Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20050C094 + (14:46:31, 18 December 2024)
- ML20050C093 + (14:46:32, 18 December 2024)
- ML20050C092 + (14:46:36, 18 December 2024)
- ML20050C091 + (14:46:37, 18 December 2024)
- 05000327/LER-1982-027, Forwards LER 82-027/01T-0 + (14:46:38, 18 December 2024)
- ML20050C087 + (14:46:40, 18 December 2024)
- ML20050C086 + (14:46:41, 18 December 2024)
- ML20050C085 + (14:46:41, 18 December 2024)
- L-82-103, Deficiency Rept Re Diesel Generator 2A Fan Belts Jumping & Flapping at Speeds Above 700 Rpm.No Margin Available for Adjustment for Belt Stretch.Evaluation Being Made to Determine Cause & Corrective Actions + (14:46:42, 18 December 2024)
- ML20050C083 + (14:46:44, 18 December 2024)
- 05000247/LER-1982-010-01, /01T-0:on 820310,determined That Existing Operating Procedures Required Necessary Safeguards Equipment to Be Operable Prior to Bringing Reactor Critical But Did Not Establish Specific Requirements in Hot Shutdown + (14:46:45, 18 December 2024)
- ML20050C080 + (14:46:46, 18 December 2024)
- ML20050C079 + (14:46:48, 18 December 2024)
- ML20050C078 + (14:46:49, 18 December 2024)
- 05000247/LER-1982-010, Forwards LER 82-010/01T-0 + (14:46:51, 18 December 2024)
- 05000327/LER-1982-024-03, /03L-0:on 820218,turbine Bldg Sump & Condensate Demineralizer Radioactive Effluent Line Monitors Declared Inoperable.Caused by Crud & Debris Buildup on Flow Switch. Switches Cleaned + (14:46:52, 18 December 2024)
- ML20050C072 + (14:46:55, 18 December 2024)
- 05000327/LER-1982-024, Forwards LER 82-024/03L-0 + (14:46:57, 18 December 2024)
- ML20050C069 + (14:46:58, 18 December 2024)
- ML20050C068 + (14:47:01, 18 December 2024)
- 05000302/LER-1982-011-03, /03L-0:on 820224,during Performance of SP-112,RC Flow,Channel a Was Found Out of Calibr.Caused by Linear Voltage Differential Transformer Shorting Out.Transformer Replaced & Instrument Calibr + (14:47:03, 18 December 2024)
- 05000302/LER-1982-011, Forwards LER 82-011/03L-0 + (14:47:05, 18 December 2024)
- 05000369/LER-1982-015-01, /01T-0:on 820212,both Centrifugal Charging Pumps (CCP) Declared Inoperable When Hydrogen from Reciprocating Charging Pump Suction Dampeners Entered CCP Suction,Causing Cavitation + (14:47:07, 18 December 2024)
- B10479, Forwards Revision 2 to Safeguards Contingency Plan.Revision Withheld (Ref 10CFR2.790) + (14:47:08, 18 December 2024)
- ML20050C056 + (14:47:15, 18 December 2024)
- 05000369/LER-1982-015, Forwards LER 82-015/01T-0.Detailed Event Analysis Encl + (14:47:16, 18 December 2024)
- 05000325/LER-1982-033-03, /03L-0:on 820222,while Performing Recirculation Pump Trip,Sys Low Water 2 Channel Calibr test,1B Pump Tripped.Caused by Inadvertent Actuation of Instrument 1-B21-LTM-N025B-2.Personnel Counseled + (14:47:18, 18 December 2024)
- ML20050C051 + (14:47:20, 18 December 2024)
- 05000324/LER-1982-042-03, /03L-0:on 820227,suppression Chamber Water Temp Recorder 2-CAC-TR-778,on Remote Shutdown Panel,Found to Be Showing Normal Temp Indications But Was Not Recording on Chart Recorder + (14:47:22, 18 December 2024)
- ML20050C049 + (14:47:24, 18 December 2024)
- 05000325/LER-1982-033, Forwards LER 82-033/03L-0 + (14:47:25, 18 December 2024)
- 05000324/LER-1982-042, Forwards LER 82-042/03L-0 + (14:47:27, 18 December 2024)
- ML20050C043 + (14:47:28, 18 December 2024)
- ML20050C042 + (14:47:29, 18 December 2024)
- 05000324/LER-1982-050-03, /03L-0:on 820227,discovered New Procedure to Obtain Reactor Coolant Samples While Normal RWCU Sampling Sys Inoperable Was Implemented W/O Plant Nuclear Safety Committee & General Manager Review & Approval + (14:47:38, 18 December 2024)
- ML20050C039 + (14:47:43, 18 December 2024)
- 05000324/LER-1982-050, Forwards LER 82-050/03L-0 + (14:47:44, 18 December 2024)
- ML20050C035 + (14:47:46, 18 December 2024)
- 05000338/LER-1982-012-03, /03L-0:on 820223,emergency Condensate Storage Tank (Ecst) Dropped Below Min Required Vol Twice.Caused by Adding Water from Ecst to Steam Generators Due to Inoperable Condensate Sys + (14:47:47, 18 December 2024)
- 05000338/LER-1982-012, Forwards LER 82-012/03L-0 + (14:48:58, 18 December 2024)
- 05000335/LER-1982-008-03, /03L-0:on 820226,during Surveillance Testing, MV1403 (Block Valve for Power Operated Relief Valve) Would Not Shut.Cause Will Be Investigated During Next Shutdown + (14:48:59, 18 December 2024)
- ML20050C029 + (14:49:01, 18 December 2024)
- ML20050C028 + (14:49:03, 18 December 2024)
- ML20050C027 + (14:49:04, 18 December 2024)
- ML20050C025 + (14:49:06, 18 December 2024)
- 05000335/LER-1982-008, Forwards LER 82-008/03L-0 + (14:49:07, 18 December 2024)
- ML20050C021 + (14:49:09, 18 December 2024)
- IR 05000003/1976012 + (14:49:34, 18 December 2024)
- ML20050C019 + (14:49:37, 18 December 2024)
- ML20050C017 + (14:49:38, 18 December 2024)
- ML20050C016 + (14:49:39, 18 December 2024)