Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000373/1990006 + (21:31:13, 19 December 2024)
- 05000440/LER-1990-008, :on 900420,unexpected Isolation of RWCU Sys Occurred.Caused by Component Failure.Faulty Transmitter Transmitter Identified & Replaced + (21:31:15, 19 December 2024)
- ML20043A843 + (21:31:19, 19 December 2024)
- ML20043A841 + (21:31:20, 19 December 2024)
- ML20043A840 + (21:31:22, 19 December 2024)
- ML20043A839 + (21:31:23, 19 December 2024)
- 0CAN059003, Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance Requirements + (21:31:25, 19 December 2024)
- ML20043A838 + (21:31:25, 19 December 2024)
- ML20043A835 + (21:31:27, 19 December 2024)
- ML20043A834 + (21:31:28, 19 December 2024)
- B13527, Provides Updates to plant-specific Nuclear Training Manuals, Per Commitment.W/O Encls + (21:31:29, 19 December 2024)
- IR 05000254/1990006 + (21:31:39, 19 December 2024)
- ML20043A831 + (21:31:41, 19 December 2024)
- ML20043A830 + (21:31:44, 19 December 2024)
- ML20043A829 + (21:31:45, 19 December 2024)
- ML20043A826 + (21:31:46, 19 December 2024)
- ML20043A827 + (21:31:46, 19 December 2024)
- ML20043A825 + (21:31:47, 19 December 2024)
- ML20043A822 + (21:31:48, 19 December 2024)
- BECO-90-070, Notifies of Change of Senior Operator Status for Cj Martin, Per 10CFR50.74.CJ Martin Will No Longer Participate in Licensed Operator Requalification Training Program + (21:31:49, 19 December 2024)
- ML20043A818 + (21:31:52, 19 December 2024)
- IR 05000305/1990004 + (21:31:53, 19 December 2024)
- ML20043A814 + (21:31:56, 19 December 2024)
- ML20043A813 + (21:31:57, 19 December 2024)
- ML20043A812 + (21:32:00, 19 December 2024)
- ML20043A811 + (21:32:01, 19 December 2024)
- HL-1082, Forwards Response to NRC Re Violations Noted in Insp Repts 50-321/90-07 & 50-366/90-07.Encl Withheld (Ref 10CFR73.21) + (21:32:02, 19 December 2024)
- ML20043A810 + (21:32:02, 19 December 2024)
- ML20043A807 + (21:32:05, 19 December 2024)
- IR 05000321/1990007 + (21:32:09, 19 December 2024)
- ML20043A804 + (21:32:10, 19 December 2024)
- LIC-90-0437, Advises That Walkdown of safety-related Portions of Plant to Verify Accuracy of Fire Barrier Penetration Drawings & Surveillance Tests Will Be Completed by 900831 + (21:33:28, 19 December 2024)
- ML20043A799 + (21:33:30, 19 December 2024)
- ML20043A796 + (21:33:32, 19 December 2024)
- ML20043A797 + (21:33:32, 19 December 2024)
- ML20043A794 + (21:33:33, 19 December 2024)
- ML20043A791 + (21:33:34, 19 December 2024)
- ML20043A793 + (21:33:34, 19 December 2024)
- ML20043A790 + (21:33:35, 19 December 2024)
- ML20043A788 + (21:33:36, 19 December 2024)
- ML20043A789 + (21:33:36, 19 December 2024)
- 05000317/LER-1990-016, :on 900421,determined That Waste Gas Decay Tank (Wgdt) 13 Discharged Instead of (Wgdt) 11 for Discharge Permit Issued.Caused by Inadequate Communications.Training Performed for Operators Re Event + (21:33:38, 19 December 2024)
- 05000155/LER-1990-002-01, :on 900420,Tech Spec Violation Occurred When Unqualified Technician Assigned to Shift Complement Did Not Have Two of on-the-job Training sign-offs Completed. Procedure Revised Re Coverage Qualification + (21:33:40, 19 December 2024)
- ML20043A785 + (21:33:42, 19 December 2024)
- 05000277/LER-1990-007-02, :on 900412,evaluation Involving Seismic Qualification Performed Due to Postulated Failure of Condensate & Vacuum Pumps During Design Seismic Events. Caused by Design Oversight.Program Updated + (21:33:46, 19 December 2024)
- LIC-90-0420, Advises That Licensee Plans to Replace Valves HCV-247 & HCV-2988 During 1991 Refueling Outage Pending Successful Redesign & Retesting of New Valves by Valcor + (21:33:47, 19 December 2024)
- 05000499/LER-1990-005-01, :on 900414,simultaneous Reactor & Turbine Trip Occurred Due to Failure of Main Turbine Electrohydraulic Control Line.Caused by Fatigue Stress of Weld.Valve Modified to Add anti-swirl Baffles & anti-rotation Pins + (21:33:50, 19 December 2024)
- 05000440/LER-1990-007, :on 900418,ruptured Seal on Outer Door of Upper Containment Airlock Occurred Causing Loss of Containment Integrity.Caused by Inadequate Communications & Equipment Failure.Seal on Outer Door Replaced + (21:33:52, 19 December 2024)
- ML20043A779 + (21:33:53, 19 December 2024)
- ML20043A777 + (21:33:57, 19 December 2024)
- 05000255/LER-1990-007, :on 900418,reanalysis of Main Steam Line Break Identified That Containment Pressure Could Exceed FSAR Values.Caused by Inadequate Design & Personnel Error.Mod Installed to Close Feedwater Valves + (21:33:58, 19 December 2024)