Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 8.0 - Electric Power + (16:15:52, 16 September 2018)
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 7.0 - Instrumentation and Controls + (16:16:05, 16 September 2018)
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 6.0 - Engineered Safety Features + (16:16:26, 16 September 2018)
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 4.0 - Reactor + (16:16:37, 16 September 2018)
- WM 16-0008, Wolf Creek Generating Station, Redacted Version of Revision 29 to Updated Safety Analysis Report, Chapter 2.0 - Site Characteristics - Figures + (16:18:10, 16 September 2018)
- CAC:MF7102 + (16:20:01, 16 September 2018)
- LR-N16-0099, Hope Creek Generating Station License Amendment Request - Safety Limit Minimum Critical Power Ratio Change + (16:42:55, 16 September 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System + (17:13:38, 16 September 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls + (17:15:41, 16 September 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figures 2F-2 - 2F-86 + (17:17:09, 16 September 2018)
- RC-16-0083, Virgil C. Summer, Unit 1 - Updated Final Safety Analysis Report, Chapter 2, Figures 2E-1 - 2E-90 + (17:17:15, 16 September 2018)
- NRC-16-0034, Fermi, Unit 2, Revision 20 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls + (17:40:08, 16 September 2018)
- NRC-16-0034, Fermi 2 Revision 20 to Updated Final Safety Analysis Report, Chapter 11 + (17:54:22, 16 September 2018)
- ML16162A209 + (17:55:58, 16 September 2018)
- ML16162A203 + (17:56:19, 16 September 2018)
- TDEFW + (19:33:28, 16 September 2018)
- MDEFW + (19:33:59, 16 September 2018)
- EACE + (19:34:54, 16 September 2018)
- L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-088, Rev. 49, Sheet 1 + (20:20:54, 16 September 2018)
- L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-078, Rev. 14, Sheet 160A + (20:21:00, 16 September 2018)
- L-2016-085, St. Lucie Unit 2, Updated Final Safety Analysis Report Amendment No. 23, Drawing 2998-G-080, Rev. 39, Sheet 2B + (20:21:06, 16 September 2018)
- L-2016-085, St. Lucie, Unit 2 - Submittal of Updated Final Safety Analysis Report Amendment No. 23 + (20:21:45, 16 September 2018)
- 10 CFR 810.12, Reports + (20:52:11, 16 September 2018)
- JNRA + (20:53:00, 16 September 2018)
- CP + (21:19:34, 16 September 2018)
- NL-15-1898, Enclosure 4: EAL Verification and Validation Documents - License Amendment Request for Changes to EAL Schemes to Adopt NEI 99-01 Rev. 6 and to Modify Radiation Monitors at Farley Nuclear Plant. Part 3 of 6 + (21:20:15, 16 September 2018)
- Property:Regex + (21:21:46, 16 September 2018)
- Property:Purpose + (21:30:09, 16 September 2018)
- NEI 99-04, Calvert Cliffs, Units 1 and 2 - Submittal of Amended Update to Updated Final Safety Analysis Report, Revision 48 + (21:57:24, 16 September 2018)
- CAC:MF3416 + (00:05:19, 17 September 2018)
- NEI 99-04, Salem Units 1 and 2 - 2014 Summary of Revised Regulatory Commitments + (01:43:16, 17 September 2018)
- L-2015-260, St. Lucie, Units 1 and 2 - Biological Plan of Study Implementation, Trawl Length Data + (02:28:29, 17 September 2018)
- NEI 99-04, Calvert Cliffs, Units 1 & 2, Submittal of Updated Final Safety Analysis Report, Revision 48 + (03:39:08, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 10.0 - Main Steam and Power Conversion System + (03:40:56, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9-i - 9.3-158 + (03:41:28, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 8.0 - Electric Power + (03:41:38, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 7.0 - Instrumentation and Controls + (03:41:51, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 5.0 - Reactor Coolant System + (03:42:32, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 4.0 - Reactor, Pages 4-i - 4.4-52 + (03:42:43, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3-i - 3.5A-4 + (03:43:05, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.0 - Site Characteristics, Pages 2-i - 2.3-167 + (03:43:30, 17 September 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Table of Contents + (03:43:36, 17 September 2018)
- 1CAN091503, Arkansas Nuclear One, Unit 1 - Evaluations Described Response to Request for Additional Information 15(a), Reactor Vessel Internals Aging Management Program Plan + (03:44:38, 17 September 2018)
- LR-N15-0178, Hope Creek - License Amendment Request, Digital Power Range Neutron Monitoring (Prnm) System Upgrade + (04:01:34, 17 September 2018)
- DCL-15-069, Diablo Canyon Units 1 and 2 - License Amendment Request 15-03 Application of Alternative Source Term - Updated Final Safety Analysis Report Markup. Part 4 of 8 + (05:31:25, 17 September 2018)
- TAC:LA0497 + (06:37:59, 17 September 2018)
- NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme + (08:17:03, 17 September 2018)
- NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. + (08:17:08, 17 September 2018)
- 1CAN031504, Arkansas Nuclear One, Unit 1 - Responses to Request for Additional Information on Update of the Reactor Coolant System Pressure and Temperature and the Low Temperature Overpressure Protection System Limits + (08:22:55, 17 September 2018)
- TAC:MF5809 + (08:38:04, 17 September 2018)
- NL-15-014, Indian Point, Unit 3 - Proposed Changes to Technical Specifications Regarding Reactor Vessel Heatup and Cooldown Curves and Low Temperature Overpressure Protection System Requirements + (09:01:44, 17 September 2018)