Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20063F087 + (02:54:02, 17 December 2024)
- ML20063F081 + (02:54:03, 17 December 2024)
- ML20063F077 + (02:54:04, 17 December 2024)
- ML20063F058 + (02:54:04, 17 December 2024)
- ML20063F010 + (02:54:05, 17 December 2024)
- ML20063E998 + (02:54:06, 17 December 2024)
- 05000315/LER-1982-060-03, /03L-0:on 820723,while Shutdown for Refueling, Emergency Diesel Generator Rendered Inoperable When Motor Operated Valves on Cooling Water Supply Closed & Power Supply Removed.Caused by Supervisor Error + (02:54:07, 17 December 2024)
- ML20063E982 + (02:54:08, 17 December 2024)
- 05000315/LER-1982-060, Forwards LER 82-060/03L-0 + (02:54:09, 17 December 2024)
- 05000313/LER-1982-020-03, /03L-0:on 820805,while at 100% Full Power,Control Rod 11 of Group 7 Dropped.Caused by Control Rod Drive Mechanism Stator Failure.Stator Replaced + (02:54:11, 17 December 2024)
- ML20063E973 + (02:54:12, 17 December 2024)
- 05000313/LER-1982-020, Forwards LER 82-020/03L-0 + (02:54:13, 17 December 2024)
- ML20063E953 + (02:54:13, 17 December 2024)
- ML20063E951 + (02:54:14, 17 December 2024)
- ML20063E948 + (02:54:15, 17 December 2024)
- 05000237/LER-1982-035, Forwards LER 82-035/03L-0 + (02:54:20, 17 December 2024)
- 05000237/LER-1982-035-03, /03L-0:on 820724,offgas Flow Indicated High During Normal Startup.Caused by Cracked Fillet Weld in 2D1 Feedwater Heater Emergency Spill to Normal Heater Drain Line Connection.Weld Cracked Due to Excessive Line Movement + (02:54:20, 17 December 2024)
- ML20063E934 + (02:54:21, 17 December 2024)
- ML20063E924 + (02:54:23, 17 December 2024)
- ML20063E926 + (02:54:23, 17 December 2024)
- ML20063E923 + (02:54:24, 17 December 2024)
- ML20063E919 + (02:54:24, 17 December 2024)
- ML20063E914 + (02:54:25, 17 December 2024)
- ML20063E912 + (02:54:39, 17 December 2024)
- 05000287/LER-1981-005-03, /03L-0:on 810323,engineering Safeguard Valve 3CS-5 Failed to Operate.Caused by Operator Failure Since Valve Could Be Operated Manually.Valve Operator Will Be Inspected During Next Outage + (02:54:41, 17 December 2024)
- ML20063E906 + (02:54:42, 17 December 2024)
- 05000287/LER-1981-005, Forwards LER 81-005/03L-0.Detailed Event Analysis Encl + (02:54:43, 17 December 2024)
- ML20063E902 + (02:54:43, 17 December 2024)
- ML20063E885 + (02:54:44, 17 December 2024)
- ML20063E875 + (02:54:44, 17 December 2024)
- 05000249/LER-1982-033-03, /03L-0:on 820727,sporadic Group I Isolation Signals Occurred on One Channel & Relay 595-101B Dropped in & Out.Caused by Faulty Main Steamline Temp Switch 261-18B. Contacts Jumpered Until Next Shutdown.Insp Planned + (02:54:46, 17 December 2024)
- ML20063E832 + (02:54:50, 17 December 2024)
- 05000249/LER-1982-033, Forwards LER 82-033/03L-0 + (02:54:51, 17 December 2024)
- ML20063E821 + (02:54:52, 17 December 2024)
- ML20063E817 + (02:54:52, 17 December 2024)
- 05000317/LER-1981-038-04, /04T-0:on 810526,Apr 1981 Bay Water Tritium Sample Concentration Measured 10 Times Higher than Background.Effluent Limits Not Exceeded,Therefore Corrective Action Not Necessary + (02:54:54, 17 December 2024)
- 05000317/LER-1981-038, Forwards LER 81-038/04T-0 + (02:54:55, 17 December 2024)
- ML20063E797 + (02:54:55, 17 December 2024)
- 05000331/LER-1994-001, :on 940107,determined That Test of APRM High Flux Scram Trip Setpoint Inadequate Due to Lack of Awareness.Surveillance Test Procedure for Testing Flow Biased APRM Scram Trip Setpoint Revised + (02:54:57, 17 December 2024)
- 05000318/LER-1981-025-03, /03L-0:on 810430 & 0514,reactor Protective Sys Channel B Trip Units Bypassed to Investigate T-hot Channel B Problem.Caused by Temp Transmitter Drift + (02:54:59, 17 December 2024)
- U-602249, Forwards semi-annual Fitness for Duty Rept for Period Ending 931231 Per 10CFR26.71 + (02:55:00, 17 December 2024)
- 05000306/LER-1982-013-03, /03L-0:on 820719,pressurizer Steam Space Sample Isolation valve,CV-31303,would Not Close on Demand.Cause Unknown.Valve Inaccessible During Operation.Repairs Will Be Made During Shutdown.Manual Valve in Penetration Closed + (02:55:01, 17 December 2024)
- 05000306/LER-1982-013, Forwards LER 82-013/03L-0 + (02:55:05, 17 December 2024)
- 05000368/LER-1982-021-03, /03L-0:on 820603,during Mode 3,main Feedwater Isolation valve,2CV-1024-1,for Steam Generator a Failed to Close Completely.Caused by Design Problem in Large Valve Operators & Electrical Operation After Manual Operation + (02:55:09, 17 December 2024)
- 05000368/LER-1982-021, Forwards LER 82-021/03L-0 + (02:55:12, 17 December 2024)
- 05000335/LER-1982-033-03, /03L-0:on 820721,during Normal Surveillance Testing,Diesel Generator Turbocharger Failed.Caused by Broken Coupling on Soak Back Oil Pump Due to Insufficient Lubrication to Turbocharger Guide & Thrust Bearings + (02:55:13, 17 December 2024)
- 05000366/LER-1982-075-03, /03L-0:on 820724,while at Reduced Power Level of 936 Mwt for Rod Sequence Exchange,Control Rod Drive Accumulator Trouble Alarm Received.Caused by Slow Bleeddown of Accumulator Pressure.Accumulator Recharged + (02:55:15, 17 December 2024)
- ML20063E712 + (02:55:16, 17 December 2024)
- 05000335/LER-1982-033, Forwards LER 82-033/03L-0 + (02:55:17, 17 December 2024)
- ML20063E708 + (02:55:17, 17 December 2024)
- 05000366/LER-1982-075, Forwards LER 82-075/03L-0 + (02:55:18, 17 December 2024)
- ML20063E707 + (02:55:18, 17 December 2024)