Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20053F017 + (00:24:37, 18 December 2024)
- ML20053F016 + (00:24:39, 18 December 2024)
- ML20053F013 + (00:24:43, 18 December 2024)
- ML20053F012 + (00:24:47, 18 December 2024)
- ML20053F010 + (00:24:50, 18 December 2024)
- ML20053F009 + (00:24:51, 18 December 2024)
- A02368, Forwards Addl Info Requested by NRC 820316 & 19 Ltrs Re TMI Action Item II.B.1, RCS Vents + (00:24:52, 18 December 2024)
- PNO-III-82-052, on 820602,C Inboard MSIV Would Not Intake Reactor Protection Sys Trip at 10% Closure.On 820603,C Switch Speed Controller Unit Allen Screw Found Sheared Off & 1/16-inch Crack Discovered in Valve.Msiv Could Not Reopen + (00:24:55, 18 December 2024)
- ML20053F006 + (00:24:57, 18 December 2024)
- ML20053F005 + (00:24:58, 18 December 2024)
- ML20053F002 + (00:25:02, 18 December 2024)
- ML20053F003 + (00:25:02, 18 December 2024)
- ML20053E996 + (00:25:08, 18 December 2024)
- ML20053E995 + (00:25:09, 18 December 2024)
- ML20053E994 + (00:25:10, 18 December 2024)
- ML20053E992 + (00:25:11, 18 December 2024)
- ML20053E991 + (00:25:11, 18 December 2024)
- ML20053E990 + (00:25:12, 18 December 2024)
- ML20053E989 + (00:25:13, 18 December 2024)
- 05000272/LER-1982-033, Forwards LER 82-033/03L-0.Detailed Event Analysis Encl + (00:25:20, 18 December 2024)
- 05000409/LER-1982-011-01, /01T-0:on 820523,while Performing Leak Tests on High Pressure Svc Water Containment Isolation Valve & Electrical Penetration Unit 5,leak Flow Rate Found Exceeding Tech Spec Limit.Caused by Hardening of Epoxy Sealant + (00:25:23, 18 December 2024)
- 05000409/LER-1982-010-01, /01T-0:on 820521,while Performing Type C Leak Tests on Containment Bldg Heating Steam Condensate Return Isolation Valve,Leakage Flow Rate Found Exceeding Tech Spec Limit.Cause Not Stated.Valve Internals Replaced + (00:25:28, 18 December 2024)
- 05000361/LER-1982-017, Forwards LER 82-017/01T-0.Detailed Event Analysis Submitted + (00:25:29, 18 December 2024)
- 05000315/LER-1982-033-03, /03L-0:on 820510,operator on Tour Discovered That Fire Door 226 Would Not Fully Close.Caused by Insufficient Closure Mechanism Against Flow of Thermostatically Controlled Ventilation Supply Fan.Addl Mechanism Added + (00:25:32, 18 December 2024)
- 05000315/LER-1982-032-03, /03L-0:on 820518,fire Hose Station 33 Near Emergency Diesel Generator Rooms Access Removed from Svc to Replace Leaking Drain Valve.Seat Leakage Caused by Normal Wear.Drain Valve Replaced + (00:25:35, 18 December 2024)
- 05000409/LER-1982-009-01, /01T-0:on 820520,while Performing Type C Leak Tests on Retention Tank Pump Discharge Valve,Leakage Flow Rate Found Exceeding Tech Spec Limit.Cause Not Stated. Valve Relapped & Restroked + (00:25:37, 18 December 2024)
- ML20053E977 + (00:25:38, 18 December 2024)
- 05000315/LER-1982-031-03, /03L-0:on 820510,operator on Tour Discovered That Fire Door 227 Would Not Latch.Caused by Slight Misalignment Between Latch & Latch Plate.Latch Plate Adjusted & Door Operated Satisfactorily + (00:25:40, 18 December 2024)
- ML20053E975 + (00:25:41, 18 December 2024)
- ML20053E973 + (00:25:42, 18 December 2024)
- ML20053E972 + (00:25:43, 18 December 2024)
- ML20053E969 + (00:25:49, 18 December 2024)
- ML20053E967 + (00:25:50, 18 December 2024)
- 05000311/LER-1982-038, Forwards LER 82-038/03L-0.Detailed Event Analysis Encl + (00:25:57, 18 December 2024)
- 05000306/LER-1982-009, Forwards LER 82-009/03L-0 + (00:25:59, 18 December 2024)
- ML20053E959 + (00:26:02, 18 December 2024)
- ML20053E958 + (00:26:03, 18 December 2024)
- ML20053E956 + (00:26:07, 18 December 2024)
- IR 05000331/1982006 + (00:26:08, 18 December 2024)
- ML20053E952 + (00:26:11, 18 December 2024)
- ML20053E953 + (00:26:11, 18 December 2024)
- ML20053E950 + (00:26:12, 18 December 2024)
- ML20053E949 + (00:26:13, 18 December 2024)
- 05000272/LER-1982-031, Forwards LER 82-031/03L-0.Detailed Event Analysis Encl + (00:26:33, 18 December 2024)
- ML20053E944 + (00:26:33, 18 December 2024)
- PNO-I-82-041, on 820604,FEMA Announced Issuance of post- Exercise Assessment of 820303 Exercise.Major Areas of Concern:Inaudible Sirens.Effectiveness of Existing Radiological Public Program Should Be Strengthened + (00:26:35, 18 December 2024)
- ML20053E942 + (00:26:36, 18 December 2024)
- ML20053E940 + (00:26:39, 18 December 2024)
- ML20053E938 + (00:26:40, 18 December 2024)
- ML20053E936 + (00:26:41, 18 December 2024)
- AECM-82-257, Advises of Status of Mods to Balance of Plant & NSSS Equipment for Full Seismic Qualification Review Team Qualification Prior to Fuel Load,Per Equipment Qualification Branch 810728-30 Site Audit.Bechtel 820414 & 0510 Ltrs Encl + (00:26:48, 18 December 2024)