Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ULNRC-05944, Callaway Plant Unit 1 - Foreign Ownership Control or Influence + (02:06:40, 18 September 2018)
- ULNRC-05944, Ameren Corp 10-Q Quarterly Report Pursuant to Sections 13 or 15(d) + (02:06:56, 18 September 2018)
- DCL-12-128, Diablo Canyon, Units 1 & 2, Transmittal of Evacuation Time Estimate Study for Plant Emergency Planning Zone Evacuation Time Estimate + (02:11:12, 18 September 2018)
- L-2012-398, Turkey Point, Units 3 and 4, Transmittal of 10 CFR 50 Appendix E Evacuation Time Estimate Study + (02:12:18, 18 September 2018)
- RA-12-125, Oyster Creek Nuclear Generating Station, Issuance of the Core Operating Limits Report for Reload 23, Cycle Revision 8 + (02:14:13, 18 September 2018)
- CP-201201534, Kld TR-589, Rev. 1, Comanche Peak Nuclear Power Plant Development of Evacuation Time Estimates + (02:17:00, 18 September 2018)
- L-2012-449, St. Lucie, Units 1 and 2 - Transmittal of 10 CFR 50 Appendix E Evacuation Time Estimate Study + (02:17:37, 18 September 2018)
- NL-12-2269, Edwin I. Hatch, Unit 2, Seismic Recommendation 2.3 Walkdown Report in Response to Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident + (02:27:32, 18 September 2018)
- RS-12-220, Three Mile Island, Unit 1 - 10 CFR 50 Appendix E Evacuation Time Estimate Analysis + (02:28:16, 18 September 2018)
- RS-12-217, Oyster Creek Nuclear Generating Station, 10 CFR 50 Appendix E Evacuation Time Estimate Analysis + (02:29:12, 18 September 2018)
- RA-12-004, Oyster Creek, Revised Annual Radioactive Effluent Release Report for 2007 + (02:31:01, 18 September 2018)
- RA-12-004, Oyster Creek - Revised Annual Radioactive Effluent Release Report for 2006 + (02:31:03, 18 September 2018)
- NEI 03-08, Prairie Island, Units 1 and 2, Notification of Deviation from Eprl Steam Generator Management Program Pressurized Water Reactor Steam Generator Examination Guidelines, Revision 7, Section 6.3.3.2 + (02:38:09, 18 September 2018)
- RS-12-218, Peach Bottom Atomic Power Station, Units 1, 2, and 3 - Submittal of 10 CFR 50 Appendix E Evacuation Time Estimate Analysis + (02:39:17, 18 September 2018)
- ULNRC-05938, Callaway Plant Unit 1 - Responses to RAI Set 17 and Amendment 17 to the Callaway LRA + (02:42:04, 18 September 2018)
- TAC:ME5291 + (02:53:44, 18 September 2018)
- 1CAN111201, Engineering Report CALC-ANO1-CS-12-00002, Rev. 0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Pages 1 Through 331 + (02:54:48, 18 September 2018)
- JAFP-12-0134, FitzPatrick - Seismic Walkdown Report, Response to NRC Request for Information Per 10 CFR 50.54 (F) Re the Seismic Aspect of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident + (02:55:16, 18 September 2018)
- RA-12-125, Oyster Creek - Issuance of the Core Operating Limits Report for Reload 23, Cycle 24, Revision 8 + (02:58:49, 18 September 2018)
- ULNRC-05934, Ameren Missouri 180-Day Flooding Walkdown Response to NRC Letter, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(T) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of + (04:23:52, 18 September 2018)
- TAC:MF0049 + (04:28:29, 18 September 2018)
- NG-12-0453, Duane Arnold, Submittal of Core Operating Limits Report for Cycle 24 Operation + (04:28:54, 18 September 2018)
- NRC-12-0067, Fermi 2, Submittal of Revision 18 to the Updated Final Safety Analysis Report, 10 CFR 50.59 Evaluation Summary Report, Commitment Management Report and Revision to the Technical Requirements Manual and the Technical Specifications Bases + (04:39:14, 18 September 2018)
- ULNRC-05923, Responses to RAI Set 13 & 14 and Amendment 14 to the Callaway LRA, ULNRC-05923 (Cover Letter) + (04:48:47, 18 September 2018)
- CP-201201258, Comanche Peak Nuclear Power Plant - Spent Fuel Pool Criticality Analysis + (05:14:33, 18 September 2018)
- JAFP-12-0129, James A. FitzPatrick Nuclear Power Plant, Core Operating Limits Report, Revision 26 (Cycle 21) + (05:14:58, 18 September 2018)
- ULNRC-05915, Callaway. Unit 1 - Responses to RAI Set 9, Amendment 11, and Supplemental Responses to the Callaway LRA + (05:19:51, 18 September 2018)
- NL-12-123, Indian Point Nuclear Generating Units 1, 2 & 3 - Correction to Previous Responses Regarding Unit 1 Buried Piping and Unit 2 Auxiliary Feedwater Pump Room Fire Event + (05:23:47, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 42 to ULNRC-05893 - Terracon 2010. Groundwater Monitoring, Fuel Groundwater Wells. February + (05:42:14, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 39 to ULNRC-05893 - Burns & Mcdonnell (Burns and Mcdonnell Engineering Company) 2008. Phase Ii Hydrogeologic Investigation Report Collector Well Siting Study, Callaway Unit 2. June (Part 1 of 3) + (05:42:41, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 24 to ULNRC-05893 - Callaway 2011 Air Emission Report + (05:42:52, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 23 to ULNRC-05893 - Callaway 2010 Air Emission Report + (05:42:57, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 22 to ULNRC-05893 - Callaway 2009 Air Emission Report + (05:43:00, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 21 to ULNRC-05893 - Callaway 2008 Air Emission Report + (05:43:04, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 9 to ULNRC-05893 - Discharge Monitoring Report - 2nd Quarter 2012 + (05:43:10, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 8 to ULNRC-05893 - Discharge Monitoring Report - 1st Quarter 2012 + (05:43:14, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 7 to ULNRC-05893 - Discharge Monitoring Report - 4th Quarter 2011 + (05:43:16, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 6 to ULNRC-05893 - Discharge Monitoring Report - 3rd Quarter 2011 + (05:43:19, 18 September 2018)
- ULNRC-05893, Callaway, Unit 1, Enclosure 20 to ULNRC-05893 - Callaway 2007 Air Emission Report + (05:43:22, 18 September 2018)
- ULNRC-05908, Callaway, Unit 1, Responses to SAMA RAI Set 1 + (05:47:33, 18 September 2018)
- RS-12-154, LaSalle County Station, Units 1 and 2 - Supplemental Information Related to License Amendment Request to Technical Specification 3.7.3, Ultimate Heat Sink + (05:48:02, 18 September 2018)
- NEI 99-04, Oyster Creek, Commitment Change Summary Report - 2011 + (06:02:12, 18 September 2018)
- ULNRC-05902, Callaway, Unit 1 - Enclosure 1: Responses to Environmental RAI Set 2 + (06:08:11, 18 September 2018)
- ULNRC-05892, Callaway Plant, Unit 1, Responses to RAI Set 5 and Amendment 7 to the Callaway LRA (with Updates to Previous RAI Responses) + (06:18:39, 18 September 2018)
- NL-12-097, Indian Point Unit 3, License Amendment Request for Emergency Diesel Generator Fuel Oil System + (06:21:17, 18 September 2018)
- TAC:ME2164 + (06:27:15, 18 September 2018)
- DCL-12-069, Diablo Canyon, Units 1 and 2 - Submittal of Attachment 1, Quality Assurance Plan and Revised Phase 1 Documents for the License Amendment Request for Digital Process Protection System Replacement and Attachment 8 Affidavit 993754-AFF-38T + (06:33:01, 18 September 2018)
- RC-12-0110, Virgil C. Summer Nuclear Station Unit 1 - Request for Weld Recategorization and Use of Alternatives to ASME Code Inspection Interval for VCSNS Third Ten Year Inservice Inspection (RR-III-08) + (06:54:25, 18 September 2018)
- CP-201200667, CP-2012-06 Post Examination Comments. Transmittal of Licensed Operator Exam Materials by Luminant + (07:04:39, 18 September 2018)
- NL-12-1078, Edwin I. Hatch, Units 1 and 2, License Amendment Request to Revise the Minimum Water Level in the Plant Service Water Pump Well + (07:26:37, 18 September 2018)
- L-2012-248, Turkey Point, Units 3 and 4, License Amendment Request - Cyber Security Plan Implementation Schedule Milestone Change + (07:42:59, 18 September 2018)