Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20065H145 + (00:44:55, 17 December 2024)
- 3F0494-01, Forwards Rev 20 to Crystal River Unit 3 Fsar,Reflecting Commitment in to Adequately Reflect in FSAR Portions of Facility TS Not Transferred to Improved TS Implemented at Facility on 940312 + (00:44:56, 17 December 2024)
- NPL-94-0136, Responds to NRC Bulletin 88-010, Nonconforming Molded-Case Circuit Breakers. All Nontraceable Circuit Breakers Identified Have Been Replaced & Associated post-installation Testing Completed + (00:44:56, 17 December 2024)
- JAFP-94-0204, Monthly Operating Rept for Mar 1994 for Ja FitzPatrick Nuclear Power Plant + (00:44:57, 17 December 2024)
- ML20065H113 + (00:44:58, 17 December 2024)
- ML20065H107 + (00:44:59, 17 December 2024)
- RBG-40484, Special Rept:On 940328,Channel 7 of Loose Part Detection Sys Declared Inoperable Due to Invalid Loose Part.Filter Adjusted to Reduce Channel Sensitivity of Background Noise Frequencies While Maintaining Ability to Detect Loose Parts + (00:44:59, 17 December 2024)
- ML20065H081 + (00:45:00, 17 December 2024)
- 05000331/LER-1982-056-01, /01T-0:on 820912,HPIC Area Steam Leak Alarm Activated by Temp Differential Switch TD8-2260A,resulting from Leak Due to Temp Difference Between Ventilation Intake & Exhaust.Caused by False Signal Due to Resistor Failure + (00:45:02, 17 December 2024)
- ML20065H068 + (00:45:04, 17 December 2024)
- ML20065H061 + (00:45:05, 17 December 2024)
- 05000331/LER-1982-056, Forwards LER 82-056/01T-0 + (00:45:06, 17 December 2024)
- ML20065H055 + (00:45:06, 17 December 2024)
- ML20065H051 + (00:45:07, 17 December 2024)
- ST-HL-AE-3568, Revised Part 21 Rept Re Failure of Feedwater Isolation Valve Due to Thermal Incompatibility of Hydraulic Fluid + (00:45:08, 17 December 2024)
- ML20065H048 + (00:45:08, 17 December 2024)
- ML20065H043 + (00:45:10, 17 December 2024)
- ML20065H041 + (00:45:10, 17 December 2024)
- ML20065H039 + (00:45:11, 17 December 2024)
- ML20065H034 + (00:45:12, 17 December 2024)
- ML20065H038 + (00:45:12, 17 December 2024)
- AECM-82-382, Forwards Responses to 820826 Request for Addl Info Re Items 1-8,including Current Status & Submittal Schedule for Outstanding Items.Tf Plunkett Prof Qualifications Encl + (00:45:13, 17 December 2024)
- ML20065H022 + (00:45:14, 17 December 2024)
- ML20065H011 + (00:45:15, 17 December 2024)
- ML20065H021 + (00:45:15, 17 December 2024)
- 05000333/LER-1982-042-03, /03L-0:on 820826,testing of Control Rod Hydraulic Control Unit Accumulator Pressure & Level Switches & Pressure Indication Revealed 68 of 411 Instruments Out of Calibr or Not Operating Properly.Caused by Instrument Drift + (00:45:17, 17 December 2024)
- ST-HL-AE-4765, Responds to Violations Noted in Insp Repts 50-498/94-07 & 50-499/94-07.Corrective Actions:Eccs Sump Hardware Deficiencies Repaired & Design Drawings Corrected to Reflect Installed Design + (00:45:18, 17 December 2024)
- 05000316/LER-1982-075-03, /03L-0:on 820824,following Reactor Trip,Rcs Dose Equivalent & I-131 Concentration Exceeded 1.0 Uci/G Steady State Limit.Caused by Inadvertent Removal from Svc of Chemical & Vol Control Sys Mixed Bed Demineralizer + (00:45:20, 17 December 2024)
- 05000440/LER-1994-008, :on 940225,two SRV Unexpectedly Opened Eight Times.Caused by Inadequate Instructions.Training Provided & Review of Preparation Process for Appropriate Enhancements Performed + (00:45:22, 17 December 2024)
- ML20065G988 + (00:45:23, 17 December 2024)
- PY-CEI-NRR-1734, Forwards Update on GL 89-13 Programs,Including Discussion on Fire Protection Sys + (00:45:24, 17 December 2024)
- PY-CEI-NRR-1236, Forwards Inservice Insp Relief Requests PT-001 & PT-003,per NRC 901002 Telcon Request for Addl Info + (00:45:24, 17 December 2024)
- 05000316/LER-1982-072-03, /03L-0:on 820824,reactor Trip Occurred as Result of Failure in 120-volt Ac Vital Bus.Caused by Burned Out Resistor (R1) & Diode (D1) on Oscillator Board & Associated Fuse.Oscillator Board & Fuse Replaced + (00:45:26, 17 December 2024)
- ML20065G974 + (00:45:28, 17 December 2024)
- ML20065G980 + (00:45:28, 17 December 2024)
- ML20065G973 + (00:45:29, 17 December 2024)
- ML20065G972 + (00:45:30, 17 December 2024)
- 05000333/LER-1982-042, Forwards LER 82-042/03L-0 + (00:45:31, 17 December 2024)
- ML20065G968 + (00:45:31, 17 December 2024)
- ML20065G967 + (00:45:32, 17 December 2024)
- ST-HL-AE-3544, Application for Amends to Licenses NPF-76 & NPF-80,changing Tech Spec 3.3.3.6 Re Action to Be Taken in Event of One of Four Steam Generator Level,Narrow Range post-accident Monitoring Channels Inoperable + (00:45:33, 17 December 2024)
- ML20065G957 + (00:45:34, 17 December 2024)
- ML20065G961 + (00:45:34, 17 December 2024)
- ST-HL-AE-3542, Application for Amends to Licenses NPF-76 & NPF-80,changing Tech Spec 3.3.3.6 to Eliminate Requirement to Shut Down Plant If One of Four Channels Inoperable + (00:45:35, 17 December 2024)
- TXX-3572, Interim Deficiency Rept Re Conduit Supports.Initially Reported on 820823.Evaluation Continuing.Completion Anticipated by 821022 + (00:45:36, 17 December 2024)
- ML20065G951 + (00:45:37, 17 December 2024)
- ML20065G950 + (00:45:37, 17 December 2024)
- ML20065G947 + (00:45:38, 17 December 2024)
- ML20065G926 + (00:45:39, 17 December 2024)
- ML20065G932 + (00:45:39, 17 December 2024)
- ML20065G925 + (00:45:40, 17 December 2024)