Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BECO-90-135, Proposed Tech Specs,Deleting Ref to Improved BWR Tech Specs & Withdrawing Requests for Changes to Reactor Water Level Safety Limit,Incorporation of Generic Ltr 90-02 Recommendations & Changes Re APRM Gain + (04:38:02, 17 December 2024)
- ML20062E851 + (04:38:03, 17 December 2024)
- ML20062E850 + (04:38:04, 17 December 2024)
- ML20062E847 + (04:38:04, 17 December 2024)
- 05000277/LER-1990-029, :on 901016,E4 Diesel Generator Not Tested While RHR Loop a Inoperable + (04:38:06, 17 December 2024)
- ML20062E845 + (04:38:07, 17 December 2024)
- ML20062E844 + (04:38:07, 17 December 2024)
- ML20062E843 + (04:38:08, 17 December 2024)
- ML20062E839 + (04:38:09, 17 December 2024)
- ML20062E841 + (04:38:09, 17 December 2024)
- 05000373/LER-1982-057-03, /03L-0:on 820708,while in Mode 4 Cold Shutdown, RHR Svc Water Pump Found Cycling on & Off.Caused by Thermal Overload Due to Motor Being Rewired at 230-volt Configuration Instead of 110-volt.Motor Rewired + (04:38:11, 17 December 2024)
- ML20062E836 + (04:38:12, 17 December 2024)
- ML20062E835 + (04:38:13, 17 December 2024)
- ML20062E834 + (04:38:14, 17 December 2024)
- ML20062E832 + (04:38:15, 17 December 2024)
- ML20062E833 + (04:38:15, 17 December 2024)
- ML20062E827 + (04:38:23, 17 December 2024)
- ML20062E826 + (04:38:23, 17 December 2024)
- ML20062E822 + (04:38:30, 17 December 2024)
- ML20062E821 + (04:38:31, 17 December 2024)
- ML20062E815 + (04:38:35, 17 December 2024)
- ML20062E813 + (04:38:36, 17 December 2024)
- ML20062E812 + (04:38:37, 17 December 2024)
- ML20062E809 + (04:38:43, 17 December 2024)
- ML20062E805 + (04:38:44, 17 December 2024)
- 05000373/LER-1982-057, Forwards LER 82-057/03L-0.Detailed Event Analysis Encl + (04:38:45, 17 December 2024)
- ML20062E799 + (04:38:46, 17 December 2024)
- ML20062E797 + (04:38:46, 17 December 2024)
- ML20062E796 + (04:38:47, 17 December 2024)
- ML20062E793 + (04:38:54, 17 December 2024)
- ML20062E791 + (04:38:55, 17 December 2024)
- ML20062E790 + (04:38:56, 17 December 2024)
- ML20062E788 + (04:38:57, 17 December 2024)
- ML20062E789 + (04:38:57, 17 December 2024)
- ML20062E785 + (04:38:58, 17 December 2024)
- ML20062E781 + (04:38:59, 17 December 2024)
- ML20062E780 + (04:39:00, 17 December 2024)
- ML20062E778 + (04:39:01, 17 December 2024)
- ML20062E777 + (04:39:01, 17 December 2024)
- ML20062E775 + (04:39:02, 17 December 2024)
- ML20062E773 + (04:39:03, 17 December 2024)
- ML20062E774 + (04:39:03, 17 December 2024)
- ML20062E770 + (04:39:04, 17 December 2024)
- ML20062E769 + (04:39:05, 17 December 2024)
- ML20062E765 + (04:39:06, 17 December 2024)
- ML20062E766 + (04:39:06, 17 December 2024)
- ML20062E762 + (04:39:07, 17 December 2024)
- IR 05000321/1982022 + (04:39:08, 17 December 2024)
- ML20062E758 + (04:39:08, 17 December 2024)
- PNO-III-82-073, on 820731,unit Shut Down After Tube Leak Rate of 0.17 Gpm Determined in Steam Generator 2.Licensee Estimates Unit Will Be Down for Several Days for Testing & Leak Location Activities + (04:39:09, 17 December 2024)
- ML20062E755 + (04:39:09, 17 December 2024)