Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20054D232 + (23:39:44, 17 December 2024)
- ML20054D231 + (23:39:45, 17 December 2024)
- ML20054D230 + (23:39:46, 17 December 2024)
- ML20054D229 + (23:39:47, 17 December 2024)
- IR 05000546/1982002 + (23:39:48, 17 December 2024)
- IR 05000483/1982002 + (23:39:50, 17 December 2024)
- ML20054D225 + (23:39:52, 17 December 2024)
- ML20054D223 + (23:39:53, 17 December 2024)
- ML20054D222 + (23:39:54, 17 December 2024)
- ML20054D220 + (23:39:55, 17 December 2024)
- ML20054D218 + (23:39:58, 17 December 2024)
- ML20054D217 + (23:39:59, 17 December 2024)
- PNO-III-82-038A, addl Insp of Steam Generator 1 Determined That Auxiliary Feedwater Ring Head Separated from Nozzle & Brackets Damaged or Missing.Steam Generator 2 Ring Header to Be Inspected 820417-18 + (23:40:01, 17 December 2024)
- PNO-III-82-043, on 820416,therapy Misadministration Resulting in Dose of 12,000 Rads to Patient Uterus During Treatment Period 820409-12 Discovered.Caused by Wrong Activity Source in Applicator.Special Insp Being Conducted + (23:40:03, 17 December 2024)
- ML20054D214 + (23:40:05, 17 December 2024)
- ML20054D213 + (23:40:08, 17 December 2024)
- IR 05000346/1982011 + (23:40:10, 17 December 2024)
- ML20054D211 + (23:40:11, 17 December 2024)
- ML20054D209 + (23:40:15, 17 December 2024)
- ML20054D207 + (23:40:16, 17 December 2024)
- ML20054D203 + (23:40:19, 17 December 2024)
- ML20054D201 + (23:40:19, 17 December 2024)
- ML20054D200 + (23:40:21, 17 December 2024)
- 05000206/LER-1982-011-03, /03L-0:during Power Operations from 811215 Until Plant Entered Mode 5 on 820228,surveillance Tests Table 4.1.4-1(a) & Section 4.1.6.A.1(a) Were Not Performed.Caused by Insufficient Communication & Coordination Between Depts + (23:40:26, 17 December 2024)
- ML20054D197 + (23:40:27, 17 December 2024)
- 05000206/LER-1982-011, Forwards LER 82-011/03L-0.Detailed Event Analysis Submitted + (23:40:32, 17 December 2024)
- ML20054D192 + (23:40:34, 17 December 2024)
- ML20054D193 + (23:40:34, 17 December 2024)
- ML20054D191 + (23:40:35, 17 December 2024)
- IR 05000266/1982005 + (23:40:36, 17 December 2024)
- A02163, Submits Comments Re Draft Evaluation of SEP Topic VI-4, Containment Isolation + (23:40:38, 17 December 2024)
- ML20054D187 + (23:40:42, 17 December 2024)
- ML20054D186 + (23:40:43, 17 December 2024)
- PNO-III-82-041, on 820416,cracking Identified in 50 of 142 Blades in Eleventh Stage of Low Pressure Turbine A.Nine Blades Seriously Cracked.Both a & B Low Pressure Turbines Will Be Inspected Fully + (23:40:45, 17 December 2024)
- ML20054D183 + (23:40:46, 17 December 2024)
- A02302, Comments on Draft Evaluation of SEP Topic VI-7.A.3, ECCS Actuation Sys + (23:40:47, 17 December 2024)
- ML20054D181 + (23:40:48, 17 December 2024)
- ML20054D180 + (23:40:49, 17 December 2024)
- ML20054D179 + (23:40:50, 17 December 2024)
- ML20054D178 + (23:40:51, 17 December 2024)
- ML20054D175 + (23:40:56, 17 December 2024)
- ML20054D172 + (23:41:01, 17 December 2024)
- 05000237/LER-1982-009, Forwards LER 82-009/03L-0 + (23:41:03, 17 December 2024)
- ML20054D165 + (23:41:15, 17 December 2024)
- 05000315/LER-1982-017, Forwards LER 82-017/03L-0 + (23:41:32, 17 December 2024)
- ML20054D157 + (23:41:34, 17 December 2024)
- ML20054D151 + (23:41:37, 17 December 2024)
- AECM-82-173, Forwards Addl Info Requested by Equipment Qualification Branch Re Justification for Interim Operation for Equipment Not Qualified to Seismic Qualification Review Team Criteria + (23:41:38, 17 December 2024)
- ML20054D149 + (23:41:41, 17 December 2024)
- ML20054D146 + (23:41:43, 17 December 2024)
- ML20054D144 + (23:41:44, 17 December 2024)