Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20054G807 + (22:47:05, 17 December 2024)
- ML20054G806 + (22:47:06, 17 December 2024)
- IR 05000280/1982015 + (22:47:07, 17 December 2024)
- ML20054G803 + (22:47:07, 17 December 2024)
- ML20054G800 + (22:47:08, 17 December 2024)
- IR 05000335/1982016 + (22:47:12, 17 December 2024)
- IR 05000293/1982015 + (22:47:17, 17 December 2024)
- ML20054G795 + (22:47:17, 17 December 2024)
- ML20054G793 + (22:47:18, 17 December 2024)
- ML20054G792 + (22:47:18, 17 December 2024)
- AECM-82-222, Amends 820421 Response to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. All Mechanical Snubbers Installed on safety-related Sys Visually Examined for Damage & Tested for Freedom of Movement by Manually Testing Stroke + (22:47:19, 17 December 2024)
- ML20054G790 + (22:47:19, 17 December 2024)
- PNO-IV-82-025, on 820614,indicators in Welds & in Adjacent Heat Affected Zones in RWCU Sys Inlet Piping Identified. Affected Piping Will Be Replaced + (22:47:23, 17 December 2024)
- 05000409/LER-1982-007-03, /03L-0:on 820515,during Refueling Outage,Buses 1A & 1B Were Supplied by 1A & 1B Emergency Diesel Generators for 12 Minutes.Caused by Undervoltage Relay Breaker Opened During Troubleshooting of Dc Ground + (22:47:25, 17 December 2024)
- 05000373/LER-1982-032, Forwards LER 82-032/03L-0.Detailed Event Analysis Encl + (22:47:30, 17 December 2024)
- 05000267/LER-1982-020, Forwards LER 82-020/03L-0.Detailed Event Analysis Encl + (22:47:32, 17 December 2024)
- 05000267/LER-1982-021-03, /03L-0:on 820517,plant Protective Sys Circulator Speed Module Found Reading Too Low.Caused by Loose Speed Switch Module Pin Connector,Which Made Poor Connection. Connector Reseated & Tightened in Place + (22:47:35, 17 December 2024)
- ML20054G773 + (22:47:36, 17 December 2024)
- 05000409/LER-1982-007, Forwards LER 82-007/03L-0.Detailed Event Analysis Submitted + (22:47:37, 17 December 2024)
- 05000331/LER-1982-034, Forwards LER 82-034/01T-0 + (22:47:38, 17 December 2024)
- ML20054G769 + (22:47:38, 17 December 2024)
- ML20054G764 + (22:47:40, 17 December 2024)
- ML20054G763 + (22:47:41, 17 December 2024)
- ML20054G761 + (22:47:45, 17 December 2024)
- ML20054G760 + (22:47:45, 17 December 2024)
- 05000313/LER-1982-010, Forwards LER 82-010/03L-0 + (22:47:46, 17 December 2024)
- ML20054G754 + (22:47:48, 17 December 2024)
- IR 05000334/1982011 + (22:47:49, 17 December 2024)
- ML20054G752 + (22:47:50, 17 December 2024)
- IR 05000320/1982003 + (22:48:52, 17 December 2024)
- ML20054G750 + (22:48:53, 17 December 2024)
- ML20054G747 + (22:48:53, 17 December 2024)
- ML20054G745 + (22:48:54, 17 December 2024)
- IR 05000424/1982009 + (22:48:55, 17 December 2024)
- ML20054G740 + (22:48:56, 17 December 2024)
- IR 05000424/1982005 + (22:48:57, 17 December 2024)
- IR 05000324/1982009 + (22:48:59, 17 December 2024)
- ML20054G733 + (22:49:00, 17 December 2024)
- ML20054G731 + (22:49:00, 17 December 2024)
- ML20054G728 + (22:49:01, 17 December 2024)
- ML20054G729 + (22:49:01, 17 December 2024)
- ML20054G726 + (22:49:02, 17 December 2024)
- ML20054G722 + (22:49:03, 17 December 2024)
- ML20054G725 + (22:49:03, 17 December 2024)
- ML20054G720 + (22:49:08, 17 December 2024)
- ML20054G718 + (22:49:09, 17 December 2024)
- BSEP-82-1068, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-09 & 50-325/82-09.Corrective Actions: Rotameter Float Installed Correctly & Drawing Posted Showing Correct Point to Read Flow Level + (22:49:10, 17 December 2024)
- ML20054G716 + (22:49:10, 17 December 2024)
- 05000305/LER-1982-014, Forwards LER 82-014/03L-0 + (22:49:11, 17 December 2024)
- IR 05000315/1982009 + (22:49:16, 17 December 2024)
- ML20054G712 + (22:49:16, 17 December 2024)