Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20064G019 + (01:48:13, 17 December 2024)
- 05000333/LER-1982-055, Forwards LER 82-055/03L-0 + (01:48:14, 17 December 2024)
- ML20064G012 + (01:48:14, 17 December 2024)
- ML20064G009 + (01:48:15, 17 December 2024)
- ML20064G010 + (01:48:15, 17 December 2024)
- ML20064G005 + (01:48:16, 17 December 2024)
- ML20064G001 + (01:48:16, 17 December 2024)
- ML20064F994 + (01:48:17, 17 December 2024)
- ML20064F993 + (01:48:18, 17 December 2024)
- ML20064F991 + (01:48:18, 17 December 2024)
- ML20064F986 + (01:48:19, 17 December 2024)
- ML20064F985 + (01:48:19, 17 December 2024)
- ML20064F982 + (01:48:20, 17 December 2024)
- ML20064F984 + (01:48:20, 17 December 2024)
- ML20064F980 + (01:48:21, 17 December 2024)
- ML20064F979 + (01:48:21, 17 December 2024)
- ML20064F976 + (01:48:22, 17 December 2024)
- ML20064F978 + (01:48:22, 17 December 2024)
- ML20064F972 + (01:48:23, 17 December 2024)
- ML20064F968 + (01:48:24, 17 December 2024)
- ML20064F967 + (01:48:24, 17 December 2024)
- 05000387/LER-1982-068-03, /03L-0:on 821201,discovered That Tech Spec Surveillance Requirement 4.7.6.3.2.a (Carbon Dioxide Storage Tank Level) Not Included in Any Surveillance Procedure. Caused by Human Error.Procedure Revised to Include Checks + (01:48:26, 17 December 2024)
- ML20064F963 + (01:48:27, 17 December 2024)
- RBG-14-081, Confirms 820727 Telcon Between Util,Nrc & Ae Re Control of Heavy Loads.Phase 1 Work Currently Scheduled for Submittal on 830805.Phase 2 Anticipated to Be Complete by First Quarter 1984 + (01:48:27, 17 December 2024)
- ML20064F962 + (01:48:28, 17 December 2024)
- ML20064F958 + (01:48:29, 17 December 2024)
- 05000387/LER-1982-068, Forwards LER 82-068/03L-0 + (01:48:30, 17 December 2024)
- ML20064F956 + (01:48:30, 17 December 2024)
- ML20064F951 + (01:48:31, 17 December 2024)
- ML20064F948 + (01:48:32, 17 December 2024)
- 05000306/LER-1982-027-03, /03L-0:on 821208,containment Vacuum Breaker Isolation Valve Inoperable for Approx 8 H When Air Supply Line Disconnected from Tubing Fitting.No Defects in Mfg or Installation of Fitting Detected.Fitting Repaired + (01:48:34, 17 December 2024)
- ML20064F939 + (01:48:35, 17 December 2024)
- ML20064F941 + (01:48:35, 17 December 2024)
- ML20064F938 + (01:48:36, 17 December 2024)
- 05000395/LER-1982-052-03, /03L-0:on 821204,during Mode 1,main Steam Line a Radiation Monitor RM-G19A Gave Spurious Alarms.Caused by Instrument Drift.Monitor Calibr & Returned to Svc + (01:48:37, 17 December 2024)
- 05000306/LER-1982-027, Forwards LER 82-027/03L-0 + (01:48:38, 17 December 2024)
- ML20064F909 + (01:48:39, 17 December 2024)
- 05000261/LER-1982-019-01, /01L-0:on 821217,calculated That on 821122,boron Injection Tank Vol May Have Fallen Below Level Required by Tech Spec.Caused by Boiling & Draining of Recirculation Lines During Attempt to Dissolve Solidified Boric Acid + (01:48:41, 17 December 2024)
- ML20064F903 + (01:48:42, 17 December 2024)
- 05000261/LER-1982-019, Forwards LER 82-019/01L-0 + (01:48:43, 17 December 2024)
- ML20064F899 + (01:48:43, 17 December 2024)
- JAFP-82-1339, Responds to NRC Re Violations Noted in IE Insp Rept 50-333/82-22.Corrective Actions:Personnel Counseled on Procedures.Procedures Will Be Revised to Include Specific Steps for Simulating Functions + (01:48:44, 17 December 2024)
- ML20064F895 + (01:48:45, 17 December 2024)
- ML20064F892 + (01:48:45, 17 December 2024)
- ML20064F890 + (01:48:46, 17 December 2024)
- ML20064F891 + (01:48:46, 17 December 2024)
- ML20064F889 + (01:48:47, 17 December 2024)
- ML20064F888 + (01:48:47, 17 December 2024)
- ML20064F886 + (01:48:48, 17 December 2024)
- ML20064F881 + (01:48:49, 17 December 2024)
- ML20064F884 + (01:48:49, 17 December 2024)
- 05000338/LER-1978-124-01, /01T-0 on 781116:Svc Water & Component Cooling Piping & Pipe Supports Not Analyzed for Thermal & Seismic Stresses.Design Personnel Utilized Wrong Svc Water Temps for Stress Analysis.Present Analysis Shows Adequate Support + (01:48:51, 17 December 2024)