:07:54, 2 January 2025)
- 05000317/LER-1980-028, Forwards LER 80-028/03L-0 + (02:07:55, 2 January 2025)
- ML19318A079 + (02:07:56, 2 January 2025)
- ML19318A078 + (02:07:57, 2 January 2025)
- BSEP-80-1002, Ro:While Performing Required Insps Per IE Bulletin 79-01B, Determined That Documentation Did Not Exist to Prove That Splices Connecting Automatic Valve Co Solenoids Are Environmentally Qualified.Splices Being Evaluated + (02:07:58, 2 January 2025)
- ML19318A075 + (02:07:59, 2 January 2025)
- ML19318A074 + (02:08:00, 2 January 2025)
- ML19318A073 + (02:08:01, 2 January 2025)
- ML19318A070 + (02:08:03, 2 January 2025)
- ML19318A071 + (02:08:03, 2 January 2025)
- IR 05000483/1980011 + (02:08:05, 2 January 2025)
- ML19318A068 + (02:08:07, 2 January 2025)
- ML19318A066 + (02:08:08, 2 January 2025)
- ML19318A064 + (02:08:10, 2 January 2025)
- ML19318A065 + (02:08:10, 2 January 2025)
- ML19318A063 + (02:08:12, 2 January 2025)
- ML19318A062 + (02:08:12, 2 January 2025)
- ML19318A059 + (02:08:13, 2 January 2025)
- ML19318A058 + (02:08:20, 2 January 2025)
- IR 05000328/1980009 + (02:08:21, 2 January 2025)
- ML19318A055 + (02:08:23, 2 January 2025)
- ML19318A054 + (02:08:24, 2 January 2025)
- ML19318A052 + (02:08:25, 2 January 2025)
- ML19318A051 + (02:08:26, 2 January 2025)
- IR 05000416/1980009 + (02:08:27, 2 January 2025)
- ML19318A049 + (02:08:28, 2 January 2025)
- ML19318A046 + (02:08:32, 2 January 2025)
- ML19318A044 + (02:08:33, 2 January 2025)
- ML19318A042 + (02:08:33, 2 January 2025)
- ML19318A041 + (02:08:35, 2 January 2025)