Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20042A664 + (23:46:38, 19 December 2024)
- ML20042A665 + (23:46:38, 19 December 2024)
- ML20042A662 + (23:46:39, 19 December 2024)
- 05000245/LER-1982-005, Forwards LER 82-005/01T-0.Detailed Event Analysis Encl + (23:46:41, 19 December 2024)
- 05000335/LER-1982-006, Forwards LER 82-006/03L-0 + (23:46:43, 19 December 2024)
- ML20042A657 + (23:46:44, 19 December 2024)
- ML20042A654 + (23:46:46, 19 December 2024)
- ML20042A653 + (23:46:46, 19 December 2024)
- PLA-1028, Final Deficiency Rept Re Improper Orientation of Back Draft Isolation Dampers,Initially Reported 810603.Improperly Oriented Dampers Identified & Orientation Corrected.Unit 1 Work Completed.Unit 2 Pending.Also Reported Per Part 21 + (23:46:47, 19 December 2024)
- ML20042A652 + (23:46:47, 19 December 2024)
- ML20042A649 + (23:46:54, 19 December 2024)
- ML20042A648 + (23:46:55, 19 December 2024)
- ML20042A647 + (23:46:56, 19 December 2024)
- IR 05000382/1981031 + (23:46:57, 19 December 2024)
- 05000318/LER-1982-004-03, /03L-0:on 820211,steam Generator 22 Pressure Indication on Remote Shutdown Monitoring Instrumentation Panel Read High.Caused by Large MSIV Packing Leak.Msiv Repaired & Transmitter Recalibr & Returned to Svc on 820223 + (23:47:01, 19 December 2024)
- ML20042A641 + (23:47:02, 19 December 2024)
- 05000259/LER-1981-078-03, During Refueling Outage, Continuous Air Monitor 1-RM-90-250 Declared Inoperable for 12 1/2-h.Only Four of Seven Required Hourly Samples Taken & Sampled.Caused by Personnel Error + (23:47:03, 19 December 2024)
- ML20042A637 + (23:47:07, 19 December 2024)
- ML20042A636 + (23:47:08, 19 December 2024)
- IR 05000313/1982002 + (23:47:10, 19 December 2024)
- ML20042A634 + (23:47:11, 19 December 2024)
- 05000254/LER-1981-020-03, /03L-2:on 811121,leak Discovered in Underground Supply Line 1-1005A-16-inch Between RHR Sys Svc Water Pumps a & B & Heat Exchanger A.Caused by Pipe Pierced 38 Ft West of HPCI Room.Line Capped Between Room & Vault + (23:47:12, 19 December 2024)
- PLA-1027, Final Deficiency Rept Re Violation of Separation/Isolation Criteria for Class IE Electrical Equipment.Procedure FP-E-10 & Drawings E-396 & E-60 Developed to Reflect Current SAR Commitments.Also Reported Per 10CFR21 + (23:47:13, 19 December 2024)
- 05000259/LER-1981-078, Forwards Updated LER 81-078/03X-1 + (23:47:15, 19 December 2024)
- ML20042A629 + (23:47:17, 19 December 2024)
- 05000219/LER-1982-011-03, /03L-0:on 820208,three Hydraulic Snubbers Were Inoperable & Accelerated Surveillance of Tech Spec 4.5.0.3 Was Not Performed.Caused by Component Failure.Snubbers Replaced W/Certified Operable Snubbers + (23:47:18, 19 December 2024)
- ML20042A627 + (23:47:19, 19 December 2024)
- 05000254/LER-1981-020, Forwards LER 81-020/03L-2 + (23:47:21, 19 December 2024)
- ML20042A624 + (23:47:22, 19 December 2024)
- ML20042A623 + (23:47:23, 19 December 2024)
- ML20042A622 + (23:47:23, 19 December 2024)
- 05000219/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Encl + (23:47:25, 19 December 2024)
- 05000325/LER-1982-018-03, /03L-0:on 820211,post-accident Drywell Particulate Radiation Detection Instruments 1-CAC-AQH-1261-1 & 1262-1 Indicated Downscale,Rendering Channels Inoperable.Caused by Failure of Photomultiplier Tube & Broken Amplifier Lead + (23:47:26, 19 December 2024)
- ML20042A618 + (23:47:27, 19 December 2024)
- ML20042A616 + (23:47:29, 19 December 2024)
- 2CAN038205, Application for Amend to License NPF-6,requesting Tech Spec Change Per NRC Re Containment Purge Valve Testing.W/Class III Fee + (23:47:30, 19 December 2024)
- ML20042A615 + (23:47:30, 19 December 2024)
- 05000325/LER-1982-018, Forwards LER 82-018/03L-0 + (23:47:33, 19 December 2024)
- ML20042A609 + (23:47:34, 19 December 2024)
- IR 05000298/1981025 + (23:47:38, 19 December 2024)
- ML20042A605 + (23:47:39, 19 December 2024)
- ML20042A604 + (23:47:40, 19 December 2024)
- 05000271/LER-1982-003-01, /01T-0:on 820208,sample of Standby Liquid Control Boron Concentration Below Tech Spec Limits.Investigation in Progress.Administrated Limit & Sampling Frequency Increased + (23:47:42, 19 December 2024)
- ML20042A602 + (23:47:43, 19 December 2024)
- ML20042A599 + (23:47:45, 19 December 2024)
- ML20042A601 + (23:47:45, 19 December 2024)
- ML20042A598 + (23:47:46, 19 December 2024)
- 05000271/LER-1982-003, Forwards LER 82-003/01T-0 + (23:47:47, 19 December 2024)
- 05000369/LER-1982-016-03, /03L-0:on 820211,discovered Pivot Pin Missing from safety-related Hanger Located in Centrifugal Charging Pump 1B Room Supporting Pump 4-inch Discharge Line Rendering Hanger Inoperable.Cause Undetermined.New Pin Installed + (23:47:51, 19 December 2024)
- 05000237/LER-1982-007-03, /03L-0:on 820213,during Routine Surveillance of Reactor Level Switch LIS 2-263-58B,setpoint Found to Be Above Tech Spec Limit.Caused by Instrument Setpoint Drift. Switch Adjusted + (23:47:53, 19 December 2024)
- ML20042A593 + (23:47:54, 19 December 2024)