Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000259/LER-1982-047, Forwards LER 82-047/03L-0 + (03:02:47, 17 December 2024)
- ML20063D310 + (03:02:47, 17 December 2024)
- ML20063D291 + (03:02:58, 17 December 2024)
- ML20063D287 + (03:02:58, 17 December 2024)
- 05000366/LER-1982-072-03, /03L-0:on 820715,HPCI Turbine Exhaust Discharge Pressure Hi & HPCI Turbine Trip Solenoid Energized Alarms Activated.Caused by Component Failure Due to Fouled Contacts on HPCI Turbine Exhaust Pressure Switch.Switch Cleaned + (03:03:00, 17 December 2024)
- ML20063D281 + (03:03:01, 17 December 2024)
- 05000366/LER-1982-072, Forwards LER 82-072/03L-0 + (03:03:02, 17 December 2024)
- ML20063D264 + (03:03:03, 17 December 2024)
- ML20063D262 + (03:03:03, 17 December 2024)
- ML20063D253 + (03:03:04, 17 December 2024)
- 05000259/LER-1982-049-03, /03L-0:on 820721 & 23,SI 4.1.A-11 (MSIV Closure Functional Test) & SI 4.5.E.1.c (HPCI Motor Operated Valve Operability Test) & SI 4.5.E.1.d & E (HPCI Flow Rate) Not Performed.Caused by Defective Procedure + (03:03:05, 17 December 2024)
- ML20063D209 + (03:03:07, 17 December 2024)
- ML20063D205 + (03:03:08, 17 December 2024)
- ML20063D201 + (03:03:08, 17 December 2024)
- 05000259/LER-1982-049, Forwards LER 82-049/03L-0 + (03:03:09, 17 December 2024)
- ML20063D197 + (03:03:09, 17 December 2024)
- W3P82-1733, Forwards Proprietary & Nonproprietary Versions of Waterford 3,Cycle 1 Cpc/Ceac Phase 1 Software Verification Test Rept & Waterford 3,Cycle 1 Cpc/Ceac Phase II Software Verification Test Rept. Affidavit Encl + (03:03:10, 17 December 2024)
- 05000259/LER-1982-048-03, /03L-0:on 820718,coil for Relay 16A-K37 Failed, Resulting in Partial Primary Containment Isolation.Caused by Burned Out GE Type CR 120A,Model 5000001G002 Coil.Relay Coil Replaced + (03:03:12, 17 December 2024)
- ML20063D190 + (03:03:12, 17 December 2024)
- ML20063D182 + (03:03:17, 17 December 2024)
- 05000280/LER-1982-033-03, /03L-0:on 820530,w/unit at 96% Power,Charging Pump Svc Water Pump 2-SW-P-10B Failed to Develop Sufficient Discharge Pressure.Caused by Insufficient Npsh.Svc Water to Chillers Throttled + (03:03:21, 17 December 2024)
- ML20063D177 + (03:03:22, 17 December 2024)
- ML20063D174 + (03:03:22, 17 December 2024)
- ML20063D167 + (03:03:28, 17 December 2024)
- ML20063D162 + (03:03:29, 17 December 2024)
- 05000259/LER-1982-048, Forwards LER 82-048/03L-0 + (03:03:32, 17 December 2024)
- 05000324/LER-1982-093, Forwards LER 82-093/03L-0 + (03:03:36, 17 December 2024)
- ML20063D145 + (03:03:36, 17 December 2024)
- ML20063D141 + (03:03:37, 17 December 2024)
- 05000296/LER-1982-031-03, /03L-0:on 820716,two Degraded Voltage Relay Timers on 4-kV Sdb 3EC & 3ED Found Set at 0.26-s.Caused by Timer Setpoints Change in 820329 Tech Spec Revision,But Not Incorporated Into SI 4.9.A.4.c.Timers Recalibr + (03:03:39, 17 December 2024)
- 05000325/LER-1982-060-03, /03L-0:on 820528,while Performing Channel Functional Test of HPCI Sys Suction Low Water Level Instrumentation,Cst Instrument 1-E41-LSL-N002 Did Not Actuate within Specs.Caused by Organic Deposit + (03:03:41, 17 December 2024)
- ML20063D132 + (03:03:42, 17 December 2024)
- AECM-82-295, Final Deficiency Rept PRD-82/17 Re GE Type Hma Relays W/Excessive Length of Uninsulated Leads to Contacts, Initially Reported 820406.Relays Inspected & Insulating Tubing Installed Per GE Ltr.Also Reported Under Part 21 + (03:03:43, 17 December 2024)
- ML20063D130 + (03:03:44, 17 December 2024)
- ML20063D128 + (03:03:44, 17 December 2024)
- 05000325/LER-1982-060, Forwards LER 82-060/03L-0 + (03:03:45, 17 December 2024)
- 05000324/LER-1982-089-03, /03L-0:on 820722,review of Plant Maint Procedure Revealed That post-maint Testing of Primary Containment Isolation Valves Per App J Was Not Established.Caused by Administrative Oversight.Procedure Revised + (03:03:46, 17 December 2024)
- ML20063D122 + (03:03:47, 17 December 2024)
- 05000416/LER-1982-022-03, /03L-0:on 820721,fuel Handling Area Gaseous Effluent Monitor Inoperable.Caused by Fuse Failure.Fuse Replaced & Monitor re-energized.Samples Taken During Period of Inoperability Found Acceptable + (03:03:49, 17 December 2024)
- 05000327/LER-1982-065-03, /03L-0:on 820528,ice Condenser Intermediate Deck Door Found Frozen Closed.Caused by Water Dripping from Leaking Air Handling Unit Condensate Drain Line Which Had Frozen.Ice Removed & Failed Flange Gasket on Door Replaced + (03:03:51, 17 December 2024)
- ML20063D115 + (03:03:52, 17 December 2024)
- ML20063D116 + (03:03:52, 17 December 2024)
- 05000324/LER-1982-089, Forwards LER 82-089/03L-0 + (03:03:53, 17 December 2024)
- ML20063D101 + (03:03:54, 17 December 2024)
- ML20063D098 + (03:03:54, 17 December 2024)
- 05000296/LER-1982-031, Forwards LER 82-031/03L-0 + (03:03:55, 17 December 2024)
- ML20063D096 + (03:03:55, 17 December 2024)
- 05000327/LER-1982-065, Forwards LER 82-065/03L-0 + (03:03:56, 17 December 2024)
- 0CAN088203, Discusses Massive Tone Alert Radio Distribution Program Developed in Response to 820729 & 30 Discussions & 820730 Confirmatory Action Ltr.Oversize Pamphlet Encl.Aperture Card Available in PDR + (03:03:57, 17 December 2024)
- ML20063D088 + (03:03:57, 17 December 2024)
- 05000416/LER-1982-022, Forwards LER 82-022/03L-0 + (03:03:58, 17 December 2024)
- ML20063D086 + (03:03:58, 17 December 2024)