Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000327/LER-1982-075, Forwards LER 82-075/03L-0 + (20:43:35, 17 December 2024)
- 05000335/LER-1982-025, Forwards LER 82-025/03L-0 + (20:43:43, 17 December 2024)
- 05000338/LER-1982-044, Forwards LER 82-044/03L-0 + (20:43:45, 17 December 2024)
- ML20055B793 + (20:43:47, 17 December 2024)
- 05000339/LER-1982-027, Forwards LER 82-027/03L-0 + (20:43:54, 17 December 2024)
- 05000339/LER-1982-036, Forwards LER 82-036/03L-0 + (20:44:05, 17 December 2024)
- 05000260/LER-1982-019, Forwards LER 82-019/03L-0 + (20:44:10, 17 December 2024)
- ML20055B772 + (20:44:17, 17 December 2024)
- ML20055B773 + (20:44:17, 17 December 2024)
- ML20055B770 + (20:44:19, 17 December 2024)
- IR 05000285/1982011 + (20:44:20, 17 December 2024)
- L-82-284, Final Deficiency Rept Re Steam Generator 2A 1-inch Nozzles, Initially Reported 820217.Deficiency Not Considered Reportable Per 10CFR50.55e + (20:44:20, 17 December 2024)
- ML20055B766 + (20:44:21, 17 December 2024)
- ML20055B762 + (20:44:24, 17 December 2024)
- ML20055B761 + (20:44:25, 17 December 2024)
- ML20055B758 + (20:44:27, 17 December 2024)
- ML20055B756 + (20:44:28, 17 December 2024)
- ML20055B757 + (20:44:28, 17 December 2024)
- ML20055B754 + (20:44:29, 17 December 2024)
- ML20055B753 + (20:44:29, 17 December 2024)
- ML20055B751 + (20:44:30, 17 December 2024)
- ML20055B750 + (20:44:30, 17 December 2024)
- ML20055B746 + (20:44:31, 17 December 2024)
- ML20055B748 + (20:44:31, 17 December 2024)
- ML20055B743 + (20:44:39, 17 December 2024)
- 05000267/LER-1982-026, Forwards LER 82-026/03L-0.Detailed Event Analysis Encl + (20:44:40, 17 December 2024)
- 05000280/LER-1982-071-03, /03L-0:on 820618,motor Operated valve-1536 Pressure Power Operated Relief Block Valve Was Cycled Open But Failed to Close Fully,Remotely or Manually.Cause Undetermined.Valve Closed Electrically + (20:44:45, 17 December 2024)
- 05000280/LER-1982-073-03, /03L-0:on 820622,charging Pump Svc Water Pump 1-SW-P-10B Failed to Develop Adequate Discharge Pressure. Caused by Insufficient Npsh.Svc Water to Chillers Throttled to Provide Sufficient NPSH + (20:44:47, 17 December 2024)
- ML20055B735 + (20:44:51, 17 December 2024)
- ML20055B733 + (20:44:51, 17 December 2024)
- 05000369/LER-1982-053, Forwards LER 82-053/03L-0.Detailed Event Analysis Encl + (20:44:52, 17 December 2024)
- ML20055B729 + (20:44:54, 17 December 2024)
- ML20055B730 + (20:44:54, 17 December 2024)
- IR 05000312/1982026 + (20:44:56, 17 December 2024)
- ML20055B727 + (20:44:56, 17 December 2024)
- ML20055B726 + (20:45:00, 17 December 2024)
- ML20055B725 + (20:45:01, 17 December 2024)
- ML20055B718 + (20:45:10, 17 December 2024)
- ML20055B717 + (20:45:10, 17 December 2024)
- 05000325/LER-1982-064, Forwards LER 82-064/03L-0 + (20:45:11, 17 December 2024)
- ML20055B713 + (20:45:13, 17 December 2024)
- ML20055B714 + (20:45:13, 17 December 2024)
- ML20055B709 + (20:45:15, 17 December 2024)
- RBG-13-032, Interim Deficiency Rept Re Installation of Nonseismic Pipe Supports Over Category I Components in Control Bldg, Initially Reported on 820615.Investigation Continuing. Next Rept Will Be Submitted by 820902 + (20:45:15, 17 December 2024)
- ML20055B706 + (20:45:17, 17 December 2024)
- ML20055B704 + (20:45:18, 17 December 2024)
- ML20055B703 + (20:45:18, 17 December 2024)
- ML20055B697 + (20:45:19, 17 December 2024)
- ML20055B700 + (20:45:19, 17 December 2024)
- ML20055B694 + (20:45:20, 17 December 2024)
- ML20055B691 + (20:45:22, 17 December 2024)